首页 北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method)

北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method)

举报
开通vip

北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method)北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method) 北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method) Beijing roof coil waterproof recommendation method -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -...

北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method)
北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method) 北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method) Beijing roof coil waterproof recommendation method -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Release unit: Beijing urban and rural construction committee | release date: 0000-00-00 Basic requirements for waterproofing recommendation of roof coil 1. Scope of application (1) this recommendation is applicable to new, expanded or renovated roofing waterproofing works. Construction of 1-4 class durable years specified in ministerial standards (see table 1). (2) in recent years, the development new waterproof materials, waterproof construction processes were changed, roofing felt waterproofing construction in addition to using common linoleum thermal bonding process, various new coil used in roof of cold sticking method, melt method, since the glue method technology has been used for many years, It has some advanced nature, scientific and practical. Will now can use a new type of asphalt waterproof coiled material roofing waterproof engineering, polymer modified asphalt waterproofing materials, synthetic polymer waterproof coiled material roofing waterproof coiled material is much more mature and reliable, recommended for design and construction personnel, for your selection. Ii. Basic requirements of design (a) roof engineering according to the nature of the building, importance, function requirements, building structure and waterproof durability, etc., the waterproofing roof is divided into four grades, and according to the different levels of security (see chart 2). (2) the new waterproof rolling materials adopted in the design of the recommended practice shall be strictly constructed according to the technical requirements of the rolling materials. (3) the roofing and the roofing. The person roofing according to the design person chooses cement sand mortar, floor tile and so on protective layer. Do not have a person's roofing should make protective layer, such as brushs reflective paint, cover coarse sand, green bean stone and so on. (4) the drainage slope of the flat roof is 2%, the drainage slope of the outer cornice is greater than 1%, the drainage slope of the water outlet is 3 ~ 5%, and the slope of the roof of the person's roof should be 2%. (5) there are four methods for rolling stock. 1. Hot melt method: refers to the hot melt adhesive which is used to melt the bottom of the waterproof rolling material by using the heater. The method to realize the bonding between the coil and the base is called the hot melt method. 2. Cold bonding method: refers to the method of using cementing material to directly realize the bonding of the waterproof rolling material with the base. 3. Self-adhesive method: refers to the use of waterproof rolling materials with self-adhesive adhesive, which do not require thermal processing, and do not need to be coated with other materials, and the method of directly implementing the water-proof rolling materials and the base bond is called self-adhesive method. 4. Hot asphalt method: refers to the method of using hot bituminous cementing material to realize the waterproofing rolling materials directly with the base bond. (6) roof rolls are constructed according to the construction process, which can be used in the construction of a full paste, stick, stick, and empty shop. When placing the tiling, the air under the coil should be discharged at the same time, the coil shall be smooth and solid, and the joints must be full of adhesion and tight joints. 1. Full adhesion: the construction method for the adhesive construction of the whole area of the rolling material and the base area when the waterproof rolling material is covered. 2. Adhesive: when the waterproof rolling materials are covered, the rolling materials and the grass roots only make the construction method with adhesive. That is to make a band of 200 ~ 250mm in the width of the coil. The slime is also known as a strip method, with a bond area of no less than 25%. 3. Sticky-stick: the construction method of only point bonding with the base at the base of the waterproof rolling material is also called the flower shop method. The total area of bond is 6%, Each square metre is bonded to 5 points, each area is 100 x 100mm. 4. Empty shop: when it is covered with waterproof rolling materials, the coil shall be bonded to the base only in a certain width, and the rest shall not be bonded. (7) roofing waterproofing shall be constructed according to the design materials and construction requirements. General roof coil shall be determined according to the slope and roof of the roof. When the roof slope is less than 3 %, the roll shall be covered by parallel roof. When the roof slope is 3 % ~ 15 %, the roller can be parallel or vertical roof. The roof slope is greater than 15% or the roof of the roof is affected by the vibration of the vertical roof, the upper and lower rolling materials may not be perpendicular to each other. When the slope is more than 25%, it is not suitable to make the coil waterproof. (8) the width of the coil width shall be in accordance with table 3 requirements. (9) it must be treated with additional layer of water, such as yin-yang Angle, tube root and water outlet. (10) roofing waterproof rolling material, rolling stock and butt and head; Flat roof self-drainage, coreaves drainage, women's wall drainage, roof water discharge and roof and wall connection, roof vent tube (canal root) and other details. Basic requirements for construction (I) preparation for the project 1. Review the drawings before construction, understand the construction of the waterproof details in the construction drawings of the roofing, and have the technical requirements of the roofing level. The construction plan of roofing waterproof project or technical measures are prepared. 2. The waterproof materials used shall be certified by technical appraisement and materials factory certificate, and the certificate of application of waterproofing materials issued by the municipal commission of construction. The material must meet the design requirements. When the waterproof material enters the site, it shall conduct spot check and test on the spot according to the regulations. The test result will be used on time when the test result reaches the technical indicator. The roofing waterproof project must be constructed by the waterproof professional team. The construction personnel should wear work clothes, soft sole shoes and gloves, wear protective protective equipment when necessary, and take safety precautions. (2) operating conditions 1. The base 15 ~ 20mm thick 1:2. 5 cement mortar leveling layer should be smooth, solid and firm, no sand, no concave and convex, loose, bulge, crack, flax and so on. The flatness of the plane is checked by 2m long straighter, and the gap between the leveling layer and the ruler is not more than 5mm. 2. Leveling layer surface must be dry, cement mortar should have sufficient strength, its moisture content ? 9%. Exhaust roof can be used when leveling layer is difficult to dry. 3. The pipe fittings, equipment or embedded parts connected with the leveling layer shall be installed prior to the construction of the insulation layer to avoid the hole after the waterproof layer is completed. 4. Leveling layer with prominent roofing structures (parapet wall, retaining wall, skylights, deformation cracks, chimney, etc.) of the joint and the corner (impinges mouth, eaves, roof gutter, eaves gutter, roof, etc.) arc of junction shall be prepared. The radius of the circular arc should be selected according to the type of the coil, and it should be made into a slightly lower pit around the water outlet of the internal drainage. 5. The slope of the leveling layer shall be that the water shall meet the requirements of the design and shall not be partially flooded. (3) precautions 1. The construction materials and auxiliary materials are mostly inflammable, and the storage and construction site of the materials shall be equipped with fire fighting equipment. The use of dimethylbenzene and other solvents should have corresponding anti-drug measures. The construction site must conform to the relevant national safety and fire regulations. 2. The operator must wear safety helmet and safety belt when working in dangerous parts such as eaves or vertical operation. No construction shall be allowed in the five levels of wind (including level five). 4. Polymer modified asphalt waterproofing materials melt method construction are not less than 10 ? C; Synthetic polymer waterproof coiled material site construction not less than 5 ? C; Asphalt waterproof coiled material generally is not in the winter construction, such as really need when construction, the temperature is not lower than + 5 ? C. Roof waterproof rolling materials shall not be constructed on rainy days and snowy days. (4) strengthening management 1. The waterproof construction shall be coordinated with the related working procedure, and the construction personnel shall not be destroyed by the common waterproof layer. The waterproof layer shall be protected from the roof of the roof without wearing the nails. 2. The labor organization adjusts according to the change of construction work face, generally 5 to 8 people in each group. 3. It is necessary to take protective measures when the waterproof layer is strictly prohibited. 4. The waterproof layer shall be filled with water or water test, and the roof covering protection layer shall be confirmed when there is no leakage. Iv. Roof waterproof acceptance and warranty period (1) the waterproof quality of the coil roof shall meet the following requirements for acceptance: 1. No leakage or water leakage can be found in the waterproof roof. 2. All materials must meet the quality standards and design requirements. 3. The waterproof layer shall be in accordance with the regulations, the width should be accurate, and the joints must be tightly sealed. The coil surface is flat and the end is firm. 4. The node approach must comply with the design requirements. 5. Every procedure should be checked by a special person, and the next procedure can be carried out after passing the qualification. 6. The roofing waterproof project should be completed, and all technical data should be sorted out in a timely manner. (2) warranty period The warranty period of all kinds of rolling roofing waterproof works is at least three years. The construction unit and the use unit sign the agreement, during the warranty period, any leakage occurs, the construction unit is responsible for repairing the repair, and the cost is borne by the responsible party. Waterproof construction technology of roof coil 1. The construction process of waterproof rolling material of ethylene propylene - butyl rubber Epdm waterproofing is a synthetic polymer waterproofing materials, based on ethylene, propylene and double loop pentadiene three monomer copolymer synthesis of epdm as the main body, with the right amount of butyl rubber, curing agent, accelerator, softener, filling agent and reinforcing agent processing made of the high elastic waterproof material. It has the characteristics of aging, long service life, high tensile strength, large elongation, good adaptability to the cracking deformation of the grass base, and the construction of light weight and single layer of cold work. (1) construction preparation 1. The material (1) ternary ethylene - butyl rubber waterproof rolling material specifications Thickness 1.2mm, 1.5mm Width is 1.0 mm The length of 20 mm Technical performance shall comply with schedule 1 requirements. (2) auxiliary materials such as primary treatment agent, base binder, adhesive for rolling, enhancing sealant and colorant should meet the requirements of schedule 2. 2. Machine tools: prepare according to schedule 3 (2) construction technology 1. Process flow Clean up the grass - level treatment of the grass - layer treatment - - - - - - - - - - - - - - - - - - - - - surface - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Adhesive bonding, compaction, end of rolling materials and sealing side treatment. 2. Operation points (1) clean up the grass roots: clean up the qualified grass roots before construction. (2) coating primary treatment agent: coating polyurethane adhesive. (A) the preparation of polyurethane glue The polyurethane material is matched with the ratio of 1:2 = 1:3 (weight ratio), and the mixing can be applied to the construction of coating. It is also possible to use polyurethane material in the proportion of a: b: xylene = 1:1. 5. (B) coating polyurethane glue Before the large area painting brush construction, use paint brush dip glue to apply in the complex position such as Yin Angle, canal root, water and so on. Use a long roll brush to brush in large areas. When coating the base glue, it is not obvious to the bottom, the thickness is uniform. After the glue is completely dry, the construction of the next process is carried out. (3) additional layer construction: Yin and Yang Angle, tube root, impinges must make additional layer in areas such as the mouth, can use self-adhesive sealant or polyurethane coating, also can use epdm coiled material spread a layer with stickers. (4) coil and leveling layer brush cx-404 glue: mix the cx-404 glue in the bucket. (A) coiled rubber. Spread the coil on the clean base, and use the long roller to dip the cx-404. No glue should be allowed in the lap. (B) leveling coat of glue. On the flat layer of the glue drying, the cx-404 adhesive is evenly coated with the long roller. Brush surface should not be too big, then hang glue. (5) tape and paste The glue on the coil and leveling layer is basically dry (feel not sticky, usually about 20min). Roofing construction: (A) coil should be parallel to the roof from the eaves spread stick, to pay attention to the two-way flow of gradient coil to lap downstream water direction, long edge and the end of the lap joint width empty shop, the article point glue, the glue are 100 mm, with sticky method are 80 mm and end summer-planting to stagger the 250 mm. (B) according to the location of the coil configuration, starting from the downhill slope of the water slope, the standard line will be popped up, and the length of the coil will be perpendicular to the direction of the flowing water slope. (C) the rolling material that has been coated with the brush will be rolled into a coil, which will be inserted into a coil by the center hole. 30 x 1500 mm 1. The roof should be flat, without water, water test should be qualified. 2. Between the coil and the coil, the joints between the base and the coil shall be firmly bonded, and no wrinkles, holes, delamination or sliding phenomena shall be allowed. 3. The width of the connection between the coil and the coil shall be pasted in table 3. The edges should be close, and the end of the coil shall be bonded firmly. 4. The paint shall have a strong adhesion between the coating and the coil, which shall be uniform and uniform. The color shall be consistent and shall not have any leakage or peeling phenomenon. 5. The completed inspection and acceptance of waterproof works shall provide a complete set of materials, certificate of certification, certification and examination report, construction plan and other documents. (4) product protection 1. The construction personnel should carefully protect the waterproof layer, the construction equipment, etc., to puncture the waterproof layer, the construction personnel shall not allow the shoes to wear the nails to walk on the rolling waterproof layer. 2. It is necessary to strictly avoid the pollution of materials such as grass root treatment agent, various adhesive and colorant, etc., such as wall, cornice and so on. 3. No blockage is allowed at the drop of water. (5) precautions 1. The construction materials and auxiliary materials are more flammable, No fireworks are allowed in the storage of materials and the construction site. 2. Use the organic solvent such as xylene or gasoline in time to clean and clean the solvent after cleaning. After cleaning, the solvent should be saved or disposed of. 3. When the base is not dry after rain or rain, the construction of rolling materials shall not be carried out, and the coil shall not be bonded or produced. Cracking. Snow day, five level wind above forbid construction. The operator must wear a seat belt during construction work on the high slope and the cornice and other dangerous parts. 2. Chlorinated polyethylene - rubber combined waterproof rolling material construction technology Chlorinated polyethylene rubber blend waterproofing materials, synthetic polymer waterproofing materials, based on chlorinated polyethylene resin and synthetic rubber as the main body, adding suitable amount of curing agent, promoting agents, stabilizers, fillers and softeners, made of high elastic waterproof coiled material processed. This kind of waterproofing materials with the characteristics of plastic and rubber, not only has high strength and excellent aging resistance, but also has the high elasticity of rubber materials, high extensibility and good low temperature resistance. (1) construction preparation 1. The material (1) chlorinated polyethylene - rubber combined waterproof rolling material. Specification thickness: 1.2mm; The 1.5 mm Width: 1.0mm; The 1.2 mm Length: 20 m The technical performance should meet the requirements of schedule 4, and the reference amount of supporting materials is shown in schedule 5. (2) base treatment agent, base binder, bonding adhesive, enhancing sealant, coloring agent and self-curing adhesive tape should meet schedule 2 requirements. (2) construction technology 1. Process flow. The construction process of the waterproof rolling material with the third element. 2. Operating process points (1) cleaning the base, painting the base treatment agent and the construction requirements of the waterproof rolling materials of the triple b. (2) additional layer construction The parts of Yin and Yang Angle, tube root, and water outlet must first be attached, which can be coated with self-adhesive sealing tape or polyurethane coating. (3) brush the base adhesive For roofing waterproofing works full of adhesion and stickiness, the base adhesives should be brushed separately on the leveling and rolling surfaces. Full stick method: set aside 80mm, the rest of the area is painted, and the surface of the flat surface is full. Stickiness: on the surface of the leveling layer, press the base adhesive of the line coating, the surface of the coil is pressed by the corresponding position, and the adhesive is coated. Empty shop method: the base adhesives are filled with the base adhesives of 800mm from the outside of the roof. The rest parts are not coated with the base adhesives. (4) coiled and pasted After the surface of the coil and the layer of the leveling layer of the adhesive drying, it can spread the material (the surface of the uncoated steel can be directly spread out). Press the baseline, spread a roll, and immediately use a clean roller to roll over the horizontal order to remove the air. (5) the coil shall be configured in a long direction, starting from the downhill slope of the water slope, and the seam of the joints parallel to the roof shall be connected in the direction of the water flow; The connecting direction perpendicular to the roof of the roof should be connected to the direction of the wind. Width of coil seam: total adhesive: 80mm. Empty shop method and stick method: 100mm. Bonding method: turn lap seam position, with coil seam adhesive stick open coil tails point for a fixed, in open two coil surface evenly coated adhesive, after being basic dry, You can remove the adhesive of the temporary fixed point and then use the hand-held roller to roll the adhesive. (6) processing of the end of the coil: Lap weld edge and the end of the first treatment, application of polyurethane sealing paste or one-component chlorosulfonated polyethylene sealing paste closed tight, and can be used mixed with cement dosage 20% 107 rubber cement mortar seam pressure processing. (7) protection layer construction (A) the surface of the roll is brushed on the surface to protect the paint evenly. (B) the roof of a person's roof is designed according to the design requirements. (3) project acceptance, product protection, precautions, and the requirements of the waterproof rolling materials of the three yuan. 3. Lyx-603 chlorinated polyethylene waterproof rolling material construction technology Chlorinated polyethylene waterproofing LYX - 603 is a synthetic polymer waterproofing materials, based on chlorinated polyethylene as base material, glass grid cloth as the skeleton, after rolling and composite processing made of polymer composite waterproof materials. (1) construction preparation 1. The material (1) lyx-603 chlorinated polyethylene waterproof rolling material Specifications: The thickness of 1.2 mm Width of 900 mm Weight 1.8 kg/m2 Area of 20 m2 / volume Technical performance shall comply with schedule 6 requirements. The adhesives and dosage of supporting materials refer to schedule 2 and schedule 7. 2. Machine tools: prepare according to schedule 3 (2) construction technology 1. Technological process: the construction process of the waterproof rolling material with the same three yuan. 2. Operating process points: (1) cleaning the grass roots: clean and brush the primary treatment agents before construction. (2) additional layer construction: additional layer method of waterproof rolling material with the third element. (3) coil coating adhesive: spread the coil on the clean and flat base, and use the cotton yarn to dip the oil in the water to wipe off the insulation powder on both sides of the coil. Use the brown brush to dip the lyx-603-3 binder and evenly apply the brush on the surface of the 150mm wide surface of the coil and the base bond. The coil and the joint area of the coil and the joint of the coil are not brushed. (4) adhesive of the base coating: the brush with the palm brush is filled with adhesive, and the brush can be spread quickly and evenly on the base corresponding to the width of the coil, and the width should be consistent. Use the hand to feel the basic drying before the construction of the spreading of the material. (5) the shop is stuck coil: in rolled into a cylinder is coating binder coil center insert a iron tube, two people carrying iron pipe ends respectively, and the paste at the end of the coil fixed at a predetermined position, and then along the line spreading coil. When spreading, do not pull too tightly to the roll, should be in a relaxed state. The side of the standard line spreads the material. The plane and the surface of the connection of the coil, should start from the bottom to the upper bunk, and make the rolling material close to the Yin Angle, must not appear the empty drum phenomenon. Eliminate air (6) : when the shop is stuck coil, the side facing the shop with a rubber scraper toward the coil order transverse hard pressure again, especially the additional layer area (for full paste) in order to pressure, to completely eliminate the air between the coil and grassroots. (7) : rolling after exclusion of air, available outsourcing rubber iron roller for rolling, roof corners, the water area in order to roll, strong to ensure that the binding is close-grained, not empty drum. (8) adhesion of the coil joint: after the end of the work, the long side of the coil and the short side lap joint use lyx-603-2 adhesive for bonding. The width of the rolling material and the rolling material shall be pasted in table 3, and the adhesion shall start at one end and the hand shall be pressed together in the order, which shall not be allowed to be caused by crepe, cocked, edge and open mouth. After the bonding, press the pressure roller carefully and carefully. The sealing paste must be sealed in the area where the coil overlaps three layers. (9) closed head coil end processing: coil end head should lie into the slots, the use of building sealant closed end, after being sealant curing, can be used mixed with latex cement mortar will be leveled calender grooves with closed. (10) storage test and coating colorants: when the coil after the shop is stuck, water storage experiment was carried out, the roof pitch depth of not less than 100 mm, the highest part time not less than 24 h, observe no leakage, qualified after the dust on the surface of the coil and clean of debris. Brush the surface of the coil with long rolling brush. A person's roofing can be laid tile or other rigid cover. (3) project acceptance, product protection, precautions and the requirements of the waterproof rolling materials of epdm.
本文档为【北京市屋面卷材防水推荐做法(Beijing roof coil waterproof recommendation method)】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_731942
暂无简介~
格式:doc
大小:65KB
软件:Word
页数:0
分类:理学
上传时间:2017-10-07
浏览量:20