首页 低温烘干臭氧灭菌柜使用说明书

低温烘干臭氧灭菌柜使用说明书

举报
开通vip

低温烘干臭氧灭菌柜使用说明书低温烘干臭氧灭菌柜使用说明书 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. ...

低温烘干臭氧灭菌柜使用说明书
低温烘干臭氧灭菌柜使用说明书 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar JB-T350型臭氧灭菌柜适用于制药、生物制品、医院、化工等行业,对模具、包装材料、工作服、容器等作低温烘干消毒灭菌,完全可以替代紫外线灯照射和高温高压消毒,决无二次污染。可广泛应用于电子、光学、制药、生物制品、化工、遗传基因工程等行业。 设备使用程序 JB-T350型低温烘干臭氧灭菌柜,由壳体、风机、排湿控制系统、恒温烘干控制系统、次高压变压器、臭氧发生原器件、工作室、控制部分组。 1(接通电源,电源指示灯红色按钮亮,电压表显示电源电压,机器 进入准备工作状态。 2(被消毒物品摆放宽松,关闭柜门,关闭排湿口,预防臭氧泄漏。 3(把转向开关指向消毒档,电源指示灯红色按钮亮,设置机器消毒 工作时间,时间通常设置40,60分钟。(用户可参考灭菌检测效 果设置时间),注意:设置工作时间一般不超过180分钟。 4(按下绿色启动按钮,绿色工作指示灯亮,红色电源指示灯灭,定 时器开始计时,电流表显示工作电流,风机同时启动,机器进 入消毒状态。 5( 机器工作至消毒预设时间时(消毒灭菌结束),自动停机,此时temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 绿色工作指示灯灭,红色电源指示灯亮,机器进入低温烘干准 备工作状态。 6( 加热之前,设置机器工作时间,时间根据具体使用情况设定; 设置加热温度,最高不得超过60?。时间不得超过180分钟。 7( 打开排湿口进行排湿。 8( 时间、加热温度设置好时,把转向开关转向加热档,定时器开 始计时,电流表显示工作电流,风机同时启动,机器进入低温 烘干状态。 9( 机器工作至加热预设时间时(加热烘干结束),自动停机。 10(机器正常工作时,若需临时停机,则把转向开关转向空档即可。 11(长期停机请切断电源。 bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 一般故障排除 状态 故障现象 故障排除方法 检查电源插座,插头是否松 动 电源指示灯不亮 接通电源 电压表无显示 保险座、保险丝是否松动或 者熔断 进行修复或更换保险丝 绿色指示灯不亮 时间继电器后座松动 按下启动按 时间继电器不显中间继电器底座松动或损坏 钮 示 进行修复或更换同型号继电(灭菌) 无臭氧产生 器 时间继电器后座松动 绿色指示灯不亮 按下启动按中间继电器底座松动或损坏 时间继电器不显钮 示 热敏探头是否正常、交流接(加热) 触器是否损坏、温度数显仪无升温现象 是否损坏 到设置时间不停 机 臭氧室工作时间继电器受强磁场干扰或正常 损伤 计时器显示重复 计时 时间继电器损坏 臭氧室工作到设置时间不停 正常 机 更换同型号计时器 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 计时器没有显示 电源电压显电流表无电流显检查主机保险丝(电源线是示正常计时示 否完好,检查风机、保护继器工作正常 电器是否损坏,予以更换 臭氧室不工作 以上故障,如果用户无法排除,请与公司联系,以便及时为您服 务。 注意事项 1、搬移时,请务必注意避免碰撞,小心轻放。 2、若自行移动,请将机器放置于通风良好的洁净环境,切勿将本机 置于潮湿处,避免高压件受潮。 3、参照电气原理图(见附件)安装接线,机壳要可靠接地,非专业 人员严禁随便操作该机器。 4、设置工作时间不超过180分钟。 5、臭氧室内有高压装置,非专业人员,严禁打开上盖。 bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 主要技术参数 设备名低温烘干臭氧灭菌柜JB-T350 称 功率 臭氧产电源 臭氧浓度 外型尺寸 (KW) 量(g/h) (V/Hz) (PPm) L.W.H( mm) 外:740*610*1700 220V/50H 0.99 6 ?50 z 内:600*510*1150 CD11S(DHIIS) CD14S(DH14S) 系列数显时间继电器 JSS48A(DH48S) 使用说明书 一、概述 本系列数显时间继电器,均采用中规模集成电路LED数字显示,数字拔码开关预置,具有设定方便,工作稳定可靠,并设有不同时基开关供选择,用户可按所预置的时间接通或断开电路。 temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar 二、技术参数 1、电源电压:AC 50H、24V、36V、110V、127V、220V、Z 380V、DC 24V;额定工作电压85,,110, 2、延时控制精度:AC 频率精度0.05S; DC 误差,?0.3%+0.5S; 3、触头与容量:AC220V,3A(阻性)DC;28V,6A; 4、功耗:?3W; 5、环境温度:,20?,,40? 66、机械寿命:?10次 5 7、电寿命:?10次 8、海拔高度:?2000m 延时范围 CD11S CD14S JSS48A 延时范围 时 1M-99H99M 分 1S-99M99S 秒 0.01S-99.99S 9、使用说明 把数字开关及时基开关预置在所需的位置、待预置后接通电源,此时数显将从0开始计时,当达到所预置的时间时,延时触点实行转换,数显保持此刻的数字,实现了定时控制。 bar 50mm, shall not be located in the same room. Wooden long according to the design you want to ... An 5-16 organization name project name Inspector serial number check check check the comments on the contents of the project 1 mixer body with mortar installation smooth and solid, grounded or the zero connection protection meets the requirements, leakage protection is sensitive and reliable; Rain requires for operation shed meet, hanging for safe operation and drainage measures protection from transmission parts, clutches, brakes and other compliance, hopper wire rope must remain at least three times; Hopper safety chains, hooks, and lever safety devices are complete and valid; Protective cover, cover complete and valid; Mortar machine handles application disc. Inspection date 2 wood (pressure) exposed part of the plane must have a protective cover. For outdoor use, to shed rain operation; Plane blade with protective hand guard, rolling plane equipped with spring-back safety device; Leakage protection sensitive and effective, grounded or the zero connection protection meets the requirements. Inspection date 3 chain saws (circular saws), guard, safety devices and Crescent shield meets the requirements; Complete transmission parts guards firmly; Operations must be one-way push switches; Leakage protection sensitive effective ground-zero connection protection is good. Shield inspection date 4 hand-held electric motor operated tools are complete and valid, and the rubber lines may not be damaged; Earth leakage protective device shall be mounted correctly and sensitive and effective and ground fault protection is good; Grinding stone electric overhead lines, the operator should wear insulated shoes, wear insulated gloves; Frog-type ramming hand should be wrapped on insulating materials, the operator should wear insulating gloves. Inspection date 5 welding machine zero connection protection, leakage protection devices complete, secondary no load pressure or leakage protection device effectively; Reliable rain protection measures, protective covers to complete the access line and set a reasonable; Welding line, and well insulated, installed correctly, a power supply line length does not exceed 5M, two times the length does not exceed 30m, welder power supply be used moving boxes. Inspection date II serial number check check check 6 steel shields and reliable mechanical transmission parts randomly switches push button should be used; Neutral or ground meets the requirements, rain sheds for outdoor job settings. Check date 7 pump power cable insulation-good, shell the zero connection protection effective; Motor load lines shall be YHS waterproof rubber-sheathed cable, length should not be less than 15m, may not withstand external force; Leakage protection meet the grade requirements. Check date 8 cylinder gas bottles are clearly marked, there was shock, protection CAP, explosion-proof, shock-proof, Sun protection measures. Piling piling machinery, machinery, temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar清零功能用作断开延时使用:在任意时刻接通清零端子延时触头 将回复到初始位置,断开后数显从0开始计时,利用此功能,将清零 端接外控触点实现断开延时。 在任意时刻接通暂停端子,计时暂停,显示将保持此刻时间,断开 继续计时(利用此功能可作累时器使用)。 在强电场环境中使用,如果清零及暂停导线较长时,请使用屏蔽 导线。 注:清零及暂停端子切勿从外输入电压,以防损坏继电器! temporary construction organization design requires the implementation of the overall layout. 2 site near the high voltage line protection near power lines to have a reliable protective measures protective closely, to meet safety requirements. 3 branch set up distribution box into outlet sleeve and a cross arm to be used; Access to wires neatly, reasonable matching; Prohibited the use of insulation is poor, aging skin, broken wires, to prevent leakage; Should be fixed by insulators, and overhead laying; Line the hallway to have a reliable protection; Direct buried lines, laying depth of not less than 0.6m, leads to the ground from the 2m height to the ground at 0.2m, you must set up protective casing. 4 spot lights hand-held lamp 36V safe voltage should be used; 36V safety at hazardous voltages, particularly in hazardous areas using 12V; Lighting wires should be fixed on the insulators; Insulated rubber sheathed cable for field lights, lighting the use of sheathed wires; Lighting circuits and lighting from the ground not less than the prescribed distance, prohibited the use of electric arc furnace; To prevent the wire insulation is poor, aged, broken skin and leakage, with tungsten heating is strictly prohibited. 5 to set up low-voltage lines are not allowed to use bamboo poles, pole cross arm should be established and insulators; Fine wires can not be mounted on scaffolding or tree branch; Overhead lines required high enough off the ground. 6 electric ... Project name: 5-5-2 sequential order of the subsidence observation observation point number support (supporting) and diagrams year month day year month day year month Day, the distance (m) deformation (mm) the relative distance (m) deformation (mm) the relative distance (m) deformation (mm) today this this this this cumulation Engineering formwork supporting system self-test State observer records form template project name: construction site: construction: support materials: Ann 5-6 serial number check project check requirements behave records results 1 construction programme programme full, support system design calculation, and approval procedures complete, job Qian should for security low-down, low-down material full 2 support material support column material: wood Rod application pine or FIR, shall not used easy deformation, and decay, and split crack, and dry section of wood; as used pipe, pipe od shall not is less than φ 48x3.5 of pipe, no serious rust, and crack, and deformation 3 column stable column bottom of pad material, Shall conform to the construction design requirement, do not use bricks blocked up by construction organization design requirements, support height () when m, between columns of the level of support set () road horizontal support, vertical scissors spacing (), m, spacing for horizontal scissors () m. Column spacing in accordance with design requirements, portrait () mm, transverse () mm pole joints should be staggered, long bar
本文档为【低温烘干臭氧灭菌柜使用说明书】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_496339
暂无简介~
格式:doc
大小:98KB
软件:Word
页数:30
分类:生活休闲
上传时间:2017-11-10
浏览量:40