首页 市政道路施工方案

市政道路施工方案

举报
开通vip

市政道路施工方案市政道路施工方案 目 录 (1) 施工方案 (2) 施工进度计划及保证措施 (3) 保证质量措施 (4) 保证安全措施 (5) 文明施工现场措施 (6) 劳动力安排计划 (7) 主要材料构件用量计划 (8) 主要机具使用安排 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used...

市政道路施工方案
市政道路施工方案 目 录 (1) 施工方案 (2) 施工进度 计划 项目进度计划表范例计划下载计划下载计划下载课程教学计划下载 及保证措施 (3) 保证质量措施 (4) 保证安全措施 (5) 文明施工现场措施 (6) 劳动力安排计划 (7) 主要材料构件用量计划 (8) 主要机具使用安排 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before (1) 施工方案 一、工程概况 本工程为xx工程。建设地点为xx。 计划工期:20日历天 招标范围:市政沥青道路及配套工程施工(具体以工程量清单为准) 道路工程 沥青道路全长约156m,宽8m,面积1248m2,具体施工为:素土夯实,20cm厚1:3:6三合土,20cm厚C15混凝土垫层,1cm厚橡胶沥青应力吸收层,4cm厚普通中粒式沥青砼,5cm厚改性沥青砼(SAC-25)面层;植草砖采用15cm厚C20混凝土网状植草砖,面积1678m2,具体施工为:路基碾压,8cm厚3:7灰土,3cm厚中粗砂满铺找平,15cm厚C20混凝土网状植草砖,4cm厚表层土壤填充; 二、施工准备 (一)施工组织机构 为了使工程优质、高速、有效地进行,本项目拟组建本公司子龙东路工程项目经理部。经理部下设综合办公室、工程技术科、质检科、计划统计科、物资设备科、财务科、安全科七个管理科室和三个施工队。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 内部管理体制及组织形式见组织机构框图。(见附图) (二)人员准备 在人员的组成上,我们将选定优秀的项目经理、工程技术负责人及其所有的工程技术人员和管理人员。这些人员做到工程师具有相应资质,五大员具有上岗资格证书,而且都具有一定的城市道路施工和管理经验。各个施工队伍我们都将派出具有多次类似工程施工经验的队伍。 为保创优工程,开工前,我们将对上述人员分别进行培训和仔细的技术交底。进一步强化大家的安全意识、质量意识;进一步提高大家的技术素质、文明素质;进一步增强各个专业人员、专业队伍的专业能力和整体战斗能力。 (三)设备准备 根据本项工程的施工内容,本公司将调配能够满足路基土方工程的开挖及填筑、下水管道、路面工程混合料的搅拌、运输、摊铺、碾压等各道工序要求的精良设备(详见《主要机具使用安排》表),做到设备完好率100%。为保证各种设备全过程的正常运转,公司将为此项目配备3个技术过硬的 机修人员。 (四)材料准备 材料的质量直接关系工程质量,材料的取用和调运直接关系到工程的进度。所以材料准备十分重要。一旦中标,我installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 们将对各种材料的货源、质量、产量、价格等进一步的全面调查,精心试验,然后选定供应商,并就规格质量、价格、供应时间、供应数量等问 快递公司问题件快递公司问题件货款处理关于圆的周长面积重点题型关于解方程组的题及答案关于南海问题 及时签订供货 合同 劳动合同范本免费下载装修合同范本免费下载租赁合同免费下载房屋买卖合同下载劳务合同范本下载 ,保证工程的及时开工和连续作业。主要材料、物件见《主要材料、物件用量计划表》。 (五)拌和场建设 为了减少租地、节省开支和土地资源,拟将水泥稳定混合料拌和场、沥青砼搅拌站统建在一起。根据现场考察,拌和场拟建在运输道路、水、电接用方便、离施工区域较近,既可以避免拌和场噪音和粉尘的污染,又可以方便生产的地方。 (六)项目部和施工队驻地建设 为方便管理,尽早开工,项目部和施工队驻地拟在工地附近租用民房。土方工程设备和路面摊铺、碾压、养护及砼管道吊装等设备安排在项目部和施工队驻地旁坪地中停放,拌和场的所有设备停置在拌和场。 (七)弃土场、取土场联系和安排 本项目开工前必须派出专人做好弃土场和借土场的联系工作及其场内运输道路的安排工作。弃土场和借土场应分别满足弃土、借土的数量要求以及借土的质量要求。无论是弃土场还是借土场,我们都绝不损坏周围的生态环境和卫生installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 环境。 (八)作好施工平面布置,完善各处设施。 (九)技术交底和施工放样 开工前,技术负责人向施工管理人员和施工队负责人及其骨干进行全面技术交底,使他们充分熟悉图纸、熟悉规范、熟悉施工程序。一旦开工,要使他们能够紧张而有序,高速优质而又安全文明的工作。 测量组在开工前首先搞好设计单位所交控制桩的复测工作,然后按照分部、分项工程的开工先后顺序,依序作好开工项目的施工放样测量。 (十)编制指导施工实施性的施工组织设计 接到中标通知后,项目技术负责人即着手编制实施性的施工组织设计,指导本项目的施工。 (十一)开工报告 做好上述准备工作之后,项目部即写出开工报告,填好开工申请表,附好必要而又合格的各项有关资料及时上报,争取早日开工。 三、施工部署 (一)施工顺序 本工程施工应遵循先地下后地上、先路中后路边的顺序进行。具体施工顺序如下 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 道路排障?清表?挖道路土方?外运?素土夯实?沥青混凝土填筑?挖沟槽、砼管道基础(砌筑雨水井)?砼管道铺设?树池砌筑?亮化部分?清场、退场 (三)施工布置 工程采用平行流水法施工,按不同专业设置土方施工队、砌筑铺筑施工队,路基施工队、路面施工队、下水道施工队。 土方施工队主要以机械施工为主,配备挖机、摧土机、压路机、自卸汽车等,土方施工队的主要施工任务是:清表土、清淤泥、土方开挖、填筑路床、挖沟槽及相关事务,机械施工的同时,人工配合机械施工,人工主要完成细部检平等机械无法达到的施工区域和机械无法达到精度的工作。 下水道施工队主要完成下水道砼管道铺设,主要施工机具为自行式吊车,人工配合安装,调直、稳管等工作,该队的人工需派有泥工技术的工人操作,主要是调直与安管、稳管。采用技术工种,便于控制工程质量。 路基施工队的材料来源于自建的稳定土搅拌站台,拟用机械摊铺,人工找平,摊铺机械主要采用推土机,在水泥稳定层摊铺时应先修筑实验段,掌握最佳含水量、虚铺厚度、压实时间等影响工程质量的关键因素。 路面施工队负责沥青路面的施工,沥青砼采用红外线自installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 动安平摊铺机摊铺。摊铺时设置好摊铺机耘平板弧度,使之与路拱一直。常用的压实机械有钢轮和轮胎两种压路机。初压应采用轻型钢轮压路机,以整平和稳定摊铺层,避免纵横向推挤;复压选用轮胎压路机,以使混合料密实、稳定成型,这是提高压实度的关键;终压的目的是消除轮迹,形成最后的压实表面,宜选用宽钢轮压路机。压路机的规格、数量与行驶速度应与摊铺机的施工宽度和摊铺速度相匹配。碾压温度与碾压效果关系也很大,高温时混合料塑性大,容易改变空隙而获得较好的平整度;而低温时混合料不易变形,当重型压路机碾压时会形成裂纹,影响平整度和密实度,因此要改变以前等混合料温度降低到110?C才开始碾压的旧习惯。为确保路面平整度,不宜选用轮胎压路机作为终压的碾压设备,同时禁止压路机振动碾压。 砌筑铺筑队主要进行圆形沉井、雨水井等构筑物的砌筑和人行道、盲道板的铺装。 在施工中所用技工皆持证上岗,特种作业人员也将采用相关证件齐全的人员。 四、主要施工方法及技术措施 主要分项工程的施工方案及技术措施如下: (一)道路施工测量 施工场地交叉路口和管线分布复杂,测量放样工作量比installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 较大。为保证工程各结构物平面位置的放样及高程准确,根据工程特点,拟采取如下测量方案: 1(测量设备设置:设置测量组一组,配备水准仪3台,经纬仪2台。 2(设置坐标控制网及水准点:为保证施工测量的连续性和一致性,在施工现场设置足够数量的互相通视的坐标控制点及高程水准点。根据设计图坐标控制点,用全站仪敷设三级坐标控制点并与已交底坐标控制点联网做闭合测量,闭合角度差在允许范围内平差分配得各控制坐标点。这些桩点设置在施工现场内浇灌砼保护,用钢筋桩面刻十字丝保存。每60,100米设一水准点并作闭合导线测量,闭合差在允许范围内平差分配得各水准点高程。设置的坐标控制网及各水准点每隔一月左右做一次复核测量,防止各点的沉降或碰动。 3、根据所设置坐标控制网,直接测放各工程构筑物的平面位置,但须同时用其它坐标控制点进行交汇复核,根据所设置各水准点可以方便进行施工高程测量。 (二)场地清理 拆除原砼路面、基层后对路基施工范围的垃圾、表土予以清除,将一部分先在两旁征用临时用地存放,待路基形成后覆盖在边坡上,一部分堆放于指定的弃土地点。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 对经过水渠或潮湿路段,施工前先挖沟排水,沟沿路线的纵横方向呈方格网形布置,最外侧纵向排水沟,其边缘离红线0.5m,其截面尺寸及横向排水沟间距须满足监理工程师的要求,沟内积水排出路基红线之外,经晾晒、晒干,经监理检查验收合格后进行填土压实。 (三)道路工程 路基施工 一般规定 (1)、路基土方作业,须熟悉图纸,按规定切实做好路基排水和路基处理以及边坡防护工作,确保路基的强度和稳定性。并注意人行道的压实工作。 (2)、挖方或不填不挖段的路基,均须压实至规定压实度。填方必须按规定厚度分层压实。 (3)、路基面表层的草皮、树根应清除干净,路基面以下的墓穴、井洞、管沟应分层加以妥善处理。 填筑作业基本要求 施工中始终坚持“三线、四度”。三线即:中线、两侧边线,且在三线上每隔20m插一面小红旗,明确中线、边线的控制点;四度即:厚度、密实度、拱度、平整度。通过控制路基分层厚度以确保每层层底的密实度;控制住密实度以确保路基的质量及工后沉降不超标;控制拱度以确保雨水及时排出;控制平整度以确保路基碾压均匀及在下雨时不积水。 在路基中心线每200m处设置一座固定桩,在固定桩上标出每层的厚度及标高。每层填土前做出路肩,在路肩两侧每隔50m(局部加密到每隔20m)设置一道临时泄水槽至路基外排水沟与路基填筑同步进行,确保雨季路基上的水及时从泄水槽中排出至市政排水管道中,避免雨水冲刷。 (1)、分层填筑按设计路基横断面全宽纵向水平分层填筑压实。分层厚度根据填筑压实试验段所确定的工艺参数严格控制,路堤每20m设一组标高点,每层压实厚度不大于30cm,不小于20cm,最大虚铺厚度不超过35cm。地形起伏installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 时由低处分层填筑,由两边向中心填筑。边坡两侧各超填30cm宽,以方便机械压实作业,保证路堤全断面的压实度一致,竣工时刷坡整平。根据自卸车容量计算堆土间距,以便平整时控制均匀的分层厚度。 (2)、摊铺整平填土区段完成一层填筑后,先用推土机初平,再用平地机终平,做到填层面在纵向和横向平顺均匀,以保证压路机的碾压轮表面能基本均匀接触地面进行压实,达到压实效果。摊铺时层面做成向两侧倾斜2%,3%的横向排水坡,以利路基面排水。在推土机摊铺平整的同时,对路肩进行预压,保证压路机进行压实时压到路肩不致滑坡。 (3)、洒水、晾晒根据试验段所得出的结论,选择最佳控制含水量,路堤填土的含水量控制在Wopt+2%,Wopt-3%。当含水量超出最佳含水量的+2%时,采取在路基上摊铺、用悬耕机松土晾晒的办法,降低填土的含水量。当含水量低于最佳含水量的-3%时,洒水润湿。 (4)、机械碾压。碾压前,先对填筑层的分层厚度和平整度进行检查,确认层厚和平整度符合要求方能进行碾压。开始碾压时,先用小吨位光轮压路机对松铺土表面预压,然后再用大吨位振动压路机碾压。压实作业按照先压路基边缘,后压路基中间,纵向进退,先慢后快,先静压后振动,由弱振至强振的操作规程进行碾压。碾压施工中,压路机往返行驶的轮迹必须重叠一部分,光轮压路机重叠1/2轮宽,振动压路机重叠40,50cm,相临两区段纵向重叠2.0m。压实作业做到无偏压、无死角、碾压均匀。详见附图。 (5)、填筑压实的几个特殊处理 机动车道下的管道、雨水支管等结构物的埋深较浅,回填压实度达不到验标要求时,可用灰土或砂砾对管沟胸腔、管顶检查井及雨水口周围进行处理。如管顶距路床面小于70cm时的排水管,则采用砼进行360?包封。 路床整修及碾压 (1)、确定路床的纵向中心线、路床宽度和路床的横坡度。 (2)、为了达到设计要求的路床土基的弹性模量值,路床顶面以下30cm深的土层必须达到有关规范、验标要求的压实度。 检验签证采取三级检测制度,即:施工队自检,项目部检查,监理工程师检查。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 建立施工中的实验检测制度,路基检测采用灌砂法。按重型击实 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 试验, 确保最大干密度和最佳含水量。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 碾压施工工艺流程图 稳压 振动碾压 封面碾压 采用自重在10t的用自重 10t 中型采用震力 大于 压机以3~5km/h械以4~5km/h速 30t 的压实机械的速度排压。 度碾压 2~4km/h 的以 速 度 震动碾压。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 路基施工工艺流程图 地质调查 基底清理测量放样 填土前基底处理 不 基底检测 合 填料标准击实 测量下层填土中运土分层填筑 试验 线和边线 格 检查摊铺厚度 推土机摊平 平地机整平 洒水或晾晒 碾压 检测 翻耕 做好记录检查签证 洒水 路基成型 晾晒 不合格 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 基层施工方案 水泥稳定碎石分两层施工。水泥稳定碎石的原材料主要是水泥和碎石。原材 料的质量、配合比设计和施工方案是保证水泥稳定碎石结构质量的重要因素。 工艺流程 原材料检测?试验配合比?配料?检查水泥剂量、含水量?拌和?运输?测量 放样?摊铺,分两层,?初整?稳压?细整?碾压成型?养生 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 混合料拌和 底基层验收 水泥 碎 石 水 测量放线 料 斗 料 斗 路床表面湿润 水泥稳定碎石测量 放样 运 输 出料检测 拌和 机 摊铺 碾 压 检 测 养 生 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 主要施工方法 ,1,、下承层施工准备 复检级配砂砾底基层的高程、宽度、纵横坡度、边坡和平整度均符合要求。没有松散材料和软弱地点。下承层要进行彻底清扫,并适量洒水,保持下承层湿润。摊铺前应将底基层适当洒水湿润,对于基层下层表面,应喷洒水泥净浆,按水泥质量计,宜不小于1.5kg/m2,水泥净浆稠度以洒布均匀为度。 ,2,、施工放样 在已清理成型的经监理工程师验收合格的灰土基层上复测中心线,直线段每20m设一桩,平曲线每10m设一桩,并在路面边缘外侧0.5m设指示桩,进行水平测量,在两侧指示桩上,根据设计高程和实测高程及试验段求得准确的松铺系数,在指示桩指示松铺位置拉上钢丝线。 ,3,、试验 在材料投入使用前选定料源。碎石选用优质碎石集料,碎石的最大粒径及筛分比例应符合设计要求,不得直接使用天然级配碎石。碎石应具有足够的强度和良好的颗粒形状。基层碎石集料压碎值、混合料试件的7天无侧限抗压强度、压实度均应符合设计要求。水泥应有出厂合格证与生产日期。配合比在正式施工前应经过监理工程师或业主,代表,批准。 试验路段:选择100m长的试验路段,根据工程师认可的配合比进行现场摊铺和压实试验。以检验所采用的施工设备能否满足备料、拌和、摊铺和压实的施工方法、施工组织,以及一次施工长度的适应性等。试验路段拟采用不同的压实厚度,测定其干重、含水量及使混合料达到最佳含水量时的压实系数、压实遍数、压实程序的施工工艺。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 通过试验路段试拌得出保持级配稳定和混合料生产控制的方法与体制,通过试铺提出减少离析、易于摊铺、避免早期干缩裂缝、兼顾平整度与压实度要求的工艺配套措施。 ,4,、拌和 水泥稳定级配碎石采用稳定土厂拌设备拌和方法,骨料必须分仓配料,骨料、水泥和水必须自动计量,保证用量准确。拌和时配料根据试验确定的配合比进行配料。拌和过程中的加水量略大于最佳含水量,并尽量做到随拌随运走。拌和前反复调试好机械,以使拌和机运转正常,拌和均匀。各成份拌和按比例掺配,并以重量比加水,对拌和时加水时间及加水量进行记录。拌和时混合料的含水量高于最佳含水量0.5%—1.0%,以补偿后续工序的水分损失,工地实际采用的水泥计量可比室内实验所确定的剂量适当增加,最多不超过0.5,,水泥剂量严格按照设计要求。拌和机生产的混合料保证非常均匀,色泽一致,没有灰条、花团和花面,没有水泥及碎石的粗细颗粒“窝”,当发现有没充分拌和的材料需重新拌和才能使用或把此料剔除堆于一旁。 ,5,、混合料运输 拌和好的混合料尽快运至现场进行摊铺,运输车装载均匀。混合料组织15t自卸车运输。运输时,运输车如果要通过已铺筑路段,速度一定要缓,以减少不均匀的碾压或车辙。我项目部派专人指挥运输车辆卸料,做到安全生产,并做好相应的记录。从第一次在拌和机内加水拌和到完成压实工作的时间控制为3,4h。混合料运输车配置应根据运距、道路状况、摊铺能力等因素综合确定,以满足摊铺要求为准。一般以摊铺现场有1,2辆车等为宜。车上的混合料加以覆盖塑料薄膜以防运输过程中水分蒸发,保持装载高度均匀以防离析。运输混合料的自卸车,installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 均匀地在已完成地铺筑层整个表面上通过,速度宜缓,以减少不均匀碾压或车辙。 ,6,、混合料摊铺与整形 水泥稳定级配碎石基层摊铺时混合料的含水量应大于最佳含水量0.5,,1.0,,以补偿摊铺及碾压过程中的水分损失。运料车在摊铺机前方10cm—30cm停车,由摊铺机迎上推运卸料,边前进边卸料,卸料速度和摊铺速度相协调。 混合料采用摊铺机摊铺,摊铺机两台。摊铺机摊铺混合料时,摊铺机前进速度应与供料速度协调,摊铺速度按3-4m/min控制。摊铺速度要均匀,摊铺应连续,否则将大大影响平整度。 施工中派测量员随时检测摊铺后的标高,出现异常马上采取补救措施。 派专人用拌和好的水泥稳定碎石,对摊铺后表面粗料集中的部位人工找补,使表面均匀,局部水分不合适的要挖除换填合格材料。多余废料不得抛弃路旁,应用小推车随时清出现场。 ,7,、混合料碾压 混合料经摊铺和整形50m左右时即可开始碾压,作为一个碾压段。直线段由边缘向中心碾压,超高段由内侧向外侧碾压,每道碾压应与上道碾压相重叠1/2轮宽,先用光轮压路机稳压一遍, 碾压速度为1.5-2KM/h,然后用重型振动压路机振压3-4遍,碾压速度为2.5-3KM/h,最后用轻型压路机光面。使每层整个厚度和宽度完全均匀的压实到规定的密实度为止。压实后表面应平整、无轮迹或隆起、裂纹搓板及起皮松散等现象,压实度需达到重型击实试验确定最大干容重的97%。碾压过程中水泥稳定级配碎石的表面层应始终保持湿润。如果表面水蒸发的快,及时补洒少量的水。严禁压路机在完成的或正在碾压的路段上调头或急刹车,如必须调头,应在调头处覆盖10cm厚砂砾,以保证基层表面不受破坏。在installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 雨水、污水和其它杆管线检查井等不易碾压到位的部位,用小型机具充分压实。 ,8,、养生 碾压完成后立即进行养生,采用洒水、塑料薄膜覆盖养生,每天洒水次数以保持基层表面湿润为度,养生期不小于7天。养生期间封闭交通,如因特殊原因不能封闭交通时,应将车速限制在15km/h以下,但严禁重型车辆通行。养生前三天选择洒水车撒水,要注意喷头的角度,以避免对水泥稳定级配碎石产生冲刷,造成局部坑槽。 ,9,、取样及试验 施工过程中,混合料应按规范标准进行制作含水量、水泥和七天无侧限抗压强度试验,其试验结果及频率要符合技术规范要求。 ,10,、接缝和掉头处的处理 同日施工的两工作段,应采用搭接。前一段铺筑后,留5,8m不进行碾压,后一段施工时,应加水泥重新拌和,并于后一段共同碾压。 工作缝和掉头处处理,在已碾压完成的水泥稳定土层末端,挖一条横贯全宽的约30cm的槽,直挖到下承层顶面。槽与路的中心线垂直,靠稳定土的一面应切成垂直面,并放两根与压实度等厚、长为全宽一半的方木紧贴垂直面。用原挖出的土回填槽内其它部分。第二天,邻接作业段摊铺碾压后,除去方木,用混合料回填。整平时,接缝处的水稳应较已完成断面高出约5cm,以利形成一个平顺的接缝。 横缝设置,为防止干缩和温缩裂缝,水稳上层施工结束后,建议水稳上层横向每间隔20米切一道横缝,缝宽5mm,深80mm,横缝与道路中心线垂直,横缝用乳化沥青作灌缝处理后喷透层油,在其表面铺设宽2m的聚酯玻纤布后喷installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 粘层油,再正常施工下封层。 纵缝:尽量采用整幅摊铺,避免纵缝。 根据本标段主要工点分布状况和现场踏勘收集的资料,充分考虑本工程的特点和我方施工队伍的专业经验,以及本工程招标文件及设计文件的要求,充分利用当地的既有公路交通、通讯、电力等有利资源,由项目经理部统一部署,迅速展开施工优势,合理配置资源,平行组织施工,加快本标段工程施工进度,确保本工程按工期竣工。 我方精心策划,周密组织,提前防范,全过程控制。我方坚持安全第一、预防为主的方针,项目经理部加大了安全管理力度的同时,给各个施工队配置专职安全管理员和安全检查员,确保工程施工和职工生命财产安全。 我方从进入现场开始就统一全体参战人员的质量意识,及时积极与建设、设计、监理单位、设备主管单位沟通和协调。优化施工组织和施工工艺,积极采用先进的技术装备和质量检测手段,做好全过程、各工序的质量控制,确保实现质量目标,使业主满意。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 5.2面层施工方案 1、材料要求 选用合格的沥青、集料、细集料,各种材料必须检验合格后方可进场,不合格材料不准使用。 2、施工工艺流程 施工准备?透层?下封层?下面层沥青砼?粘层?中面层沥青砼?粘层?上面层沥青砼 3、主要施工工艺 1?洒透层油, 水泥稳定碎石基层碾压完毕且尚未硬化,报监理工程师检验合格后进行透层油施工。透层油用沥青洒布机进行喷洒,要求喷洒均匀,无空白现象发生。每平米喷洒用量0.9L/m2。 ?下封层施工, 见“同步碎石封层施工方案”。 ?沥青混合料拌和, 普通沥青混合料要经过目标配合比设计——生产配合比设计——生产配合比验证三个阶段来确定其最佳配合比,即根据设计提供的目标配合比、油石比投料试配,取成品混合料进行质量检验,并进行反复调整,至混合料的各项马歇尔试验指标符合设计要求为止。并在试验室中检定出混合料的标准干容重,用以指导后面的施工。 各种规格冷骨料由冷料仓通过调速电机控制的小皮带放料到主皮带上,完成骨料的粗配,主皮带把粗配料送入滚筒,通过燃烧器对骨料加热,由热电偶监测installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 料温,自动调节燃烧器的风油比,使骨料温度达到设定值。热料经提升机进入振动筛,把热料按目标配合比的规格要求分筛到不同的热料仓,筛网尺寸可根据要求更换,,由计算机控制各热料仓拉门,按输入的生产配合比自动配料、计量,然后放料到搅拌锅进行搅拌,同时添加经计算机控配比控制计量的石粉及沥青,拌和40秒后,完成成品料的生产。 ?运输,材料运输至施工现场应注意以下问题, A.来料的温度一定满足摊铺温度,即不低于110?,130?,不超过160?为宜,为此在现场应有质量人员对油温进行测定,并做好油温记录。 B.车辆等候时,相互之间应有一定的距离,倒车、停车、卸载应设专人指挥,防止运输车辆与摊铺机发生碰撞影响摊铺质量。 C.自卸车卸料后应将负载卸净,并听从指挥离开,避免混合料倒在摊铺机料斗外影响摊铺工作正常进行。 ?摊铺, 沥青混凝土大面积施工前要进行试验段施工,计划选择200m试验段施工,目的是总结出指导大面积施工时所需的松铺厚度、虚铺系数、碾压程序、碾压遍数等控制指标。试验段施工完毕后将试验段施工总结上报监理工程师,待认可后方可进行大面积施工。 A.高程控制,施工中除底面层挂金属线以外,表面层采用浮动基准梁控制平整度和厚度的施工方法。 B.沥青混合料必须缓慢、均匀、连续不间断地摊铺,摊铺过程中不得随意变换速度或中途停顿,摊铺速度应根据拌合机产量,施工机械配套情况及摊铺层厚度、宽度确定,下面层一般为2米/分钟,表面层一般为3米/分钟。在摊铺过程installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 中,摊铺机螺旋送料器应不停顿的转动,两侧应保持有不少于送料器高度2/3的混合料,并保证在摊铺机全宽度段面上不发生离析,在熨平板按所需厚度固定后不得随意调整。 C.用机械摊铺混合料时,不应用人工反复修整。 D.碾压,碾压过程是面层施工中的重要环节,应合理的选择压路机组合方式及碾压步骤,沥青混合料压实宜采用钢筒式静态压路机、振动压路机、胶轮压路机组合。沥青混合料的压实按初压、复压、终压3个阶段进行。 初压,应在混合料摊铺后较高温度下进行,并不得产生推移、开裂,压实温度控制在110?,140?范围,压路机应从外侧向中心碾压,相邻碾压带应重叠30cm,初压用钢筒压路机碾静压两遍,初压后检查平整度及路拱,必要时作适当修整。 复压,复压先用钢筒振动压路机碾压2遍,后跟胶轮压路机碾压4遍,达到要求的压实度,并无明显轮迹,使用振动压路机时,相邻碾压带重叠宽度为10,20cm,振动压路机倒车时应先停止振动,并在向另一方运动后再开始振动,以避免混合料形成鼓包。 终压,终压应紧接在复压后进行,终压用双轮钢筒式压路机碾压,不宜少于两遍并无明显轮迹,其压实终了温度不低于70?。 ?接缝, 纵缝,为保证整个路面的平整、美观,本工程纵向接缝采用热接缝。使用两台以上摊铺机成梯队同步摊铺沥青混合料,此时两条相邻摊铺带的混合料都处于压实前的热状态,所以纵向接缝易于处理,且连接强度好。如果特殊情况必须设置纵向冷接缝,可以在先摊铺的中间一侧设置挡板,挡板的厚度与铺筑层厚度相installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 同,以便压路机能压实边部并形成一个垂直面。在不设挡板的情况下,碾压后边部会滑移形成斜面。在摊铺相邻之前,应将呈斜面部分切割后除去,在切割后的垂直面上涂粘结沥青,摊铺时新混合料应重叠在已铺带上5-10cm,以此加热接缝边缘的冷沥青混合料。 横缝,摊铺每天的工作缝,及由于多种原因导致摊铺中断,情况消除后再开始摊铺,沥青混合料温度下降需设置横向接缝。横向接缝的关键是混合料的温度变化。温度太高,很容易产生混合料推移,温度太低,横缝不能压实,易造成早期路面损坏。横缝碾压温度一般比正常碾压温度低5?-10?。为了便于铲除混合料,可事先在摊铺临近结束时,在预定摊铺段端约1m长的摊铺宽度范围内铺一层牛皮纸、麻袋,再摊铺沥青混合料,或在摊铺前泼洒足量水,以破坏其与基层的粘结,然后再碾压密实、待混合料稍冷却后,确定切割位置,切割后将尾部混合料铲除,铲除后需立即对切割面清洗,在下段继续摊铺前,要在完全干燥的切割面上涂刷粘层沥青,也可在已压实部分上面铺一些热混合料使之预热软化,以加强新旧混合料的粘结。但在开始碾压前应将预热用的混合料铲除。 ?沥青混凝土摊铺完成在温度尚未降至自然温度时禁止一切车辆上路,防止成品被破坏,应在当天施工的段落两端树立标志,隔断交通。 5.3附属工程施工方案 1、边石施工 从预制厂进路边石时由质量员现场检验,确认合格后方允许使用。路边石须外观良好,不能有缺棱掉角。在乳化沥青透层施工前铺砌,路边石下面采用2cm厚砂浆卧底。铺砌后用水泥砂浆勾缝,并在基础后背回填素土并夯实,表土完成后标高比路边石、集水井或其他结构物低5cm。铺砌好的路边石,必须缝宽均匀、线条顺直、顶面平整、砌筑牢固。每10m钉1个桩,路边石内侧上角挂线。installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 勾缝采用10#水泥砂浆,配比由试验室给出。缝宽1cm,缝顶面比路边石或大方砖顶面低1cm。勾缝处要无杂物。卧底及砌缝砂浆采用搅拌机现场拌和,拌合水泥砂浆时基层上垫铁皮,以免污染基层。做好后养生3天,每天洒水养护,防止碰撞。稳固方砖用橡皮锤敲平,缝宽用1cm厚木板控制。 2、路面排水和雨水口施工 工艺流程,基层验收合格?测量放线?人工挖槽?浇筑雨水口平基?砌筑井墙?安装井圈、井篦?养护及成品保护。 雨水口支管在路面基层铺筑之后挖槽施工,两侧肥槽尺寸30cm。支管采用“四合一法”施工,支管要直顺,管内要清洁,不得有错口、反坡、凹兜存水、管内接口灰浆外露,舌头灰,及破损现象。 雨水口支管采用C15砼包封,砼强度达到75%强度前不得开放交通,施工车辆通过时要采取保护措施。 雨水口与道路工程配合施工。按设定雨水口位置及尺寸开挖雨水口槽,每侧留出30,50cm宽的肥槽。槽底夯实,当土质松软时,换填石灰土,及时浇注砼基础。 在基础放出井墙位置线,并安放雨水管,管端面井室内墙齐平,管端面应无破损。砌筑井墙时,灰浆要饱满,随砌随勾缝,雨水管与墙间砂浆要饱满,管顶发砖旋,井墙砌至要求标高。井周回填要符合路基要求,当井周空隙较小时,用低标号砼灌注。 安放井框、井篦时,井框及井篦须完整、无损,安装平稳、牢固。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before (2) 施工进度计划及保证措施 1.工期目标 本工程拟工期为20日历天。 2.工期保证措施 1、编制合理详细的施工进度计划,动态管理,在实际施工过程中,将根据监理工程师批准的施工计划,建立目标工期计划,根据每天完成的工程项目及工程量通过比较分析,确定按当前施工进度继续施工将对目标工期造成的影响,从而及时对现行计划及资源投入进行调整,达到全工程按动态管理来进行控制,最终实现预期的工程进度计划。 2、制定合理的技术方案 根据进度计划,制定与本工程相应的施工方案和各项工程施工技术措施。施工中随时跟踪进度实施情况,如有比计划滞后情况发生,及时分析原因及影响,并对计划予以调整,同时修订施工方案和有关技术措施,以保证总进度计划目标的实现。 3、根据施工方案的施工面布置,对每个工区每台机械设备指定作业进度计划,使每台机械都有明确的进度计划目标。 4、做好施工测量服务指导工作,及时进行测量放样,检测和验收工作,为现场施工提供良好的测量服务。加强技术人员的现场巡查,尤其质量检测人员要全过程跟踪、检查,及installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 时发现施工中存在的问题并提出解决处理措施。 3.施工组织机构和管理的保证措施 (1)组织机构措施 本工程实行项目法施工。指定有具体而严格的《项目法施工管理实施细则》,工程进度计划的实施是对项目部考核的一项重要内容,并有严格的进度计划目标保证调整措施和奖励政策,工程施工前,项目经理须与公司签订“责任书”,项目部各级主要管理负责人,也要按其职责划分,层层签订“责任书”,明确项目部各级人员的职责。加强管理考核,充分调动全体干部、职工的积极性,从组织和 管理制度 档案管理制度下载食品安全管理制度下载三类维修管理制度下载财务管理制度免费下载安全设施管理制度下载 上来确保工程进度按计划实施完成。 (2)工期管理措施 (1)、坚持施工班组抓工序计划目标,各工区抓日计划目标,项目部抓周计划目标。 (2)、坚持会议协调制度。坚持每日现场例会、每日生产调度会。 (3)、加强现场调度在生产指挥中施工组织、协调、检查、反馈及快速反应的作用。 (4)、对各节点进度实行目标考核,建立进度目标奖励基金,对进度目标的实现情况进行奖惩。 (5)、积极参加业主、监理组织的各种协调会议,积极配合业主和监理。协调与各参建单位及有关社会主管部门的installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 关系,创造一个良好的施工环境,以确保工程进展。 (6)、在施工地质条件、自然灾害等重大原因造成原目标工程不可能实现或施工方案的重大改变,导致较多的作业区施工关系改变时,现行工程与目标工程已不能作出比较,需将目标工程进行维护和更新。在建设各方协调一致认可后,按更新后的目标工程进行实施。 (8)、坚持项目领导和技术人员24小时值班制度,及时协调、处理、解决施工中出现的问题,项目经理和总工程师常驻工地。 (3)人员保证措施 1、我公司计划抽调精干的管理人员,业务熟练的技术骨干和有过类似工程施工经验的作业队伍来组织项目部。配足各专业、各工种的技术工人数量,一是项目部人员精干,业务熟练。从人员素质上来保证工程进度计划的实施。 2、根据进度计划的安排,合理组织劳动力进场,确保施工高峰期有足够的劳动力投入本工程施工。 3、投入本工程的专业技术人员须持有相应的上岗作业证,在施工过程中针对出现的新问题和新工艺进行必要的技术培训。 (4)设备保证措施 1、本工程需用机械数量品种多,必须统一组织,统一调度,合理安排,充分发挥各种机械的最佳效益。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 2、根据施工需要配备数量足够、性能良好的施工机械设备组织进场,并配备一定数量的备用设备,凡投入本工程的施工机械设备进场前均须维护、保养、并经公司机械设备部验收后方可调遣,以确保所有进场设备的完好,保证设备在本工程施工中的正常运行使用。 3、配备数量足够、技术全面、工种齐全的修理力量,加强施工中机械设备的日常维护与保养,各类机械设备均实行机长负责制,并制定奖惩措施,以保证机械设备完好率和利用率分别达到85%和75%以上。 4、对一些采购困难、采购周期长的设备配件预先准备一定数量存放在现场,一旦修理需要能够立即使用。 (5)材料供应保证措施 1、对材料进场道路进行察看,发现问题及时向业主单位反映,确保进场道路畅通。 2、根据工程总进度计划,工程科会同供应科提前编制各施工材料的需求计划,如各种油料等主要材料需求量。 (6)雨季施工措施 1、施工管理期间加强与气象部门联系,应避开大雨天施工,安排好施工计划。做好防雨防滑准备工作,事先准备好防雨防滑防冻材料。 2、防雨措施 (1)、施工区域内的临时建设道路、堆场等必须有良好installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 的防雨措施。备好防雨抽水等材料和机具,并有紧急事故处理措施。 (2)、做好运输道路的维护,采取有组织的排水以保证雨季运输通畅。 (7)农忙季节及传统节日期间保证措施 1、在选择专业劳务队时就考虑农忙季节及我国传统节日期间的出工率,以不受农忙及传统节日的影响。 2、到农忙季节及传统节日前,事先落实劳务队的最大出工率,对选好的专业劳务队在签订劳务合同的时候,对其不影响农忙、节假日出工率的承诺要用经济手段加以制约。兑现承诺时给以奖励,否则,加以处罚。 3、对工期进度计划进行合理编排,公司将对农忙季节及节假日施工期间贡献大的劳务队给以奖励,对在农忙及节假日坚守岗位上班的工人进行经济补助。假日工地不放假,严格执行劳动法规定,搞好职工福利。 (施工进度计划表附后) installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before (3)保证质量措施 质量保证体系 “百年大计,质量第一”保证工程质量是工程建设的基本涵义,也是施工企业生存发展的前提条件,没有可靠的质量保证,企业就难以发展和生存。质量是企业实现兴旺发达的有力保证;工程质量优良,对施工企业来说既是一种社会荣誉,又是一种精神力量,具有巨大的激励作用;而且可以吸引人才、技术、资金和市场。确保工程质量,不仅是施工单位对业主负责,而且对整个社会负责。 建立完善的质量保证体系,强化质量意识,树立质量是企业生命的思想。为了加强领导,控制工程质量和进度,根据我公司的技术力量和装备投入最佳力量,成立工程质量管理部,建立相应的质量管理保证体系。(如图) 质量保证计划措施 为确保项目的工程质量,本项目施工和管理全过程严格贯彻ISO2000版质量保证体系,将公司贯彻YD-ZS-2000(质量手册编制指南)、建筑业企业贯彻GB/T12000版质量管理和质量保证条例标准实施细则等标准而建立的质保体系延伸至项目部,保证工程如期优质交工。本质保计划、措施不包括设计要求,故不把其列入。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 总工程师 项目经理 项目副经理 项目总工程师 施工技术组 质量组 材料设备组 试验室 预质试机资材施 算检验械料料工 员员员员员员员 各施工班组兼职质检员 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 质量保证计划和质量保证措施的有效条件:按照合同承诺,按合同要求产品的保修期限。 施工技术措施 (1)、创优质目标管理网络 质量责任制 质量控制 1、 加强分包项目管理 1、 指定质量控制点 2、 落实岗位责任制 2、 跟踪管理 3、 合分项按工种书面交底 3、 分析改进 4、 和分项质量验收 质量目标 确保本工程一次性合格 工作质量 检查制度 1、 合理设置岗位指定专项制点 1、 加强自检互检专检 2、 跟踪管理 2、 落实整改措施 3、 评定及奖罚 4、建立总承包质量例会 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before (2)、确保工程质量保证体系运行图 项目工程师 方针计划 质量管理活动 检查制度 质量信息 质量责任制 保证部位,工序,督促部门质运用循环~抓全过实施质量三收集、分析 程质量管理 合格率达到85%量管理措施眯到位检查以上 落实 制 收集、反馈 管证管线一次成坚持每道工抓质量攻关项目~加强自检、互优 检、专检 序前的质量开展QC质量活动~ 控制 提高工程质量 信息分析做好台保证竣工工程一质量成本分监督与控制 结果分析 帐 次成优 析与控制 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 各专业班组 每周举行现场质量交流会~严格落 实,管理、作业层,质量责任制~项目经理 生产经理 加强自检~互检~专检制度 (3)、确保工程质量的保证实施措施 根据本工程的工程规模、工程质量、工期及承包方式要求,建立以公司副总经理为挂帅的项目管理班子,挑选技术业务精干,参加过类似重大工程建设的工程技术管理人员参加本工程施工管理,实行项目经理、项目工程师技术质量负责制。 强化项目质量管理保证体系,项目开工前,根据我公司ISO2000版质量保证手册及程序文件要求,编制相应的项目质量保证计划,加强施工过程的质量控制、 施工全过程中,各工序工作必须进行事先交底控制,中间检查,事后验收制度,同时把材料验收制度和计量管理制度。 在努力提高工程实物质量的前提下,同样必须自开工之installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 每道工序 日起自始至按照优良工程的档案资料规定要求做到及时、齐全、正确、规范化的标准。 施工班组自检 施工过程中准确领会贯彻设计意图和要求,主动做好业主、监理、设计、政府有关部门及施工各方之间的配合协调 质量员专检 工作,使工程进度顺利进行。 施工过程中,认真做好各专业、各分包间的配合协调关系,及早解决各工种专业间矛盾,确保工程质量一次达标。 确立确保工程质量的施工工序控制流程: 施工准备 每道工序 不合格返工处理 技术部门:技术交底 施工班组自检 质量员专检 技术部门:质量评定 监督单位检查 建设单位检查 部位工程 工程部:检查 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 技术部:检查 项目工程师核定 具体技术质量控制措施 1)、施工管理措施 为切实搞好本工程管理,确保本工程按期完成,建立本工程管理网络如下: 建立项目经理负责制,讨论分析工程质量、进度及安全文明施工问题,各部门负责人应做了本部门作,成立对外联络小组,负责协调与兄弟单位有关事宜,成立青年突击队,充分发挥年青人的好学、好动、灵活的优势。 2)、一旦我公司中标,我公司将及时做施工前期工作,接收现场后对由业主提供的有关水准点,城市坐标控制点进行复核,验收接收并及时做好保护工作,做好有关书面资料的收集整理工作,为下道工序施工提供可靠的技术保证。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 3)、工程施工前,一待接收施工图纸,即由项目经理、项目工程师组织召集项目部全体施工、技术管理人员认真学习熟悉图纸,了解设计意图和关键部位质量要求和施工措施,并认真参加设计图纸交底,以及施工组织设计的会搞、编制工作,拟订保证各部位、工序质量措施,落实质量交底制度。 4)、现场项目部根据项目质量保证计划的要求,制订一个更具体的质量控制体系,明确每道工序的事前交底,中间验收及最后验收环节的要求,严格执行质量三级验收制度,及时尽早发现问题及时整改,防患于未然,确保工程中每个工序直至部位的施工质量,来保证最终单位工程质量目标。 5)、为确保实现本工程质量目标,各专业工种队伍的选择,必须从我公司范围内调配人员承建同类工程经验的施工队伍进场施工,同时对于项目部专业管理人员的配备方面,也必须配备有多年现场工作经验的管理人员进行现场质量管理,施工过程中加强过程工序控制,从而从队伍素质及管理水平方面确保创优目标的实现。 6)、施工现场加强管理工作,现场各级管理人员都必须岗位明确,从管理体制上保证工程的施工质量。 7)、工程施工过程中,同时必须加强计量工作和工程施工技术资料的整理归档工作,在抓好工程施工硬件的同时,installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 必须抓好软件的管理工作,从而保证工程的施工质量。 8)、建立以项目经理全面负责的质量负责人专职负责的管理体制,保证优良质量管理 建立本工程QC攻关小组,由项目工程师任组长,开发先进施工方案、方法、解决工程施工技术质量难题,切实搞好工程质量。 原材料质量控制措施 加强材料的质量控制,凡工程需用的成品、半成品、构配件及原材料、设备等严格按质量标准采购,合理组织材料供应和材料使用并做好储运、搬运工作,供应部门必须提供所有供产品的合格证,按规程要求必须做好抽样复试工作,质量管理人员对提供产品进行抽查监督,凡不符合质量标准、无合格证明的产品一律不准使用,并采取必要的封存措施,及时退场。 工程竣工档案资料的汇集整理 1、本工程为我公司创优工程,故本工程项目各类档案资料的收集整理工作要求也相应的较高,它反应了整个工程在施工全过程中的技术、质量、进度等各方面的真实情况,作为本工程项目总承包方,我们还将以本工程的资料收集整理作为是常施工管理工作任务之一。 2、本工程文件资料的排列组卷,应按各部位组卷;对于installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 控制点、观察记录等要详尽完整,不得中断,并要求会签齐全,开工报告、竣工报告、图纸会审或专业技术交底等重要资料各项内容填写完全,并加盖各单位公章。 3、根据招标文件合同要求本项目竣工验收时抽建设单位提交完整的竣工图纸及竣工资料。 质量保修期间的服务 在保修期间内,我们将指派专人定期对本工程各部位、工序进行质量检查,对于在质量检查中所发现的质量问题及时予以整改,在质量保修期内定期对业主进行质量回访,对业主反馈的工程质量问题,我们将组织我公司技术、质量、工程部门及时编制整改修正方案,并选择专业队伍进行修理。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before (4)保证安全措施 A、安全保证体系 1、施工现场以项目经理为安全生产的第一责任者,要成立以项目经理为主有施工员、安全员、班组长等参加的安全生产保证的组织机构,并组成安全管理网络。 2、建立项目部领导参加的,包括施工员、安全员在内的轮流值班制度,检查监督现场及班组安全制度的贯彻执行,并做好安全值日记录。 3、建立健全安全生产责任制,安全技术交底,安全宣传教育,安全检查,安全设施验收和事故报告等管理制度。 B、施工安全措施 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 1、在施工中必须贯彻“安全第一,预防为主”的方针,严格贯彻执行各项安全组织措施和技术措施,切实做到管生产的同时管安全,保障职工的安全和施工机械设备不受损害,全面有效地实行安全生产。 2、参加施工的各工种人员,进入施工现场必须戴好安全帽及安全保护用品,施工前进行安全技术教育,强化职工安全意识,熟练掌握本工种的安全技术操作规程。在操作中要坚守岗位,严禁酒后操作。 3、施工现场设机械交通管理员维护交通安全。 4、各种管线检查井,在井筒砌筑完毕加盖井盖后,再拆除四周围挡,防止有人掉入。 5、施工开槽作业必须设专人负责。在开槽作业之前,必须探明地下管线位置、埋深,并在地面上作明显标志,管线周围2m范围内严禁机械作业。 6、电工、焊工、起重工和各种机动车司机,必须经过专门训练,持证上岗。 7、正确使用个人防护用品和落实安全保护措施,进入现场要戴好安全帽,服装整洁。 8、施工现场的防护设施,安全标志和警告牌,不得擅自拆动。 9、夜间施工作业地,必须有足够的照明条件,构槽部installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 位设防护栏及红色警示灯。 10、施工现场严禁焚烧垃圾,严禁明火作业,电气焊等作业区域内,不得有易燃易爆物品,电气线路的敷设要符合有关规定。 11、沟槽施工,应经常检查槽邦土质稳固情况,发现有裂缝、疏松或支撑走动,要随时采取加固措施。根据土质、沟深、水位、采用的施工机具等情况,确定堆放材料和施工机械距坑边距离。往坑槽运材料,应用信号联系。 12、沟槽开挖前要根据土质情况、槽深、水位、工期合理放坡,在放坡有困难时要有牢靠的支撑措施。 13、为了保证沟槽和正在开挖基坑的安全,必须随开挖随在沟槽上方两侧安装防护栏杆,并做好斜撑,以保证支撑牢固。防护栏杆用架子管搭设,高为1.2m,上下两道横杆,下道横杆距地为0.3m。 14、按施工平面图要求布置堆放各种材料、设备、材料必须码放整齐,管材堆放高度应符合规定要求。 C、机电设备安全防护措施 1、机械和用电设备,工作前必须认真检查,确认完好后,方准使用。 2、土方开挖前,要联系有关部门认真检查地下管线障碍物的位置和深度,并用人工挖掘出确切位置。机械开挖到installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 此处时,需留有一定的安全距离,并采用人工挖槽,严禁机械开挖。在开挖前注意和业主办理好地下管线障碍物准许动工手续和保护措施。 3、机械施工时回转半径下方严禁站人和施工操作。 4、电气设备和线路必须绝缘良好,电线不得与金属物绑在一起,各种电动工具必须按规定接地接零,并安装单一行程开关和漏电保护装置,遇有临时停电或停工休息时必须拉闸加锁。 5、受压容器应有安全阀、压力表,并避免暴晒、碰撞。氧气瓶严防污染油脂,乙炔气瓶必须有防止回火的安全装置。 6、手持电动工具要用五线制电缆,戴好绝缘手套,穿好绝缘鞋,各种漏电保护装置齐全。在施工时防止电缆线缠绕到用电设备和其它不安全的物体上。 7、焊接机械应放置在防雨及通风良好的地方,焊接现场不准堆放易燃易爆物品。交流弧焊机变压器的一次线不应大于5m,进线处设防护罩,二次线不宜大于30m。 8、搅拌机应搭设防砸、防雨操作棚,并使搅拌机固定,不得用轮胎代替支撑,移动时必须先切断电源。启动装置、离合器、制动器、保险链、防护罩应齐全完好,使用安全可靠。搅拌机停止使用而升起料斗时,必须挂好上料斗的保险installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 链。维修、保养、清理时必须切断电源,设专人监护。 9、机动翻斗车时速不超过5公里,方向机构、制动器、灯光等应灵敏有效,行车中严禁搭乘人员。往槽、坑、沟卸料时,应保持安全距离并在槽边设挡墩。 10、蛙式打夯机必须两人操作,操作人员必须戴绝缘手套和穿绝缘胶鞋。操作手柄应采取绝缘措施。打夯机用后切断电源,严禁在打夯机运转时清除积土。 11、圆锯的锯盘及传动部位应安装防护罩,并应设置保险档、分料器。凡长度小于50?,厚度大于锯盘半径的木料,严禁使用圆盘锯锯料。破料锯与横截锯不得混用。 12、所有用电机具在操作时必须由专职电工接送电,其他人不得接送。 13、氧气、乙炔和操作点的距离不得少于10m,并要检查是否漏气。 14、电气设备在雨后要进行检验漏电绝缘,防止电路故障。 D、临时用电安全措施 1、建立对现场临时用电线路、用电设施的定期检查制度,并将检查、检验记录存档备查。 2、临时配电线路按规范敷设整齐,架空线采用绝缘导线,不得采用塑胶软线,不得成束架空敷设,也不得沿地面installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 明敷设。 3、配电系统实行分级配电。各类配电箱、开关箱安装时内部设置必须符合有关规定,开关电器应标明用途。各类配电箱、开关箱外观完整、牢固、防雨、防尘、箱体涂有安全色标,统一编号,箱内无杂物;停止使用时切断电源,箱门上锁。 4、独立的配电系统必须严格按标准采用三相五线制的接零保护系统,非独立系统可根据现场的具体情况形成完整的保护系统。 5、手持电动工具,应符合有关规定,电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维护和保管由专人负责。 6、电源照明采用220V,在电源一侧加装漏电保护器,特殊场所要按规定使用安全电压照明器。使用行灯照明时,其电源电压应不超过36V,灯体与手柄坚固绝缘良好,电源线使用橡胶套电缆线,不得使用塑胶线。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before (5) 文明施工现场措施 A、现场容貌环境管理 (1)施工现场及周围无污染,市容整齐清洁。 (2)施工现场无建筑垃圾。 B、现场材料堆放和道路排水管理 (1)大宗材料堆放成堆,克服砂石料混堆或界线不清等现象。 (2)设备按指定地点停放整齐,料具库分类码放。 (3)道路畅通,排水顺畅,现场无积水。 C、分工标志管理 (1)现场管理人员和工人分色佩戴安全帽。 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before (2)现场指挥,管理人员佩戴分工标志卡。 (3)危险施工区域设值班人员并佩戴值班人员工作卡。 (4)危险施工区域挂警示牌和警示灯示警。 D、现场防火管理 (1)现场设置明显的防火标志,健全完善的防火管理制度。 (2)配备足够有效的消防器材。 (3)施工动火要有严格的审批手续。 E、文明运输及外部公共关系管理 (1)土方运输要按有关要求办理准运证。 (2)运输材料、土方、垃圾要有切实可行的防护措施。 (3)泥砂不能随车带出场外。 (4)处理好与施工现场周围有关单位和群众的关系,培养良好的职业道德。 F、临时设施及生活环境管理 (1)严格按施工总平面图规划搭设办公室、工人宿舍等临时设施。 (2)办公室、职工宿舍等临时设施搭设整齐正规,不拥挤,有足够的安全消防通道和良好的采光和通风条件。 (3)改善食堂清洁卫生条件,确保炊具干净,室内无蝇鼠。炊事员必须经身体健康检查符合要求持健康证上岗,并installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 穿专用工作服。定期抽查蔬菜、食品的卫生情况。 (4)工人宿舍内摆放蔬菜,并排出值班表,每日派人清扫,宿舍内不自隔小房间,不乱拉电线,不留外人住宿。 (5)浴室、厕所专人清理,每周喷洒药剂。 (6)临时设施采取封闭管理,并设置值班人员,禁止无关人员随意进出。 (6) 劳动力安排计划 充足配套高素质的劳动力投入,是本工程施工速度、质量、按计划完成的保证,现初拟本工程劳动力安排计划表如下: 施工队伍名称 工作内容 人数 备注 项目部人员 负责工程管理、后勤服务、技术指导 10 准备工作队 清理障碍,搭建临时设施 15 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 配合机械挖、运、填、松、装、卸土方,检土方队 20 部分由准备工作队转入 平路基 负责各类管线的吊管、安管、稳管、排管以管线队 15 及管道基础 安砌检查井、污水检查井、雨水检查井、路该工作队主要由技术娴砌筑队 20 灯接线井的修筑 熟的泥工组成 配合机械负责道路的基层及面层施工以及路基、路面施工队 25 部分由土方工作队转入 人行道基层施工 (7)主要材料、构件用量计划 主要材料、构件用量计划 序号 材料名称 规格型号 单位 数量 备注 1 沥青混凝土 m2 1420 2 安砌侧(平、缘)石 m 605 3 混凝土管道铺设 m 600 6 砌筑检查井 污水检查井 座 15 7 砌筑检查井 雨水检查井 座 15 10 雨水进水井 座 20 11 电气配管 m 649 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 12 电力电缆 m 665 13 路灯接线井 座 21 14 (8) 主要机具使用安排 序号 名称 单位 数量 备注 1 挖掘机 台 1 3 推土机 台 2 4 全站仪 台 1 5 弯钢机 台 1 6 水准仪 台 2 7 沥青洒布机 台 2 8 装载机 台 1 9 稳定土搅拌站 台、套 1 现场搭设 10 自动找平机 台 1 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before 11 打夯机 台 4 打夯机 12 空气压缩机 台 1 13 自卸汽车 辆 6 14 沥青搅拌站 台 1 installation to be familiar with the drawings, and to be familiar with to order materials, know exactly what each part of the mullions used to avoid misattribution. Checks include the following the color is correct, oxide films if requested;section conforms to design including the height, angle, thickness, etclength requirementis easier to control, and therefore work both from a technical as well as management are particularly valued. 2. technology process: checks for vertical models, specifications, check the box in place, ferrule fixed Liang Xiaduan, and top bolted beam three dimensional adjustment. 3. basic operation: (1) check the vertical type and specification: before
本文档为【市政道路施工方案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_005190
暂无简介~
格式:doc
大小:135KB
软件:Word
页数:56
分类:生活休闲
上传时间:2017-09-17
浏览量:78