首页 环保服饰创意大赛策划书

环保服饰创意大赛策划书

举报
开通vip

环保服饰创意大赛策划书环保服饰创意大赛策划书 主办单位:扬州工业职业技术学院团委 承办单位:化学工程系团总支、学生会 the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviat...

环保服饰创意大赛策划书
环保服饰创意大赛策划书 主办单位:扬州工业职业技术学院团委 承办单位:化学工程系团总支、学生会 the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottom 一、活动主题: ............................................................................................................. - 3 - 二、活动目的与意义:................................................................................................. - 3 - 2.1前言 ................................................................................................................... 3 2.2活动背景 ............................................................................................................ 3 2.3活动目的 ............................................................................................................ 3三、活动具体要素: ........................................................................................................ 2 3.1活动时间: ......................................................................................................... 2 3.2活动地点: ......................................................................................................... 2 3.3活动对象: ......................................................................................................... 2 四、活动可行性 分析 定性数据统计分析pdf销售业绩分析模板建筑结构震害分析销售进度分析表京东商城竞争战略分析 :..................................................................................................... 2 4.1经验: ................................................................................................................ 2 4.2优势: ................................................................................................................ 2 4.3.宣传: ............................................................................................................... 3 五、活动筹备与宣传:..................................................................................................... 4 5.1活动宣传 ............................................................................................................ 4 5.2活动筹备 ............................................................................................................ 5 六、活动执行: ............................................................................................................... 6 6.1活动流程 ............................................................................................................ 6 6.2活动报名方式与规则 ......................................................................................... 10七、活动预算: ............................................................................................................. 12 八、相关附录................................................................................................................. 13 8.1报名表 .............................................................................................................. 13 8.2评委打分表 ....................................................................................................... 15 8.3汇总 表格 关于规范使用各类表格的通知入职表格免费下载关于主播时间做一个表格详细英语字母大小写表格下载简历表格模板下载 .......................................................................................................... 16 8.4评分 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 : ....................................................................................................... 16 8.5 参赛队伍作品说明: ........................................................................................ 17 8.6 参赛队伍作品简介: ........................................................................................ 17 corresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring ptom. BotInternal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bear at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should be- 2 - 环保服饰创意大赛策划书 一、活动主题: “创新?环保•和谐”——创新演绎服饰,环保融汇和谐 二、活动目的与意义: 2.1前言 近年来,地球的日益污染,我们的生存环境受到了严重的威胁。我们必须拯救我们的家园、拯救我们的地球。经过去年第一届环保服饰创意大赛的经历,环保、创新、青春的魅力已经深深吸引了一大批推崇和谐生活环境、积极动手实践的生活态度的同学。本次“环保服饰创意大赛”延续上一届的精髓部分,并在更多细节方面进行了补充旨在将“环保服饰创意大赛”打造为化工系在我院第五届大学生艺术展中的品牌活动。 2.2活动背景 环境的保护越来越重要,为了提高大学生的环保意识,积极承担环保的责任,提高大学生的动手能力,拓展大学生的视野,本着创新、负责的理念,我们选择了“环保服饰创意大赛”作为我们的重要活动项目。我们希望通过此次具有创意、挑战性的比赛,不仅能够锻炼同学们的创新能力和动手能力,而且能够磨练同学们的意志和不甘被社会淘汰的精神。 我们的口号是:你的青春,你的激情,你的创意,尽情来吧~ 2.3活动目的 “环保服饰创意大赛”作为大学生艺术展中一个极为重要的项目,目的在于通过 设计 领导形象设计圆作业设计ao工艺污水处理厂设计附属工程施工组织设计清扫机器人结构设计 环保服饰,增进学生的环保意识,展现学生的动手能力和艺术风采,烘托出当代大学生健康、活泼、创新的精神风貌。同时,此次比赛将对进一步丰富学生文化生活起着深远影响,也充分显示我院化学工程系在建设校园文化方面又取得了一个喜人的成就。 现在,为你们提供一个展示卓越才华和如火激情的新舞台,同学们,请激扬 ontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottomhoriz nd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andbe in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould me of s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. CouplCoupliCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. measurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tithe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, thekeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会 你的灵感, 体验那无限创意,把一切的废品,在你的创意中都化为精品吧~ 三、活动具体要素: 3.1活动时间:2012年4月中旬至6月上旬 3.2活动地点:大学生活动中心三楼 3.3活动对象:扬州工业职业技术学院全校师生 3.4组织安排:主办单位:扬州工业职业技术学院团委 承办单位:化学工程系团总支、学生会 四、活动可行性分析: 4.1经验: 环保饰品创意大赛”,这个活动大大提高了全校师生的我们去年成功举办了“ 环保意识,以及提高了他们的创新能力和团队精神。与此同时我们的精英团队还成功策划举办了一系列深受广大师生以及赞助商好评的大型活动。这些都是对我们团队执行力、工作能力的肯定,同时也是让赞助商可以放心与我们合作的原因。 4.2优势: a.作为一款考验动手能力、团队合作以及思想创意的让同学们高度参与、高度合作的活动,它本身就具备了相当大的吸引力和影响力。活动范围覆盖全院、内容丰富多彩、激情澎湃、积极充实。活动执行细节经过经管系学生会与团总支十多个部门的共同讨论以及慎重思考,确保本活动的策划的内容具有充分的合理性和可行性。 r at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should becorresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring ptom. BotInternal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bea2 环保服饰创意大赛策划书 b. 活动执行团队将从十多个部门中进行挑选,达到优质人力资源的整合。从而在各个部门间形成良好的信息沟通网络,使得各部门干事可以信息共享、到达积极合作的目的。同时,与各系学生会积极合作,调动各系新生班干参与在本班级内的活动宣传以及报名工作。 c. 在活动开展之前,会对活动执行团队进行细致的培训以及明确各部门职责(主要部门/工作人员安排明细表),同时提供详尽的《风险预警 方案 气瓶 现场处置方案 .pdf气瓶 现场处置方案 .doc见习基地管理方案.doc关于群访事件的化解方案建筑工地扬尘治理专项方案下载 》从而确保活动可以顺利高效地执行。 d. “环保服饰创意大赛”作为化学工程系的品牌活动之一,在本次第五届大学生艺术展中受到系领导、团总支、学生会的高度重视,在上级支持、资源配置方面获得极大优势。 4.3.宣传: 本次活动我们将在活动前后执行一共四轮的地毯式宣传策略。保证在整个大学生艺术展中做到高密度、高强度的活动宣传。详见:活动宣传部分。 ontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottomhoriz nd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andbe in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origthe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, theing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. CouplCoupliCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. measurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, me of re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tikeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会 五、活动筹备与宣传: 5.1活动宣传 5.1.1 活动会议 召开化工系团总支与学生会委员会会议,讨论前期宣传方案以及执行细节。确定活动宣传主题,落实宣传期间各个部门的工作。 5.1.2 第一轮宣传阶段(4月10号—12号): A .由宣传部负责活动主题海报、主题Logo、选手号码牌、宣传Flash、宣传横幅和传单的设计与制作以及海报的张贴、横幅的悬挂工作。 B .由学术部负责海报、传单以及活动介绍(公关部协调)的文字内容的设定。 C .由文娱部负责在宣传前期选定活动主题音乐的选择,联系学院广播站,配合播出宣传短文。 D .由宿管部负责在饭堂和宿舍派发活动传单,以及机动配合宣传部的工作。 第一轮宣传旨在将活动主题深化,全面铺开。在推广之时提升此次活动知名度以及同学们对活动本身的理解。 5.1.3 第二轮宣传阶段(4月13号—15号): A.由宣传部负责第二轮宣传海报的设计和制作。 由学术部负责制作宣传广播文稿的制作。 B. C.由公关部联系老师或者部门人员对已经报名参加的选手进行基础性的培训工作。第二轮宣传旨在面对参赛人群,吸引观众关注。同时,让选手在比赛前了解相关信息,是比赛能够更加流畅,高质地完成。 5.1.4 第三轮宣传阶段(4月16号—18号): 本阶段集中以海报和广播的形式宣传决赛的基本信息,以及通过校园宣传 Internal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bear at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should becorresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring ptom. Bot4 环保服饰创意大赛策划书 栏张贴首届“环保服饰创意大赛”活动纪念相片,以促进同学们对活动的兴趣,为决赛当天聚集人气。 5.1.5 第四轮宣传阶段(比赛当天): A.由组织部邀请花都电台记者在决赛当晚对此次活动的参与报导, B.由宣传部与宿管部负责成果展示以及联系华汽星空和学院广播站播出比赛结果。本阶段旨在展示个参赛小组的最终作品,拓展活动影响力,提升团总支与学生会形象,以及对为此次活动的赞助商致谢,最后由赞助商致词。 5.2活动筹备 5.2.1 场地准备大学生活动中心三楼(具体情况待定) 5.2.2 特殊人员安排:评委、嘉宾(具体名单于4月20日前最终确定) 5.2.3 物资 筹备项目 筹备时间 筹备方法 备注 桶装纯净水 4月18日前 购买 15日前准备好存瓶装纯净水 放于办公室,一台 饮水机给参赛人饮水机 4月18日前 租借 员,一台给工作人4月18日前 购买 一次性塑料杯 员 海报、评分表格及4月15日前 宣传部 其他书面资料 4月18日前 购买 4月18日送到嘉宾嘉宾邀请函 手中 制作所需工具 4月18日前 购买 生活部 大赛奖品及嘉宾4月18日前 购买 生活部、秘书部 纪念品 音响及相关设备 4月18日前 租借 桌椅 4月15日 学院提供 生活部 备注:物资保管及看管主要由事务部派专人负责。 ng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. Couplontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottomhoriz nd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andbe in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origCoupliing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. measurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, me of re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tithe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, thekeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会 六、活动执行: 6.1活动流程 6.1.1活动整体流程 时间 项目 备注 4月10日~ 活动的前期准备工作 4月15日 4月10日~ 活动宣传的准备工作完成 宣传部 4月18日 4月10日~ 报名表、说明书、评分标准完成 纪检部 4月15日 4月17日 联系各系负责人,介绍比赛相关事项,规则,要求 实践部 4月10日~ 物资准备 实践部 4月18日 4月10日~ 组织部、 拉赞助 4月20日 社团部 4月12日, 宣传、报名 宣传部 4月18日 4月18日 收齐报名表 纪检部 4月12日~ 各小组制作环保服饰作品 4月18日 4月15日, 挑选合适主持 文娱部 4月18日 社团部、4月19日 召开内部统筹会议,安排各项事宜 组织部 Internal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bear at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should becorresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring ptom. Bot6 环保服饰创意大赛策划书 4月18日 邀请评委、嘉宾 团总支 4月11日, 模特培训 4月18日 4月18日, 活动采排 4月19日 4月17日~ 灯光、音响、舞台准备工作 4月18日 4月18日 活动现场安排,布置 4月20日晚 活动正式开始 6.1.2晚会流程 7:00 准备工作完成,闭幕。(全场灯光明亮,放轻音乐)领导,嘉宾,评委, 观众入场。 7:30 开始播放开幕音乐。全场黑暗,只有屏幕处光亮。 7:35 (1)倒数完毕。 旁白(旁白的同时开幕) 主持人开幕时围桌的会议) 闭幕 7:45 (2)节目:(邀请乐队的表演) 7:50 (3)会议结束,拉幕。(即主持人开幕时围桌的会议结束)介绍领导评 委嘉宾赞助商 播放音乐,开幕,道具由舞台左边进场,走到右边,退场。 参赛者分5组出场,进行整体亮相。 (左边进,右边出)走到舞台正中定一定,然后单号走到前台左侧, 双号走到前台右侧,一组人齐后整体退场,(右边退) 第一大组展示(第1—10人) ontal cylinder under state key insertion installation complex measuring cylinder in axial position. BottomhorizCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. nd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andbe in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. Couplmeasurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Couplime of re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tithe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, thekeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会 第二组展示(第11—~20人) 第三组展示(第21—30人) 第四组展示(第31—40人) 8:05 (4)全部出场完毕,主持人上场,请出第一组参赛者(来自XX的参赛者, ~ 选手)播放音乐,参赛者走台。主持在一旁介绍服饰 8:15 (5)主持人介绍第二组参赛者出场,(来自XX的选手, ~ 号选手) tom. BotInternal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bear at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should becorresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring p8 环保服饰创意大赛策划书 播放音乐,参赛者走台。 8:25 (6)节目: 8:30 (7)主持人出场,介绍第三组参赛者出场,(来自XX的参赛者 ~ 号 选手)参赛者走台。主持人介绍服饰 8:40 (8)主持人介绍第四组参赛者出场,(来自XX的选手, ~ 号选手) 播放音乐,参赛者走台。 8:50 (9)节目: 8:55 (10)主持人介绍第五组参赛者出场,(来自XX的选手, ~ 号选手) 播放另一首音乐,参赛者走台。 9:05 (11)互动环节,女主持人在台上问一些关于环保知识的问题,男主持 在台下递麦克风,礼仪生随后发小礼物。 9:15 (12)抽奖:由商家上台抽出五名幸运观众,奖品为小纪念品 9:20 (13)节目:时装秀 9:25 (13)主持人介绍下一个节目:魔术表演。变出获奖名单。 9:35 (14)颁奖仪式。(奖项设定:冠,亚,季军,最佳创意奖,最佳环保奖) 先颁最佳模特,然后到最佳创意,季,亚,冠军各一名 ontal cylinder under state key insertion installation complex measuring cylinder in axial position. BottomhorizCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. nd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andbe in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. Couplmeasurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Couplime of re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tithe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, thekeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会 9:45 (15)结束,主持致闭幕词。道具UFO从右边进场,一直走到左边,退 场。获奖者退场,拉幕。播放UFO飞行音乐。 9:50 (16)闭幕 6.2活动报名方式与规则 6.2.1活动报名 a.报名时间:4月12日,,4月18日 b.报名要求:化工系、建工系、机械系各6支队伍,电子系5支队伍,经管 系3支队伍,国际合作交流中心等其他系各2支队伍。队伍必 须有一个队名,并选出一位队长(主要联系人),提交各队员名 单及联系方式。 c.报名方式:有意参赛的,将名单上交各系负责人。再由各系负责人在截止报 名时间前上交本承办单位。 6.2.2比赛规则 1. 将"青春.绿色.环保"的主题融入服饰艺术的展现中。 2. 制作所用素材要以环保废品为主,也可以适当使用各种辅助材料。 3. 由于比赛所需用具及材料不相同,各组要自行准备好自己所需材料, 并进行必要的处理(如清洁、烘干等)。 4. 制作手段不限。 5. 作品必须主题鲜明,造型新颖,色调和谐,寓意深刻。 6. 比赛开始后半小时仍不到则当弃权处理。 7. 作品的制作工作必须由组员独立完成。如有发现他人帮助,按理扣分。 8. 提前表演完作品的队伍留在原地,并做好作品保护工作。 9. 评分期间,各组可以对自己的作品进行介绍来拉票。 10.比赛时,每支队伍都会由工作人员现场监督,如有特殊要求,必须先 向工作人员提出。 11.若由外界因素干扰造成作品的损坏,由参赛队伍自行采取一定的补救 措施,组织者不承担责任。 ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should becorresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring ptom. BotInternal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bear at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou10 环保服饰创意大赛策划书 6.2.3奖项的设置和评定 1)奖项的设置:比赛设冠,亚,季军,最佳创意奖,最佳环保奖、最佳模特奖。各奖项名额设置如下: 冠军1名 亚军2名 季军2名 最佳创意奖1名 最佳模特奖1名 2)奖项的评定 比赛时间到后,由各参赛队伍分别向各观众讲解有关作品的主题、创意、寓意、造型等。然后由现场评委的打分定出冠,亚,季军,最佳创意奖,最佳环保奖、最佳模特奖,并现场颁发奖状,奖品。 6.2.4突发情况及解决办法: 1.活动进行期间的非人为因素:为了确保活动的顺利进行,执行团队中将成立一个专项处理突发情况的机动应急小组,他们将负责处理例如:活动期间下雨、人员意外损伤、活动物资到位等事件。详见《风险预警应急方案》。 2.晚会比赛过程中观众众多:由纪检部派出工作人员维持现场秩序,防止突发事件。 3.作品的看管:执行团队会派出专人协助参赛队伍看管好作品,以免出现被损坏的情况。 ing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottomhoriz nd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andbe in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. CouplCoupliCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. measurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, me of re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tithe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, thekeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会 七、活动预算: 宣传横幅 4条 200元 宣传海报 4幅 150元 灯光及其它音响器材 1套 3000元 项目 数量 总计(RMB) 的租借 评委礼品 4份 400元 奖品、请柬、证书打印 若干 300元 主持人、礼仪队服装 5套 1000元 其它费用 800元 总计 5850元 备注:其它费用: 礼炮(2*10=20元): 20元 礼品包装纸: 10元 制号码牌用的卡纸(0.8*20=16元): 16元 一次性水杯(2.5*4=10元): 10元 饮用水: 共3箱*两桶 40元 交通费: 100元 准备的工具材料; 300元 应急备用金: 300元 r at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should becorresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring ptom. BotInternal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bea12 环保服饰创意大赛策划书 八、相关附录 8.1报名表 扬州工业职业学院 环保环保服饰大赛报名表 团队名称 团队负责 人 队员人数 队长及队员性别 班级 宿舍 联系电话(短号) 姓名 ontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottomnd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andhorizbe in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. CouplCoupliCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. measurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, me of re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tithe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, thekeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会 ,、报名对象:扬州工业职业技术学院在校学生; (,)、组员可以跨系别进行组团队。 (,)、限定的团队数目为30支队伍(即参赛作品的数量为30份)。 ,、作品要求: (,)作品为环保服饰,种类多样,除了可以自备一些生活废品(例如,纸筒,铝罐,塑料 袋,空盒子,废电池,废布,旧衣服,落叶等等)以外,团总支会提供一些特定的材料。 目的就是将生活中的废品加工成你心中的环保服饰。 (,)作品大小不限(可穿戴在模特身上),天马行空,任你驰骋。作品数量每组最多3 件。 (,)团总支提供的材料有:大卷的透明胶,双面胶,针线。 ,、比赛说明: 从上交报名表后,各个团队的队长到指定的地点领取承办单位给予的材料,在 一个星期内,设计出自己团队的作品,在指定的地点进行展览。 ,、报名时间:4月12日——4月18日 ,、报名方式:到各级的团支书处拿取报名表,报名表复印有效。 ,、交表时间:4月18日 上午:,,:,,——,,:,, 下午:,:,,—— ,:,, ,、交表地点: 化学工程系团总支、学生会办公室 化学工程系 212年4月10日 corresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring ptom. BotInternal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bear at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should be14 环保服饰创意大赛策划书 8.2评委打分表 评委打分表 项目创新性 美观性 合理性(10分) 规范性(10分) 参赛队伍 (40分) (40分) 评委签名 Coupliontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottomhoriz nd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andbe in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. ing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. Couplmeasurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, me of re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tithe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, thekeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会 8.3汇总表格 汇总表格: 分数 评委1 评委2 评委3 评委4 总分 参赛队 8.4评分标准: 创新性:主题鲜明,寓意深刻,构思新颖,设计大胆,不拘一格。35分 美观性:作品外形美观,色调和谐,层次清晰,比例得当,结构合理,有较高的 艺术欣赏性。35分 规范性:取材符合要求,整个作品现场制作。10分 表现性:a.队员对作品的阐述合理、生动、有吸引力。10分 b.台签设计新颖、美观。10分 ct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should becorresecure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be aseseal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in c Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or hange.hould pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not cy movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, sused bmeasurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caosition alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring ptom. BotInternal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position asurement of surface and internal cylinder surface height difference, compared with the original values confirm the location.der mering surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylina time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bear at able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed fou 16 环保服饰创意大赛策划书 8.5 参赛队伍作品说明: 队名 院系专业 作品名称 所需辅助 材料 备注 8.6 参赛队伍作品简介: 队名 作品名称 作品主题 及创意 作品使用 的主要材 料 备注 化学工程系 ontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottomhoriz nd internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical andmeasurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface ahould s too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup sinal value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap ie origing disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to thng Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. CouplCoupliCenter work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. me of re should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the tithe rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, thekeep r. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to80 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotocuracy and consistency. Surface deviation measurement, must in every 1for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of ac ?or 180 ?the same direction of rotation 90 20 化学工程系团总支、学生会
本文档为【环保服饰创意大赛策划书】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_597436
暂无简介~
格式:doc
大小:116KB
软件:Word
页数:0
分类:生活休闲
上传时间:2018-01-13
浏览量:12