首页 四年级数学七巧板拼图

四年级数学七巧板拼图

举报
开通vip

四年级数学七巧板拼图四年级数学七巧板拼图 七巧板是我们很小就玩的一种益智玩具,七巧板的拼图方案数不胜数,但它 却是人教版小学数学四年级的学习内容,呵呵,有点落伍了哦。不过,我写这个 相信对很多小朋友都有帮助,百度也有人问一些关于七巧板的拼图问题,特照了 几张常见的几何图形上来。 长方形,也是比较简单的图形 within explosion and fire hazard atmospheres before the installation is put into operation, building installatio...

四年级数学七巧板拼图
四年级数学 小学四年级数学口算题四年级数学下册知识点四年级数学单位换算四年级数学上册期末卷小学四年级数学奥赛题 七巧板拼图 七巧板是我们很小就玩的一种益智玩具,七巧板的拼图方案数不胜数,但它 却是人教版小学数学四年级的学习内容,呵呵,有点落伍了哦。不过,我写这个 相信对很多小朋友都有帮助,百度也有人问一些关于七巧板的拼图问题,特照了 几张常见的几何图形上来。 长方形,也是比较简单的图形 within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive 非直角平行四边形 等腰梯形 within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive 正方形,在七巧板中,拼正方形可以说是 最简单的。 七巧板的菱形只能是正方形 within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive 五边形 六边形 within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive 三角形,它是比较难的一个几何图形,看到图很简单,但拼起 来却需要一定的想象力~ within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive
本文档为【四年级数学七巧板拼图】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_281650
暂无简介~
格式:doc
大小:107KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-11-27
浏览量:44