四年级数学
小学四年级数学口算题四年级数学下册知识点四年级数学单位换算四年级数学上册期末卷小学四年级数学奥赛题
七巧板拼图
七巧板是我们很小就玩的一种益智玩具,七巧板的拼图方案数不胜数,但它
却是人教版小学数学四年级的学习内容,呵呵,有点落伍了哦。不过,我写这个
相信对很多小朋友都有帮助,百度也有人问一些关于七巧板的拼图问题,特照了
几张常见的几何图形上来。
长方形,也是比较简单的图形
within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive
非直角平行四边形
等腰梯形
within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive
正方形,在七巧板中,拼正方形可以说是
最简单的。
七巧板的菱形只能是正方形
within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive
五边形
六边形
within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive
三角形,它是比较难的一个几何图形,看到图很简单,但拼起
来却需要一定的想象力~
within explosion and fire hazard atmospheres before the installation is put into operation, building installation work shall meet the following requirements: repair and decoration works should end second grouting and finishing work should end, satisfactory operation of explosion-proof ventilation system should comply with the design requirements and. 4.1.11.3 explosion-proof electrical equipment into the line port and wiring and cables, wires should be capable of reliably sealing, extra inlet elastic gasket, metal gasket should be complete and should tighten the clamping larva inlet seals. Metal gasket thickness shall not be less than 2mm. 4.1.11.4 the installation of explosion-proof lamps lamp type, model and power, the design and specification of requirements, may not be altered. Spiral bulbs should be tightened up and good contact, not loose, lamp housings should be complete, bolts should be tightened. 4.1.11.5 explosion dangerous environment of cable cannot directly connection, in non-normal situation Xia, must in corresponding of explosion-proof wiring box or points line box within connection or tap, cable line through different dangerous regional or territories wall Shi, must take filling sand, and fill resistance fire blocking material or added set fire wall, protection tube ends of tube mouth at, should will cable around with non-burning sex fiber jam closely, again filling sealed clay, sealed clay filling depth shall not is less than pipe diameter, and shall not is less than 40mm. Introduction of explosion-proof motor cable lines looking for connections, can be used to find connections, between it and the explosion-proof electric junction box, explosion-proof requirements should be to cope with different environmental conditions of different materials should be used to find the connection. 4.1.11.6 explosive