首页 高中政治必修二知识点归纳

高中政治必修二知识点归纳

举报
开通vip

高中政治必修二知识点归纳高中政治必修二知识点归纳 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good worksh...

高中政治必修二知识点归纳
高中政治必修二知识点归纳 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 1 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 、真实、 广泛的 民主 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be ( 1 )国家: 国家都 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 是经济 上占统 治地位 的阶级 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 进行阶 级统治 的工 具,阶 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 级性是 国家的 根本 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 属性。 ( r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 2 )我国 的国家 性质: r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 中华人 民共和 国是工 人阶级 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 领导 的、以 工农联 盟为基 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 础的人 民民主 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 专政的 社会主 义国 家。 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be ( r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 3 )人民 民主专 政的最 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 大特 点:对 占全国 人口绝 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 大多数 的人民 实行民 主,对 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 极少数 敌视和 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 破坏社 会主义 事业的 敌对分 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 子实行 专政。 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 民主的 优点: 广泛性 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be ( 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf 现 在广泛 的民主 权利和 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 民主主 体的广 泛性) r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 真实性 (表现 在人民 当家作 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 主的权 利有制 度、法 律和物 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 质的保 障,人 民 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 能够自 己管理 国家, 也表现 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 在随着 经济的 发展和 社会的 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 进步, 广大人 民 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 的利益 得到日 益充分 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 的实 现) r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be ( 4 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be )新型 的专 政:对 极少数 r V-6/1.5M3 1 2012.12 15 160 good shop air spray gun (zinc) ZQP-2 2 Shanghai 2009 2012.12 16 113 good workshop rust sandblasting machine 1 set 2008 2012.12 17 123 good workshop manual hoist, Shanghai Zhejiang Wuling 2011 3T/5T 12 13 6 good workshop 2012.12 18 high pressure Airless spraying machine King56:1 1 Shanghai 2005 2012.12 19 25 good workshop angle grinder P125 4 Germany 2011 60 good shop top 0.5T~10T 12 2012.12 20,000 pounds China's 2009 50 good shop 2012.12 21 magnetic drill/hand ... Center height installation for base, each installed segment both up and down, left and right dimension. Height deviation control within 2mm. Such as steel, reinforcing Tian Ding, concrete-reinforced concrete. Ming following half of the starting unit, from the plant to the reverse direction of flow section on installation. 4) installation erected on site design cable crane 3 ton machine, using a cable machine hoisting steel pipe. Cable selection ? 24mm* main cable, with ? 15mm steel wire rope for lifting and towing ropes, hauling, lifting machines of 5 tons *2. 5) installation installation process as follows: lifting ? ? connection ? adjust ? fixed touch up ? ? ? welding ? cleaning polishing completed. According to the construction units to provide the town Pier and vertical control points, after it has been checked, survey release tube installation required by the buttress of the town center and vertical, steel pipe is in place, with strings, hammer line, horizontal pipe and steel tape measure pipe and elevation. Preliminary fixing of seams, taking into account the pipe Center not to shift, steel pipe seam, fixed with angle (angle iron against the base at one end and temporary welding of welding and steel tubes), guaranteed by section steel pipe joints not to shift. Pipe joints with wedge plates, z font code and screw TURNBUCKLE tie, also by shearing tools check and clearance, hammer, level and line pipe and steel tape repeated orifice and pipe straightness. Fixed pipe after the deviation of the DL5017 specification. (4) steel pipe installation step 1) in submitting construction plans, should detail pipe installation and use of equipment, installation, temporary works, quality inspection procedures and security measures, and so on. Pipe installation work shall comply with the provisions of chapter DL/T5017-2007 5th. 2) is used to measure height, distance and install the axis reference points for installation of control points should be clear, strong and easy to use, and should be preserved to the installation acceptance before they can be 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 2 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 1 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 2 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 3 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 34: 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 5 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 : 23 : 5 5 1 5 5 5 5 : 5 3 5 4 5 5 5 33 33 4: 3 4:4 35 :5 4 :5 4:3 4::5 1445 : 44 5: : 2: 35 :43 4 3 5 5 5 5 5 5 5 5 2 35 5 5 5 5 23 3 5 5 5 5 5 : 3 5 5 5 高中各年级 课件 超市陈列培训课件免费下载搭石ppt课件免费下载公安保密教育课件下载病媒生物防治课件 可下载高中数学必修四课件打包下载 教案 中职数学基础模块教案 下载北师大版¥1.2次方程的根与系数的关系的教案关于坚持的教案初中数学教案下载电子教案下载 习题汇总
本文档为【高中政治必修二知识点归纳】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_624976
暂无简介~
格式:doc
大小:284KB
软件:Word
页数:88
分类:生活休闲
上传时间:2017-10-20
浏览量:43