高中政治必修二知识点归纳
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
1
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
、真实、
广泛的
民主
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
(
1
)国家:
国家都
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
是经济
上占统
治地位
的阶级
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
进行阶
级统治
的工
具,阶
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
级性是
国家的
根本
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
属性。
(
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
2
)我国
的国家
性质:
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
中华人
民共和
国是工
人阶级
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
领导
的、以
工农联
盟为基
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
础的人
民民主
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
专政的
社会主
义国
家。
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
(
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
3
)人民
民主专
政的最
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
大特
点:对
占全国
人口绝
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
大多数
的人民
实行民
主,对
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
极少数
敌视和
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
破坏社
会主义
事业的
敌对分
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
子实行
专政。
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
民主的
优点:
广泛性
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
(
表
关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf
现
在广泛
的民主
权利和
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
民主主
体的广
泛性)
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
真实性
(表现
在人民
当家作
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
主的权
利有制
度、法
律和物
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
质的保
障,人
民
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
能够自
己管理
国家,
也表现
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
在随着
经济的
发展和
社会的
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
进步,
广大人
民
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
的利益
得到日
益充分
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
的实
现)
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
(
4
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
)新型
的专
政:对
极少数
r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be
5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
2
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
1
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
2
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
:
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
3
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
: 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5
高中各年级
课件
超市陈列培训课件免费下载搭石ppt课件免费下载公安保密教育课件下载病媒生物防治课件 可下载高中数学必修四课件打包下载
教案
中职数学基础模块教案 下载北师大版¥1.2次方程的根与系数的关系的教案关于坚持的教案初中数学教案下载电子教案下载
习题汇总