首页 熊海虹主编《高等学校研究生英语综合教程 上》课后练习答案

熊海虹主编《高等学校研究生英语综合教程 上》课后练习答案

举报
开通vip

熊海虹主编《高等学校研究生英语综合教程 上》课后练习答案熊海虹主编《高等学校研究生英语综合教程 上》课后练习答案 Unit One Task 1 1.A 2.C 3.B 4.C 5.D 6.D 7.D 8.C 9.A 10.D 11.A 12.B Task 2 1.public(c) 2.discipline(b) 3.strength(a) 4.reference(a) 5.strength(d) 6.public(a) 7.demonstrated(b) 8.discipline(c) 9.references(c) 10.personality(a...

熊海虹主编《高等学校研究生英语综合教程 上》课后练习答案
熊海虹主编《高等学校研究生英语综合教程 上》课后练习答案 Unit One Task 1 1.A 2.C 3.B 4.C 5.D 6.D 7.D 8.C 9.A 10.D 11.A 12.B Task 2 1.public(c) 2.discipline(b) 3.strength(a) 4.reference(a) 5.strength(d) 6.public(a) 7.demonstrated(b) 8.discipline(c) 9.references(c) 10.personality(a) 11.discipllining(d) 12.demonstrates(a) 13.public(d) 14.reference(b) 15.personality(c) Task 3 1.employment 2.paid 3.adjust 4.setting 5.discouraged 6.credit 7.cite 8.demonstrate 9.teamwork 10.rules Unit Two Task 1 1.A 2.B 3.B 4.C 5.B 6.A 7.B 8.C 9.A 10.C Task 2 1. bud (n.); budding (adj.)2.access (n.); access (v.) 3. taste (n.);tasted (v.) 4. fool (n.); fooling (v.) of the installation of templates installed, the measurement method, set the necessary ... (3) cleaning and coating of the template in the template should be cleaned before each use and anti-rust protection of mineral oil, oil-contaminated concrete shall not be used, and should not affect the quality of concrete or reinforced concrete. Timber formwork used in baking or other protective materials of paraffin wax. (4) the template removal template removal time, in addition to construction drawings provided, shall also comply with the following provisions: no load-bearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, shall not be removed; Pier, wall or column when its strength not less than 3.5MPa part of a template, can be removed. Special template removal time, report to the supervisor for approval. Demolition of reinforced concrete or concrete structure bearing the template shall conform to the construction drawings, and shall comply with the provisions of the previous paragraph. Calculation and test review, the actual strength of concrete structure is able to withstand gravity and other practical load, shall be subject to approval of the supervisor, early form removal. Prestressed concrete structure component or template removal, in addition to conforming to the requirements of drawings, templates should be removed before tensioning the side; die after pre demolition should be established structures or components. Standard structure types of Dismounting bearing template structure span (m) of concrete strength standard values of percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 100 hanging arm component ? 2 75 hanging arm component >2 100 7.3.5 concrete layered points block (1) layered pouring job 1) by supervision engineers approved of pouring layered points block and pouring program for construction, in cant pouring Shi from minimum at began, until keep horizontal. 2) substandard concrete non-warehousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) pouring of concrete, is strictly prohibited in the cabin with water, such as poor workability, take measures such as strengthening vibration to ensure quality. (2) pour pouring concrete breaks continuity, pouring allows the interval determined by experiment, exceeds the allowable interval by 5. produces (v.); produce (n.)6.garnish (v.); garnishes (n.)7. reigns (v.); reign (n.) 8. concern (n.); concerned (v.)9. named (v.); name (n.) 10. practiced (v.); practice (n.) Task 3 1) integration 2) choice 3) handed 4) aspiring 5) steaming 6) masterpieces 7) pleasure 8) partake 9) amazing 10) presented Unit Three Task 1 1.A 2.B 3.C 4.B 5.A 6.B 7.C 8.A Task 2 1. stack up against 2. struck a chord 3. amounted to 4. chopping off 5. appeal to 6. pick up on 7. turned out 8. fade away 9. brought together 10. pulled off 11. thrust upon 12. be kept clear of Task 3 1) swirling 2) delivered 3) glowed 4) intervals 5) converge imum arvision engineers approved of pouring layered points block and pouring program for construction, in cant pouring Shi from minging arm component ? 2 75 hanging arm component >2 100 7.3.5 concrete layered points block (1) layered pouring job 1) by supe0 hanof percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 10 components. Standard structure types of Dismounting bearing template structure span (m) of concrete strength standard valuess or of drawings, templates should be removed before tensioning the side; die after pre demolition should be established structure rly form removal. Prestressed concrete structure component or template removal, in addition to conforming to the requirementsor, eagth of concrete structure is able to withstand gravity and other practical load, shall be subject to approval of the supervisction drawings, and shall comply with the provisions of the previous paragraph. Calculation and test review, the actual strennstrusupervisor for approval. Demolition of reinforced concrete or concrete structure bearing the template shall conform to the co olumn when its strength not less than 3.5MPa part of a template, can be removed. Special template removal time, report to theall not be removed; Pier, wall or cbearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-ion to construction drawings provided, shall also comply with the following provisions: no loadk used in baking or other protective materials of paraffin wax. (4) the template removal template removal time, in additcontaminated concrete shall not be used, and should not affect the quality of concrete or reinforced concrete. Timber formwor-l oil, oilrust protection of minera-plate in the template should be cleaned before each use and antiof the installation of templates installed, the measurement method, set the necessary ... (3) cleaning and coating of the temtinuity, pouring allows the interval determined by experiment, exceeds the allowable interval bych as poor workability, take measures such as strengthening vibration to ensure quality. (2) pour pouring concrete breaks conpouring of concrete, is strictly prohibited in the cabin with water, suwarehousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) -t began, until keep horizontal. 2) substandard concrete non2 6) wanderings 7) navigate 8) jealousy 9) presence 10) absorbed Unit Four Task 1 1.A 2. A 3. C 4. B 5. B 6. C 7. D 8. C 9. A 10. C Task 2 1. maintained (a) 2. romantic (a) 3. essential (a) 4. essentials (c) 5. dimension (c) 6. intimate (a) 7. maintains (c) 8. defies (b)9. intimated (d) 10. dimensions (a) 11. defy (a) 12. romantic (b) 13. dimensions (b) 14. maintain (d) 15. intimate (c) Task 3 1) prerequisite 2) date 3) Respect 4) important 5) whomever 6) candidates 7) highly 8) essential 9) suitable 10) sufficient Unit Five Task 1 1. B 2. D 3. C 4. B 5. C 6. A 7. B 8. D 9. C 10. A 11.C 12. D 13. B Task 2 1. A. masterpieces B. mastered C. mastery 2. A. committed B. commission C. commitment all not be removed; Pier, wall or column when its strength not less than 3.5MPa part of a template,bearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-e following provisions: no loadith thaffin wax. (4) the template removal template removal time, in addition to construction drawings provided, shall also comply wot affect the quality of concrete or reinforced concrete. Timber formwork used in baking or other protective materials of parcontaminated concrete shall not be used, and should n-rust protection of mineral oil, oil-hould be cleaned before each use and antitemplates installed, the measurement method, set the necessary ... (3) cleaning and coating of the template in the template sof the installation of xceeds the allowable interval byation to ensure quality. (2) pour pouring concrete breaks continuity, pouring allows the interval determined by experiment, eg vibring of concrete, is strictly prohibited in the cabin with water, such as poor workability, take measures such as strengtheninhousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) pourware-nouring program for construction, in cant pouring Shi from minimum at began, until keep horizontal. 2) substandard concrete nocrete layered points block (1) layered pouring job 1) by supervision engineers approved of pouring layered points block and p.5 conam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 100 hanging arm component ? 2 75 hanging arm component >2 100 7.3plate structure span (m) of concrete strength standard values of percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beng temside; die after pre demolition should be established structures or components. Standard structure types of Dismounting bearimplate removal, in addition to conforming to the requirements of drawings, templates should be removed before tensioning the or tepractical load, shall be subject to approval of the supervisor, early form removal. Prestressed concrete structure component ious paragraph. Calculation and test review, the actual strength of concrete structure is able to withstand gravity and otherprev ncrete structure bearing the template shall conform to the construction drawings, and shall comply with the provisions of thecan be removed. Special template removal time, report to the supervisor for approval. Demolition of reinforced concrete or co3 3. A. executing B. execution C. executive 4. A. presentation B. represented C. presented D. present 5. A. inventors B. investors C. innovator 6. A. breath B. breathing C. breathtaking D. breathless 7. A. physical B. physiological C. psychological 8. A. discipline B. routine C. discipline 9. A. practice B. performed C. perfect D. proper 10. A. reaction B. reconciliation C. resistance D. response Task 3 1) written 2) practiced 3) adapted 4) fundamental 5) soul 6) described 7) mental 8) state of being 9) pictured 10) exercises 11) control 12) experiences 13) including 14) individuals 15) medical imum arvision engineers approved of pouring layered points block and pouring program for construction, in cant pouring Shi from minging arm component ? 2 75 hanging arm component >2 100 7.3.5 concrete layered points block (1) layered pouring job 1) by supe0 hanof percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 10 components. Standard structure types of Dismounting bearing template structure span (m) of concrete strength standard valuess or of drawings, templates should be removed before tensioning the side; die after pre demolition should be established structure rly form removal. Prestressed concrete structure component or template removal, in addition to conforming to the requirementsor, eagth of concrete structure is able to withstand gravity and other practical load, shall be subject to approval of the supervisction drawings, and shall comply with the provisions of the previous paragraph. Calculation and test review, the actual strennstrusupervisor for approval. Demolition of reinforced concrete or concrete structure bearing the template shall conform to the co olumn when its strength not less than 3.5MPa part of a template, can be removed. Special template removal time, report to theall not be removed; Pier, wall or cbearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-ion to construction drawings provided, shall also comply with the following provisions: no loadk used in baking or other protective materials of paraffin wax. (4) the template removal template removal time, in additcontaminated concrete shall not be used, and should not affect the quality of concrete or reinforced concrete. Timber formwor-l oil, oilrust protection of minera-plate in the template should be cleaned before each use and antiof the installation of templates installed, the measurement method, set the necessary ... (3) cleaning and coating of the temtinuity, pouring allows the interval determined by experiment, exceeds the allowable interval bych as poor workability, take measures such as strengthening vibration to ensure quality. (2) pour pouring concrete breaks conpouring of concrete, is strictly prohibited in the cabin with water, suwarehousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) -t began, until keep horizontal. 2) substandard concrete non4 Unit Six Task 1 1.B 2. D 3.A 4. C 5. B 6. A 7. C 8. D 9. B 10. C Task 2 1. contented 2. convention 3. tall 4. curiously 5. Convention 6. content 7. execute 8. curious 9. execute 10. count 11. content 12. conventions 13. count 14. convention 15. tall Task 3 1) sheer 2) subject 3) contradictory 4) worldly 5) chaotic 6) sophisticated 7) violence 8) glamorous 9) crime 10) safest Unit Seven Task 1 1.A 2. C 3. B 4. B 5. C 6. A 7. B 8. C 9. A 10. C Task 2 Step 1 all not be removed; Pier, wall or column when its strength not less than 3.5MPa part of a template,bearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-e following provisions: no loadith thaffin wax. (4) the template removal template removal time, in addition to construction drawings provided, shall also comply wot affect the quality of concrete or reinforced concrete. Timber formwork used in baking or other protective materials of parcontaminated concrete shall not be used, and should n-rust protection of mineral oil, oil-hould be cleaned before each use and antitemplates installed, the measurement method, set the necessary ... (3) cleaning and coating of the template in the template sof the installation of xceeds the allowable interval byation to ensure quality. (2) pour pouring concrete breaks continuity, pouring allows the interval determined by experiment, eg vibring of concrete, is strictly prohibited in the cabin with water, such as poor workability, take measures such as strengtheninhousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) pourware-nouring program for construction, in cant pouring Shi from minimum at began, until keep horizontal. 2) substandard concrete nocrete layered points block (1) layered pouring job 1) by supervision engineers approved of pouring layered points block and p.5 conam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 100 hanging arm component ? 2 75 hanging arm component >2 100 7.3plate structure span (m) of concrete strength standard values of percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beng temside; die after pre demolition should be established structures or components. Standard structure types of Dismounting bearimplate removal, in addition to conforming to the requirements of drawings, templates should be removed before tensioning the or tepractical load, shall be subject to approval of the supervisor, early form removal. Prestressed concrete structure component ious paragraph. Calculation and test review, the actual strength of concrete structure is able to withstand gravity and otherprev ncrete structure bearing the template shall conform to the construction drawings, and shall comply with the provisions of thecan be removed. Special template removal time, report to the supervisor for approval. Demolition of reinforced concrete or co5 partially unfold unselfishness/selfishness imperfect employee proverbial refinement indestructible criminal mistake alteration liar considerable traitor philanthropist Step 2 1. indestructible 2. mistook 3. unselfishness 4. imperfect 5. alteration 6. traitor 7. considerable 8. liar 9. employees 10. unfolds 11. refinement 12. philanthropist 13. criminal 14. partially 15. proverbial Task 3 1. So far as I'm concerned 2. should endeavor to measure whether predetermined goals are being achieved 3. has been engrossed in conversation with all night 4. draw conclusions from the results of a single survey 5. He had no friends nor acquaintances 6. did she tell him about the attack 7. as we had seen imum arvision engineers approved of pouring layered points block and pouring program for construction, in cant pouring Shi from minging arm component ? 2 75 hanging arm component >2 100 7.3.5 concrete layered points block (1) layered pouring job 1) by supe0 hanof percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 10 components. Standard structure types of Dismounting bearing template structure span (m) of concrete strength standard valuess or of drawings, templates should be removed before tensioning the side; die after pre demolition should be established structure rly form removal. Prestressed concrete structure component or template removal, in addition to conforming to the requirementsor, eagth of concrete structure is able to withstand gravity and other practical load, shall be subject to approval of the supervisction drawings, and shall comply with the provisions of the previous paragraph. Calculation and test review, the actual strennstrusupervisor for approval. Demolition of reinforced concrete or concrete structure bearing the template shall conform to the co olumn when its strength not less than 3.5MPa part of a template, can be removed. Special template removal time, report to theall not be removed; Pier, wall or cbearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-ion to construction drawings provided, shall also comply with the following provisions: no loadk used in baking or other protective materials of paraffin wax. (4) the template removal template removal time, in additcontaminated concrete shall not be used, and should not affect the quality of concrete or reinforced concrete. Timber formwor-l oil, oilrust protection of minera-plate in the template should be cleaned before each use and antiof the installation of templates installed, the measurement method, set the necessary ... (3) cleaning and coating of the temtinuity, pouring allows the interval determined by experiment, exceeds the allowable interval bych as poor workability, take measures such as strengthening vibration to ensure quality. (2) pour pouring concrete breaks conpouring of concrete, is strictly prohibited in the cabin with water, suwarehousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) -t began, until keep horizontal. 2) substandard concrete non6 8. that he had had a family himself 9. the problems you mention are inherent in the system 10. young people conscientious in their work/young people who are conscientious in their work 11. deviated from her custom 12. at the peril of your own life/at your own peril 13. taken on a new dimension 14. capable of looking after myself 15. in much the same way as it was 200 years ago 16. rescue the sailors from the sinking ship 17. Portugal participated in the war 18. due to our ignorance Unit Eight Task 1 Step 1 1. boot---e, m 2. bound--c, j 3. fatal--b, q 4. negotiate--g, n 5. net---a, f, 1 6. the odds--h, i 7. reward--k, o 8. vacuum---d, p Step 2 all not be removed; Pier, wall or column when its strength not less than 3.5MPa part of a template,bearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-e following provisions: no loadith thaffin wax. (4) the template removal template removal time, in addition to construction drawings provided, shall also comply wot affect the quality of concrete or reinforced concrete. Timber formwork used in baking or other protective materials of parcontaminated concrete shall not be used, and should n-rust protection of mineral oil, oil-hould be cleaned before each use and antitemplates installed, the measurement method, set the necessary ... (3) cleaning and coating of the template in the template sof the installation of xceeds the allowable interval byation to ensure quality. (2) pour pouring concrete breaks continuity, pouring allows the interval determined by experiment, eg vibring of concrete, is strictly prohibited in the cabin with water, such as poor workability, take measures such as strengtheninhousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) pourware-nouring program for construction, in cant pouring Shi from minimum at began, until keep horizontal. 2) substandard concrete nocrete layered points block (1) layered pouring job 1) by supervision engineers approved of pouring layered points block and p.5 conam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 100 hanging arm component ? 2 75 hanging arm component >2 100 7.3plate structure span (m) of concrete strength standard values of percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beng temside; die after pre demolition should be established structures or components. Standard structure types of Dismounting bearimplate removal, in addition to conforming to the requirements of drawings, templates should be removed before tensioning the or tepractical load, shall be subject to approval of the supervisor, early form removal. Prestressed concrete structure component ious paragraph. Calculation and test review, the actual strength of concrete structure is able to withstand gravity and otherprev ncrete structure bearing the template shall conform to the construction drawings, and shall comply with the provisions of thecan be removed. Special template removal time, report to the supervisor for approval. Demolition of reinforced concrete or co7 1. boot (m) 2. vacum (p) 3. rewarded (o) 4. reward (k) 5. net (f) 6. negotiating (n) 7. odds (h) 8. odds (i) 9. Fatal (b) 10. negotiations (g) Task 2 1. A. black and white B. in black and white C. black-and-white 2. A. on the scene B. sets the scene C. behind the scenes 3. A. make no difference B. make a difference C. make any difference D. make all the difference 4. A. work on B. works against C. work out 5. A. spread to B. spreading out C. spread through Task 3 1.A 2.B 3.B 4.D 5.A 6.B 7.C 8.B 9.D 10.C Unit Nine Task 1 1.A 2. D 3. B 4. B 5. C 6. A 7. B 8. A imum arvision engineers approved of pouring layered points block and pouring program for construction, in cant pouring Shi from minging arm component ? 2 75 hanging arm component >2 100 7.3.5 concrete layered points block (1) layered pouring job 1) by supe0 hanof percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 10 components. Standard structure types of Dismounting bearing template structure span (m) of concrete strength standard valuess or of drawings, templates should be removed before tensioning the side; die after pre demolition should be established structure rly form removal. Prestressed concrete structure component or template removal, in addition to conforming to the requirementsor, eagth of concrete structure is able to withstand gravity and other practical load, shall be subject to approval of the supervisction drawings, and shall comply with the provisions of the previous paragraph. Calculation and test review, the actual strennstrusupervisor for approval. Demolition of reinforced concrete or concrete structure bearing the template shall conform to the co olumn when its strength not less than 3.5MPa part of a template, can be removed. Special template removal time, report to theall not be removed; Pier, wall or cbearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-ion to construction drawings provided, shall also comply with the following provisions: no loadk used in baking or other protective materials of paraffin wax. (4) the template removal template removal time, in additcontaminated concrete shall not be used, and should not affect the quality of concrete or reinforced concrete. Timber formwor-l oil, oilrust protection of minera-plate in the template should be cleaned before each use and antiof the installation of templates installed, the measurement method, set the necessary ... (3) cleaning and coating of the temtinuity, pouring allows the interval determined by experiment, exceeds the allowable interval bych as poor workability, take measures such as strengthening vibration to ensure quality. (2) pour pouring concrete breaks conpouring of concrete, is strictly prohibited in the cabin with water, suwarehousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) -t began, until keep horizontal. 2) substandard concrete non8 9. C 10. A Task 2 1. crammed (b) 2. balloon (a) 3. crash (a) 4. crammed (a) 5. crashed (a) 6. crammed (d) 7. ballooned (c) 8. crash (b) 9. balloon (b) 10. slumped (b) 11. trust (c) 12. trust (d) 13. liberal (c) 14. slump (c) 15. liberals (b) 16. trust (b) Task 3 1)A 2) D 3) B 4) B 5) C 6) C 7) A 8) A 9) D 10) D Unit Ten Task 1 I.A 2. C 3. D 4. B 5. B 6. B 7. C 8. D 9. A 10. B Task 2 1. underlying 2. immune 3. impart 4. imperative 5. vulnerable 6. diffused 7. foremost 8. scholarly 9. illuminated 10. eloquence all not be removed; Pier, wall or column when its strength not less than 3.5MPa part of a template,bearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-e following provisions: no loadith thaffin wax. (4) the template removal template removal time, in addition to construction drawings provided, shall also comply wot affect the quality of concrete or reinforced concrete. Timber formwork used in baking or other protective materials of parcontaminated concrete shall not be used, and should n-rust protection of mineral oil, oil-hould be cleaned before each use and antitemplates installed, the measurement method, set the necessary ... (3) cleaning and coating of the template in the template sof the installation of xceeds the allowable interval byation to ensure quality. (2) pour pouring concrete breaks continuity, pouring allows the interval determined by experiment, eg vibring of concrete, is strictly prohibited in the cabin with water, such as poor workability, take measures such as strengtheninhousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) pourware-nouring program for construction, in cant pouring Shi from minimum at began, until keep horizontal. 2) substandard concrete nocrete layered points block (1) layered pouring job 1) by supervision engineers approved of pouring layered points block and p.5 conam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 100 hanging arm component ? 2 75 hanging arm component >2 100 7.3plate structure span (m) of concrete strength standard values of percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beng temside; die after pre demolition should be established structures or components. Standard structure types of Dismounting bearimplate removal, in addition to conforming to the requirements of drawings, templates should be removed before tensioning the or tepractical load, shall be subject to approval of the supervisor, early form removal. Prestressed concrete structure component ious paragraph. Calculation and test review, the actual strength of concrete structure is able to withstand gravity and otherprev ncrete structure bearing the template shall conform to the construction drawings, and shall comply with the provisions of thecan be removed. Special template removal time, report to the supervisor for approval. Demolition of reinforced concrete or co9 Task 3 1) deeper 2) contribute 3) explore 4) potential 5) how 6) productive 7) likely 8) produce 9) Nationally 10) dedicated of drawings, templates should be removed before tensioning the side; die after pre demolition should be established structure rly form removal. Prestressed concrete structure component or template removal, in addition to conforming to the requirementsor, eagth of concrete structure is able to withstand gravity and other practical load, shall be subject to approval of the supervisction drawings, and shall comply with the provisions of the previous paragraph. Calculation and test review, the actual strennstrusupervisor for approval. Demolition of reinforced concrete or concrete structure bearing the template shall conform to the co olumn when its strength not less than 3.5MPa part of a template, can be removed. Special template removal time, report to theall not be removed; Pier, wall or cbearing side template of an dismantling, should the concrete reaches its surface and edges do not damage due to stripping, sh-ion to construction drawings provided, shall also comply with the following provisions: no loadk used in baking or other protective materials of paraffin wax. (4) the template removal template removal time, in additcontaminated concrete shall not be used, and should not affect the quality of concrete or reinforced concrete. Timber formwor-l oil, oilrust protection of minera-plate in the template should be cleaned before each use and antiof the installation of templates installed, the measurement method, set the necessary ... (3) cleaning and coating of the temtinuity, pouring allows the interval determined by experiment, exceeds the allowable interval bych as poor workability, take measures such as strengthening vibration to ensure quality. (2) pour pouring concrete breaks conpouring of concrete, is strictly prohibited in the cabin with water, suwarehousing, warehousing of substandard concrete to be removed and disposed of at designated locations by the regulation. 3) -t began, until keep horizontal. 2) substandard concrete nonimum arvision engineers approved of pouring layered points block and pouring program for construction, in cant pouring Shi from minging arm component ? 2 75 hanging arm component >2 100 7.3.5 concrete layered points block (1) layered pouring job 1) by supe0 hanof percentage (%) Board ? 2 50 Board >2, ? 8 75 Board >8 100 beam, and Arch, and shell ? 8 75 beam, and Arch, and shell >8 10 components. Standard structure types of Dismounting bearing template structure span (m) of concrete strength standard valuess or 10
本文档为【熊海虹主编《高等学校研究生英语综合教程 上》课后练习答案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_153723
暂无简介~
格式:doc
大小:74KB
软件:Word
页数:22
分类:生活休闲
上传时间:2017-10-07
浏览量:6516