LIST OF UNAUTHORISED PROPERTIES 9PLOT SIZE 26 :未经授权的性质9plot大小为26的列表
LIST OF VIOLATION IN PROPERTIES FOR ROHINI AND NARELA RESIDENTIAL PLOTTED SCHEME
GENERAL NOTES
1. Although sufficient care has been taken in compilation of the record on the basis of availabvale information, in case of any
clarification/discrepancy, the office of Director (Bldg.), DDA, C-I Flirst Floor, Vikas Sadan, INA, New Delhi may please be contacted.
2. The list of properties where Sealing-cum-Demolition Orders have been passed after issuing Show Cause notice under DD Act 1957 is as under :
LIST OF VIOLATION IN PROPERTIES (PLOT SIZE 26 SQM TO 90 SQM
IN ROHINI AREA) IN WHICH S.D. ORDERS PASSED (Sector-20)
S.No. PROPERTY FILE NO. DETAILS OF DATE OF REMARKS
DETAILS VIOLATIONS S.D.
PLOT NO./ ORDERS
PKT./
SECTOR
1. 21/1/20 FS20/01(21)/01 Type A,B&E 13.5.05 Steps removed from front side and one room sealed at ground
floor on 25.11.05
2. 26/01/20 FS20/01(26)/03 Type A, B, D &E 7.7.05 Steps removed from front and back ground floor sealed on
25.11.05
3. 27/01/20 FS20/01(27)/99 Type A, B, D & E 7.7.05 Steps removed from front side and second floor sealed on
25.11.05
4. 37/01/20 FS20/01/(37)/01 Type A & E 13.05.05 Steps removed from front side and building sealed on 25.11.05.
5. 54/01/20 FS20/01(54)/01 Type A,B,E 13.05.05 Steps removed from front and back and first floor sealed on
25.11.05.
6. 75/01/20 FS20/01(75)/01 Type A,B,D,E 27.05.05 P.fixed 20.09.05 but action could not be taken.
8. 77/01/20 FS20/01(77)/02 Type B&D 02.11.04
9. 87/01/20 FS20/01(87)/01 Type B,D&F 20.09.02
10. 88/01/20 FS20/01(88)/01 Type B,D&F 20.09.02
11. 90/01/20 FS20/01(90)/01 Type A,B&E 04.07.05 Steps removed front side and one room sealed at ground floor on
25.11.05.
12. 92/01/20 FS20/01(92)/01 Type A,B&E 27.05.05 One room sealed at first floor & steps demolished on 25.11.05.
13. 138/01/20 FS20/01(138)/01 Type B&D 16.05.02
14. 82/01/20 FS20/01(82)/01 Type A,E&F 11.07.02 Sealed on 18.12.02
15. 80/01/20 FS20/01(80)/01 Type B&E 03.02.06
16. 04/10/20 FS20/10(04)/01 Type AB&E 07.07.05
17. 09/10/20 FS20/10(09)/01 Type A,B&E 24.06.05
18. 49/10/20 FS20/10(49)/01 Type A,B&E 24.06.05
19. 61/10/20 FS20/10(61)/01 Type A,B&E 24.06.05 One room sealed at first floor on 21.12.05
20. 63/10/20 FS20/10(63)/01 Type B,D&E 24.06.05 One room sealed at second floro on 21.12.05.
21. 68/10/20 FS20/10(68)/01 Type A,B&E 07.07.05 Steps removed by allottee. Building sealed on 20.01.06.
22. 99/10/20 FS20/10(99)/01 Type A,B&E 07.07.05
23. 106/10/20 FS20/10(106)/01 Type A,B&E 24.06.05 Steps removed, entry gate at F.F. sealed on 20.01.06.
24. 136/10/20 FS20/10(136)/01 Type A,B&E 24.06.05 G.F. sealed, one room at S.F. sealed, steps at G.F. demolished
on 20.01.06.
25. 068/12/20 FS20/12(68)/99 Type A,B,D&E 24.06.05
26. 18/12/20 FS20/12(18)/00 Type A,B&E 13.05.05 Property fully sealed on 26.09.05
27. 23/12/20 FS20/12(23)/01 Type A,B&E 24.06.05 One room sealed at first floor, toilet sealed at ground floor on
21.12.05.
28. 26/12/20 FS20/12(26)01 Type A,B&E 12.05.05 Property fully sealed on 26.09.05.
29. 27/12/20 FS20/12(27)/01 Type A,B&E 08.07.05
30. 28/12/20 FS20/12(28)/01 Type A,B&E 13.05.05 Property sealed on 26.09.05
31. 31/12/20 FS20/12(31)/01 Type A,B,D&E 03.05.05 First floor sealed and secodn floor sealed steps removed from
govt. land from front side.
32. 38/12/20 FS20/12(38)/97 Type A,B&E 09.09.03
33. 41/12/20 FS20/12(41)/01 Type A,B&E 21.02.05 Property demolished and partly sealed on 24.06.05.
34. 48/12/20 FS20/12(48)/01 Type B&D 17.12.02 One room sealed at first floor and one room sealed at second
floor on 24.02.03
36. 55/12/20 FS20/12(55)/01 Type A,B&E 24.06.05
37. 57/12/20 FS20/12(57)/00 Type A,B&E 07.07.05
38. 74/12/20 FS20/12(74)/01 Type A,B&D 17.12.02 Part grond floor, first floor, second floor sealed on 25.02.03.
39. 80/12/20 FS20/12(80)/99 Type A&E 03.05.05 Property sealed on 26.09.05
40. 88/12/20 FS20/12(88)/01 Type A,B&E 24.06.05 Building sealed & steps demolished on 20.01.06
41. 96/12/20 FS20/12(96)/99 Type B&D 17.12.02 Ground floor sealed on 24.02.03
42. 105/12/20 FS20/12(105)/01 Type A,B&E 24.06.05
43. 117/12/20 FS20/12(117)/01 Type A,B,E&F 19.12.05
44. 118/12/20 FS20/12(118)/01 Type A,B,E&F 19.12.05
46. 126/12/20 FS20/12(126)/00 Type A,B,D&E 07.07.05 One room sealed at second floor and store sealed at grond floor
on 21.12.05.
47. 131/12/20 FS20/12(131)/01 Type A,B,D&E 03.05.05 Second floor sealed on 26.09.05
48. 152/12/20 FS20/12(152)/01 Type A,B,D&E 27.05.05 Property fully sealed on 26.09.05
49. 83/12/20 FS20/12(83)/01 Type E 03.02.06
50. 98/12/20 FS20/12(98)/01 Type E 03.02.06
51. 10/13/20 FS20/13(10)/01 Type A,B&E 05.08.05 Steps demolished one bath room at S.F. sealed on 20.01.06
52. 11/13/20 FS20/13(11)/01 Type A,B&E 05.08.05 Building sealed, steps demolished on 20.01.06.
53. 28/13/20 FS20/13(28)/01 Type A,B&E 28.07.05 P.fixed for 21.12.05 but action could not be taken.
54. 30/13/20 FS20/13(30)/01 Type A,B,D&E 05.08.05 As against S.No.52 above.
55. 34/13/20 FS20/13(34)/01 Type A,B,&E 05.12.05
56. 35/13/20 FS20/13(35)/01 Type A,B&E 05.08.05 Bath room at F..F sealed, steps at G.F. demolished on 20.01.06
57. 36/13/20 FS20/13(36)/01 Type A,B&E 04.08.05
58. 39/13/20 FS20/13(39)/01 Type A &B 28.03.02 (Staircase) roof projection sealed on 18.12.02
59. 52/13/20 FS20/13(52)/03 Type A,B&E 19.09.05
60. 57/13/20 FS20/13(57)/00 Type A,B&D 14.02.02
61. 66/13/20 FS20/13(66)/01 Type B,D&E 09.09.05
62. 77/13/20 FS20/13(77)/01 Type A,B&E 05.08.05
63. 85/13/20 FS20/13(85)/01 Type A,B&E 05.08.05
64. 88/13/20 FS20/13(88)/01 Type A&E 05.08.05 Property sealed on 21.12.05
65. 89/13/20 FS20/13(89)/01 Type A,B,D&E 08.07.05 Building sealed on 21.12.05
66. 91/13/20 FS20/13(91)/01 Type A,B&E 29.08.05
67. 92/13/20 FS20/13(92)/01 Type A,B&E 25.08.05
68. 98/13/20 FS20/13(98)/01 Type A,B&E 05.08.05 As against S.No.52 above.
69. 111/13/20 FS20/13(111)/01 Type A,B&E 18.09.05
70. 113/13/20 FS20/13(113)/01 Type A &E 14.11.05
71. 114/13/20 FS20/13(114)/01 Type A&E 19.08.05
72 117/13/20 FS20/13(117)/01 Type A,B,D&E 04.08.05
73. 121/13/20 FS20/13(121)/01 Type A,B,D&E 14.11.05
74. 123/13/20 FS20/13(123)/01 Type A,B&E 19.08.05
75. 124/13/20 FS20/13(124)/00 Type A,B&E 26.11.05
76. 129/13/20 FS20/13(129)/01 Type A,B&E 04.08.05
77. 134/13/20 FS20/13(134)/02 Type A,B &E 05.08.05 Building found locked. Action taken as against S.No.52 above.
NOTE: A - Steps/Platform/Cupboard/Staircase on Govt. land (outside plot line) at G.F.
B - Roof Projections in front/rear/sides outside plot line at roof level (in air).
C - Construction over Roof Projection.
D - Construction without sanction of building plan.
E - Excess Coverage.
F - Amalgamation of two plots.
G - Third Floor construction.
H - Basement constructed.
I - B-1 not applied.
LIST OF VIOLATION IN PROPERTIES (PLOT SIZE 26 SQM TO 90 SQM
IN ROHINI AREA) IN WHICH S.D. ORDERS PASSED (sector-21)
S.No. PROPERTY FILE NO. DETAILS OF DATE OF REMARKS
DETAILS VIOLATIONS S.D.
PLOT NO./ ORDERS
PKT./
SECTOR
1. 74/01/21 FS21/01(74)/97 Type A,B,D &E 11.06.04 One room sealed at second floor on 14.12.05
2. 79/01/21 FS21/01(79)/01 Type A,B&E 02.11.04 One room sealed at ground floor 14.12.05
3. 45/01/21 FS21/01(45)/01 Type A,B,&E 10.06.04 Property sealed on 20.06.05
4. 50/02/21 FS21/02(50)/ Type A,B&E 18.07.05 P.fixed for 09.11.05 but action could not be taken.
5. 94/02/21 FS21/02(94)/01 Type B 24.11.02
6. 06/03/21 FS21/03(06)/03 Type B&E 02.11.04 Property sealed.
7. 33/03/21 FS21/03(33)/02 Type A 11.06.04 Property sealed and partly damaged.
8. 42/05/21 FS21/05(42)/97 Type A,B&E 16.07.04 P.fixed for 22.02.05, 14.12.05 and now re-fixed for 17.02.06.
9. 49/05/21 FS21/05(49)/01 Type A,B,D&E 07.05.04 --Do--
10. 56/05/21 FS21/05(56)/99 Type A&E 30.12.04 Property sealed
11. 72/05/21 FS21/05(72)/01 Type B&D 07.11.02
12. 77/05/21 FS21/05(77)/00 Type A,B&E 11.06.04 P.fixed for 22.02.05. Now, re-fixed for 17.02.06.
13. 80/05/21 FS21/05(80)/00 Type B,D&E 07.05.04 --Do--
14. 73/05/21 FS21/05(73)/02 Type A&B 18.07.05 Room sealed at ground floor.
15. 81/05/21 FS21/05(81)/00 Type B 09.09.03 Property sealed on 18.08.04.
16. 92/05/21 FS21/05(92)/03 Type A,B&E 07.05.04 As against S.NO.12 above.
17. 146/05/21 FS21/05(146)/97 Type A,B&E 11.06.04 --Do--
18. 28/06/21 FS21/06(28)/03 Type A,B,D&E 07.05.04 Property sealed on 28.01.05.
19. 20/06/21 FS21/06(20)/02 Type A,B&E 29.12.04 Property sealed and partly demolished 17.03.05.
20. 50/06/21 FS21/06(50)/00 Type A,B&E 11.06.04 P.fixed for 28.02.05. Now re-fixed for 17.02.06.
21. 82/06/21 FS21/06(82)/02 Type A,B&E 23.12.04
22. 90/08/21 FS21/08(90)/04 Type B&E 20.04.05 Steps front & back side removed and ground floor one room
sealed.
23. 21/09/21 FS21/09(21)/01 Type B&D 01.07.03 Property sealed on 7.10.03
24. 56/09/21 FS21/09(56)/02 Type A,B&E 16.08.04 Front ramp demolished, second floor sealed on 28.01.05.
25. 61/09/21 FS21/09(61)/03 Type A,B,E&F 13.08.04 Entry gate sealed on 28.01.05
26. 62/09/21 FS21/09(62)/03 Type A,B,E&F 13.08.04 -do-
27. 63/09/21 FS21/09(63)/03 Type A,B&E 02.11.04 Building sealed on 20.06.05
28 76/09/21 FS21/09(76)/03 Type A,B&E 20.04.05 One room sealed at ground floor.
29. 150/09/21 FS21/09(150)/01 Type A,B&E 16.11.04 Building sealed on 14.12.05
30. 155/09/21 FS21/09(155)/01 Type B&E 21.02.05 Building completely sealed on 14.12.05
31. 162/09/21 FS21/06(162)/01 Type B,E& H 21.02.05 Building completely sealed.
32. 167/09/21 FS21/09(167)/ Type A,B,E&F 14.07.05 Room & Store sealed at first floor, one room sealed at ground
floor, part of second floor demolished on 09.11.05.
33. 168/09/21 FS21/09(168)/ Type A,B,E&F 14.07.05 -do-
34. 195/09/21 FS21/09(195)/ Type A,B,D&E 15.07.04 P.fixed for 28.01.05. Now, re-fixed for 17.02.06.
35. 209/09/21 FS21/09(209)/00 Type B 11.02.02 First and second floor sealed 21.05.02.
36. 238/09/21 FS21/09(238)/01 Type A & B 20.08.04 P. fixed for 17.02.06.
37. 239/09/21 FS21/09(239)/01 Type A&B 29.12.05
38. 240/09/21 FS21/09(240)/01 Type A &B 29.12.05
39. 245/09/21 FS21/09(245)/01 Type A,B&E 06.12.04 Partly sealed.
40. 303/09/21 FS21/09(303)/99 Type A&E 20.04.05 P. fixed for 09.11.05, 10.01.06 but action could not be taken.
41. 304/09/21 FS21/09(304)/97 Type A,D&E 07.07.05 --Do--
42. 320/09/21 FS21/09(320)/99 Type A,B&D 07.05.03 Sealed, de-sealed and resealing orders issued on 26.10.04.
43. 321/09/21 FS21/09(321)/99 Type A,B&D 16.07.02 One room at first, second and third floor sealed on 18.12.02
44. 340/09/21 FS21/09(340)/02 Type A,B&E 20.04.05 As against S.No.40 above.
45. 341/09/21 FS21/09(341)/02 Type A,B&E 08.07.05 --Do--
46. 343/09/21 FS21/09(343)/00 Type A,B&E 20.04.05 --Do--
47. 422/09/21 FS21/09(422)/01 Type A,B&E 21.02.05 --Do--
48. 431/09/21 FS21/09(431)/01 Type A,B&E 13.05.05 --Do--
49. 16/10/21 FS21/10(16)/02 Type B&E 01.07.03 First and second floor sealed on 07.10.03.
50. 44/10/21 FS21/10(44)/03 Type A,B&E 30.12.04 Property sealed.
51. 130/10/21 FS21/10(130)/01 Type A,B&E 30.12.04 Property sealed on 13.07.05
52. 131/10/21 FS21/10(131)/99 Type A,B&E 30.12.04 Property sealed on 13.07.05
53. 144/10/21 FS21/10(144)/0 Type A,B&E 23.12.04 P.fixed for 13.05.05, 09.11.05, 10.01.06 but postponed due to
nonavailability of Police Force.
54. 191/10/21 FS21/10(191)/ Type A,B&E 16.11.04 P.Fixed for 20.06.05, 14.12.05. Now, re-fixed for 17.02.06.
55. 199/10/21 FS21/10(199)02 Type A,B&E 23.12.04 As against S.No.53 above.
NOTE: A - Steps/Platform/Cupboard/Staircase on Govt. land (outside plot line) at G.F.
B - Roof Projections in front/rear/sides outside plot line at roof level (in air).
C - Construction over Roof Projection.
D - Construction without sanction of building plan.
E - Excess Coverage.
F - Amalgamation of two plots.
G - Third Floor construction.
H - Basement constructed.
I - B-1 not applied.
LIST OF VIOLATION IN PROPERITIES (PLOT SIZE 26-SQM TO 90-SQM IN ROHINI AREA) IN WHICH S.D.
ORDERS PASSED (Sector-22)
S.NPROPERT FILE NO. DETAILS OF DATE REMARKS
O. Y VIOLATIONS OF S.D.
DETAILS ORDERS
PLOT NO./
PKT./
SECTOR
1. 12/1/22 F.22/1(12)/0Type-A,B & E 15.06.04 Platform on Govt. land
2 demolished & F.F. sealed
on 24.12.04
2. 37/1/22 F.22/1(37)/0Type-A,B,D,E 05.10.05
4 & F
3. 38/1/22 F.22/1(38)/0 --Do-- 05.10.05
4
4. 89/1/22 F.22/1(89)/0Type-B,C,D & 10.02.04 Property sealed on 12.09.05.
3 E
5. 48/2/22 F.22/2(48)/0Type-A,B & E 07.05.04
3
6. 72/2/22 F.22/2/(72)/ --Do-- 26.12.03
02
7. 74/2/22 F.22/2/(74)/Type-A,B & D 24.08.04 26.08.05, 16.11.05 action
04 taken.
8. 101/2/22 F.22/2(101) --Do-- 20.06.04
03
9. 113/2/22 F.22/2/(113)Type-A,B,D & 05.04.05
01 E
10. 142/2/22 F.22/2(142)/Type-A,B & E 10.02.04
02
11. 148/2/22 F.22/2(148)/Type-A,B & E 07.05.03
02
12. 163/2/22 F.22/2(163)/Type-A,B & E 10.02.04
02
13. 166/2/22 F.22/2(166)Type-A,B,D & 03.07.03 IInd Floor sealed & IIIrd
03 E Floor damaged,
encroachment on Govt.
Land removed on 14.10.03.
Property sealed, de-sealed
and re-sealing orders issued
on 14.05.04
14. 181/2/22 F.22/2(181)Type-A,B & E 10.02.04
97
15. 310/2/22 F.22/2(310)Type-A,B & E 22.06.04
02
16. 17/3/22 F.22/3(17)/0Type-A,B & E 24.06.04 Property sealed on
2 24.12.2004
17. 18/3/22 F.22/3(18)/0Type-A & B 24.08.04 26.08.05, 16.11.05. Action
4 taken.
18. 20/3/22 F.20/3/(21)/Type-B & E 03.07.03 Property sealed on 07.01.04
03
19. 21/3/22 F.22/3(21)/0Type-A,B,D & 24.06.04 Property sealed on 24.12.04
2 E
20. 29/03/22 F.22/3(29)/0Type-A,B,D & 24.06.04
3 E
21. 43/3/22 F.22/3(43)/0Type-B & E 16.07.03 Property sealed on 07.01.04
1
22. 81/3/22 F.22/3(81)/0Type-B & E 26.12.03 Property sealed on 25.11.04
2
23. 159/3/22 F.22/3(159)/Type-B & E 24.07.03 Property sealed on 14.10.03
02
24. 160/3/22 F.22/3(160)Type-A,B,D & 03.08.05 One room at F.F. & S.F.
03 E floor sealed on 16.11.05 25. 200/3/22 F.22/3/(200)Type-B & E --
03
26. 202/3/22 F.22/3/(202)Type-A,B & E 24.06.04
03
27. 236/3/22 F.22/3(236)/Type-A,B,D & 14.11.05
02 E
28. 239/3/22 F.22/3(239)/Type-A & D 04.07.05 Sealed on 16.11.05
97
29. 264/3/22 F.22/3(264)/Type-A,B,D & 22.06.04
01 E
30. 265/3/22 F.22/3(265)/Type-A,B & E 06.08.04 --Do--
03
31. 273/3/22 F.22/3(273)/Type-A,B & E 18.10.04
02
32. 286/3/22 F.22/3(286)/Type-A,B,D & 15.06.04
02 E
33. 304/3/22 F.22/3(304)/Type-A,B,D &
02 E
34. 306/3/22 F.22/3(306)/Type-A,B & E 26.12.03 Sealed on 25.11.04
97
35. 15/4/22 F.22/4(15)/0Type-A,B & E 24.06.04
3
36. 16/4/22 F.22/4(16)/9Type-A,B & E 22.06.04
8
37. 20/4/22 F.22/4(20)/0Type- 03.07.03 --Do--
2 A,B,C,E&F
38 21/4/22 F.22/4(22)/0 --Do-- --Do-- 12.01.05. Postponed due to
2 non availability police
force.
39. 25/4/22 F.22/4/(25)/Type-A,B,D & 24.06.04
02 E
40. 45/4/22 F.22/4(45)/0Type-A,B,D & 24.07.03 12.01.05. Postponed due to
2 E non availability of Police
Force.
41. 61/4/22 F.22/4(61)/0Type-B,C,D & 07.11.02
2 F
42. 62/4/22 F.22/4(62)/0 --Do-- --Do--
2
43. 109/4/22 F.22/4(109)/Type-A,B & E 10.02.04
03
44. 160/4/22 F.22/4(160)/Type-B & E 24.07.03 Sealed on 12.04.04
02
45. 161/4/22 F.22/4(161)/Type-A,B & D 24.08.04
04
46. 261/4/22 F.22/4(261)/Type-B,D,E & 24.07.03 Platform on Govt. land
02 F demolished and one room
sealed on 07.01.04
47. 262/4/22 F.22/4(262)/ --Do-- --Do--
02
48. 270/4/22 F.22/4(270)/Type-B,E & F 16.07.03 Sealed on 25.11.2004
03
49. 271/4/22 F.22/4(271)/ --Do-- --Do--
03
50. 352/4/22 F.22/4(352)/Type-A,B,D & 16.08.04
02 E
51. 355/4/22 F.22/4(355)/Type-A & B 16.08.04
04
52. 408/4/22 F.22/4(408)/Type-A,B,D & 24.08.04 Platform on Govt. land
03 E demolished & railing
removed from Roof
Projection and property
sealed on 07.09.05
53. 422/4/22 F.22/4(422)/Type-A,B,D & 07.05.04 15.01.05. Postponed due to
02 E non-availability of Police
Force.
54. 430/4/22 F.22/4(430)/Type-A,B & E 12.05.05 Sealed on 16.11.05
03
55. 436/4/22 F.22/4(436)/Type-A,B & E 10.01.05 Sealed on 16.11.05
03
56. 438/4/22 F.22/4(438)/Type-B & E 20.01.02 Sealed on 25.11.02(Back
00 Door)
57. 455/4/22 F.22/4(455)/Type-A,B,D &
03 E
58 457/4/22 F.22/4(457)/Type- 30.08.04
03 A,B,D,E&F
59. 458/4/22 F.22/4(458)/ --Do-- --Do--
03
60. 347/4/22 F.22/4(347)/Type-A,B,D & 24.08.04 Sealed on 07.09.05
01 E
61 15/5/22 F.22/5(15)/0Type-A,B & E 20.06.05 26.08.05, 16.11.05. Action
3 taken.
62. 40/5/22 F.22/5(40)/9Type-A,B,D & 16.08.04
7 E
63. 43/5/22 F.22/5(43)/0Type-B,D & E 31.01.03 12.01.05. Postponed due to
1 non-availability of Police
Force.
64. 63/5/22 F.22/5(63)/0Type-A,B & E 16.07.04
3
65. 65/5/22 F.22/5(65)/0Type-A,B,D,E 10.02.04 12.01.05. Postponed due to
2 & F non-availability of Police
Force.
66. 66/5/22 F.22/5(66)/0 --Do-- --Do-
2
67. 99/5/22 F.22/5(99)/0Type-A,B & E 22.06.04
2
68. 127/5/22 F.22/5(127)/Type-B & E 16.07.04
03
69. 150/5/22 F.22/5(150)/Type-A,B & E 01.07.02
02
70. 151/5/22 F.22/5(151)/Type-A,B & E 16.08.04
03
71. 170/5/22 F.22/5(170)/Type-A,B & D 11.06.04 Steps from Govt. land
01 removed and one room
sealed at S.F. on 16.12.05.
72. 198/5/22 F.22/5(198)/Type-A,B,D & 09.11.04
03 E
73. 172/5/22 F.22/5(172)/Type-A,B,D & 05.01.06
02 E
74. 173/5/22 F.22/5(173)/Type-A,B,C,D 05.12.05
02 & E
75. 243/5/22 F.22/5(243)/Type-A,B,D & 10.02.04 12.01.05. Postponed due to
02 E non-availability of Police
Force.
76. 250/5/22 F.22/5(250)/Type-A,B & E 06.08.04
04
77. 274/5/22 F.22/5(274)/Type-A,B,D & 16.08.04 Platform from Govt. land
02 E removed one room at F.F.
and bathroom at S.F. sealed
on 16.12.05. 78. 289/5/22 F.22/5(289)/Type-A,B,D & 15.07.04
03 E
79. 291/5/22 F.22/5(291)/Type-A,B & E 15.06.04 16.12.05. Action taken.
03
80. 326/5/22 F.22/5(326)/Type-A,B,D & 05.12.05
02 E
81. 350/5/22 F.22/5(350)/Type-B,D & E 28.02.02
00
82. 361/5/22 F.22/5(361)/Type-A,B & E 16.08.04
03
83. 66/6/22 F.22/6(65)/0Type-A,B & E 15.06.04
2
84. 97/6/22 F.22/6(97)/9Type-A,B & E 23.07.04 One Room at Mazzine Floor
8 sealed on 31.01.06 85. 137/6/22 F.22/6(137)/Type-A,B & E 20.06.05 26.08.05, 16.11.05. Action
02 taken. 86. 150/6/22 F.22/6(150)/Type-A,B,D & 03.12.04
02 E
87. 171/6/22 F.22/6(171)/Type-A,B & E 29.08.05
04
88. 216/6/22 F.22/6(216)/Type-B & E 26.12.03
03
89. 167/6/22 F.22/6(167)/Type-A,B,D,E 05.12.05
03 & H
90. 222/6/22 F.22/6(222)/Type-A, B & E 20.06.05 26.08.05, 16.11.05. Action
02 taken. 91. 20/7/22 F.22/7(20)/0Type-A, B & E 15.06.04
3
92. 98/7/22 F.22/7(98)/0Type-A,B & E 18.05.04
2
93. 108/7/22 F.22/8(108)/Type-A,B,D & 15.06.04
02 E
94. 45/8/22 F.22/8(45)/0Type-A,B & E 23.07.04
3
95. 71/8/22 F.22/8(71)/9Type-C & D 15.02.01 Property sealed on 24.03.01
7
96. 75/8/22 F.22/8(75)/0Type-A,B & E 24.06.04
2
97. 122/8/22 F.22/8(175)/Type-A,B,E & 22.06.04
01 F
98. 123/8/22 F.22/8(123)/ --DO-- 23.07.04
98
99. 153/8/22 F.22/8(153)/Type-A,B,C,D 05.12.05
03 & E
100. 219/8/22 F.22/8(219)/Type-A & B 06.08.04
02
101. 227/8/22 F.22/8(227)/Type-A,B & E 29.03.05
02
102. 231/8/22 F.22/8(231)/Type-A,B & E 07.05.04
02
103. 96/8/22 F.22/8(96)/0Type-A,B & D 26.03.02 Sealed on 16.12.05
0
104. 33/11/22 F.22/11(33)/Type-A,B & E 06.08.04 Sealed on 31.01.06
02
105. 37/11/22 F.22/11(37)/Type-A,B,D & 22.06.04 Platform demolished.
98 E Building not sealed due to
non provision of door. 106. 50/11/22 F.22/11(50)/Type-A,B & D 24.08.04 Sealed on 07.09.05
04
107. 124/11/22 F.22/11(124Type-A & B 24.06.04
)/03
108. 174/11/22 F.22/11(174Type – A,B,D 07.05.04 One room at G.F. & one
)/02 & E room at S.F. sealed on
31.01.06.
NOTE: A – Steps/Platform/Cupboard/Staircase on Govt. land (Outside plot line) at G.F.
B – Roof Projections in front/rear/sides outside plot line at roof level (in air).
C – Construction over Roof Projection.
D – Construction without sanction of building plan.
E – Excess Coverage
F – Amalgamation of two plots.
G – Third floor constructed.
Basement constructed. H –
I – B-1 not applied.
LIST OF VIOLATION IN PROPERITIES (PLOT SIZE 26-SQM TO 90-SQM IN ROHINI AREA) IN WHICH S.D.
ORDERS PASSED (Sector-24)
A- Steps/Plateforms on Govt. land at G.F.
B- Roof Projections in Front/Rear/sidebeyond Bldg. Line
C- Construction on Roof Projections.
D-S.F. Construction.
E-Excess Coverage
F- Amalgamation of Two Properties.
G- Third Floor Construction
H- Basement is Constructed
I- B1 Not applied
S. Property File No. Unauthorized Dt. Of S.D. No. Pt.No./Pkt./Sector Construction ImplenentatiRemarks
on order
1 17--14--24 F.S/24/14/(17) 99 Type E, D,B,A 26/12/03 P.fixed for 13.03.05. Now re-fixed for 14.02.06
19/02/2004
2 45--14--24 F.S/14/24(45)02 Type E,B 3/7/03
22/07/03
3 39-14--24 F.S./24/14(39)02 Type E,B 3/5/05 P.fixed for 26.12.05 but action could not be taken.
21/06/05
4 72--14-24 F.S./24/14(72)02 Type E,D,B,F,A 3/7/03
22/07/03 Property Found 5 71--14--24 E.S/24/14(71)02 Type E,D,B.F,A 3/7/03 Occupied
22/07/03 Do
6 82--14--24 F.S/24/14(82)04 Type E,F,B,D,A 29/03/05 Un authorized Construction
6/5/05 on Second Floor has seen
Ramps & Stair Case Area
Damaged from Govt. Land
7 83--14-24 F.S./24/14(83) 04 Type E,F,B,D,A 29/03/05
6/5/05 Do.
8 134-14-24 F.S./24/14(134)04 Type E,F,B,D 22/03/05 P. fixed for 23.11.05 but action could not be taken.
8/7/05
9 133-14-24 F.S./24/14(133)04 Type E,F,B,D 20/06/05 --Do--
8/7/05
10 170-124 F.S./24/14(170)02 Type B,A,F,E,D 6/5/03 Property found duly occupied
27/05/03 by at ground floor partly first
floor and second floor portion
sealed of both property 11 171-14-24 F.S./24/14(171)02 Type D,A,F,B,E 5-Jun
27/05/03
12 123-14-24 F.S./24/14(123)01 Type E,D,B
13 158-14-24 F.S./24/14(158)03 Type E,F,D,B 15/06/04
20/08/04 Plateform on Govt. Land demolished
one bedroom and bathroom
on 2nd floor has sealed & store sealed at G.F. & F.F. 14 159-14-24 F.S./24/14(159)03 Type E,F,D,B Do do.
15 198-14-24 F.S./24/14(198)04 Type E,F,D,B
16 182-16-24 F.S/24/16(182)03 Type E,D,B 24/07/03 Complete building has been sealed
8/8/03
17 161-16-24 F.S./24/16/(161)02 Type E,D,B,A 3/7/03 G.F sealed
22/07/03
18 162-16-24 F.S./24/16(162)02 Type E,D,B,A Do do
19 122-16-24 F.S./24/16(122)03 Type E,G,B 15/06/04 G.F. sealed F.F & S.F
20/08/04 Not Sealed due to duly occupied
20 118-16-24 F.S./24/16(118)03 Type F,E,B 9/2/04 G.F complete buil sealed of Plot No.119
23/04/04 Terrace Room seal in Plot No.118 21 119-16-24 F.S./24/16(119)03 Do DO Do
22 131-16-24 F.S./24/16(131)02 Type B,C,D,E 7/5/03 F.F sealed
30/05/03
23 138-16-24 F.S/24/16(138)98 Type E,B,E 5/6/00 property has sealed
12/7/00
24 169-16-24 F.S,/24/16/(169)03 Type F,E,B 24/07/03 property has been sealed complete
14/08/03
25 170-16-24 F.S./24/16(170)03 do do do
S.No. Property Pt. File No. Unauthorized Dt. Of
No./Pkt. Sector Construction S.D./ Remarks
Implem
entation
Order
26. 135-17-24 F.S.24/17/(135)/0Type E,F,B,D 04/07/05 P. fixed on 26.12.05 but action could not be taken.
4 05/08/05 27. 136-17-24 F.S./24/17/(136)/do Do --Do--
04
28. 130-17-24 F.S./24/17/(130)0Type E.B, 26/10/04 One room sealed at G.F. & S.F. Ramp/Platform demolished on 07.02.06
3 06/12/04 29. 84-17-24 F.S./24/17/(84)/0Type E,F,D 23/04/04 Plate form remove on govt. land S.F partly sealed
3 11/06/04 30. 85-17-24 F.S./24/17/(85)/0Type E,F,B Do Do
3
31. 86-17-24 F.S./24/17/(86)/0do Do Do
3
32. 03-17-24 F.S./24/17/(03)/0Type E,F,B,A 03/08/05
4 06/09/05 33. 96-17-24 F.S./24/17/(96)/0Type E,F,D,B 01/06/04 P. fixed on 06.04.05, 25.10.05, 23.12.05 but action could not be taken.
3 13/07/04 34. 97-17-24 F.S./24/17/(97)/0Do Do --Do--
3
35. 143-17-24 F.S./24/17/(143)/Type E,D,B 31/08/03 P.fixed on 19.04.05 but action could not be taken.
02 12/09/03 36. 12-17-24 F.S./24/17/(12)/0Type E,F,B,A
4
37. 13-17-24 F.S./24/17/(13)/0Do Do
4
38. 174-17-24 F.S./24/17/(174)/Type E,F,B,A
04
39. 175-17-24 F.S./24/17/(175)/Do
04
rd40. 180-18-24 F.S./24/18/(180)/Type E,D.B,G 24/07/03 3 floor demolished S.F was sealed R/P’s at F.F & S.F Punchared
99 14/08/03
41. 166-18-24 F.S./24/18(166)/0Type E,F,D 05/10/05
4 29/12/05
42. 213-18-24 F.S,/24/18/(213)/Type E,D,B 24/07/03 Encroachment on Govt. land Demolished
02 14/08/03
43. 149-18-24 F.S./24/18/(149)/Type E,B,A 18/07/05
02 05/08/05
44. 144-18-24 F.S./24/18/(144)/Type E,F,D,B 10/02/04 At G.F, F.F.& S.F Stair Case room sealed in complete building
00 23/04/04
45. 225-18-24 F.S./24/18/(225)/Type E,G,D,B 04/08/03 Complete property sealed
01 14/08/03
46. 129-18-24 F.S./24/18/(129)/Type E,D,B 24/07/03 F.F. one room sealed
02 14/08/03
47. 143-18-24 F.S./24/18/(143)/Type F,E,D,B 20/01/04 F.F. & S.F stair case room seal in complete building.
00 19/02/04
48. 151-18-24 F.S./24/18/(151)/Type E,D,B,A 26/12/03 P.fixed on 11.03.05. Now fixed on 14.02.06.
01 19/02/04
49. 130-18-24 F.S./24/18/(130)/Type E,F,B 24/07/03
02 14/08/03
50. 78-18-24 F.S./24/18/(78)/0Type E,D,B 26/08/03 P.fixed on 20.05.05 but action could not be taken.
2 16/09/03
51. 242-18-24 F.S./24/18/(242)/Type E,B,A 05/01/04 P.fixed on 23.11.05 but action could not be taken.
01 19/02/04
52. 36-18-24 F.S./24/18/(36)/0Type E,D,B 26/12/03 As against S.No.48 above.
1 19/02/04
53. 274-18-24 F.S./24/18/(274)/Type E,B,A 24/02/05 Complete building seal and stair case on Govt. Land removed
04 06/02/05
54. 223-18-24 F.S>/24/18/(223)/Type E,B,A 17/08/05
04 06/09/05
55. 40-18-24 F.S./24/18/(40)/0Type E,D,B 19/01/05 P.fixed for 14.02.06
1 09/03/05
56. 211-18-24 F.S./24/18/(211)/Type F,D,E 28/02/05 G.F.of the Build. Seal completely
04 06/05/05
57. 212-18-24 F.S./24/18/(212)/Do Do Do
04
58. 189-19-24 F.S./24/19/(189)/Type E,D,B,A 10/02/04 Two shop sealed at G.F an plateform removed on Govt. Land
03 23/04/04 W.C Toilet sealed at S.F 59. 199-19-24 E.S./24/19/(199)/Type E,D,B 31/01/05
97 18/02/05
60. 176-19-24 F.S./24/19/(176)/Type E,D,B 04/04/05
03 05/08/05
61. 54-19-24 F.S./24/19/(54)/0Type E,B,A 26/12/03 As against S.No.48 above.
2 19/02/04
62. 174-19-24 F.S./24/19/(174)/Type E,D,F,B,A 22/03./0P.fixed for 19.03.05 but action could not be taken.
03 4
23/04/04
63. 175-19-24 F.S./24/19/(175)/Do Do --Do--
03
64. 188-19-24 F.S./24/19/(188)/Type E,D,B,A 26/12/03 --Do--
99 19/02/04
65. 15-19-24 F.S./24/19/(15)/0Type E,D,B,A 15/07/04 P.fixed for 20.05.05 but action could not be taken.
3 20/08/04
66. 235-19-24 F.S./24/19/(235)/Type E,B,A 17/08/05
04 06/09/05
67. 238-20-24 F.S./24/20/(238)/Type F,D,B,A
02
68. 186-20-24 F.S./24/20/(186)/Type E,D,B,A 05/12/03
02 12/01/04
69. 146-20-24 F.S./24/20/(146)/Type E,D 09/02/04 S.F. bathroom has been sealed, plateform demolished on Govt. Land
01 23/04/04
70 204-20-24 F.S./24/20/(204)/Type E,D, 05/12/03 Action taken as per demolition slip
97 12/01/04
71. 164-20-24 F.S./24/20/(164)/Type E,F,D,B 04/08/03 F.F & S.F has been sealed
03 14/08/03
72. 165-20-24 F.S./24/20/(165)/Do Do Do
03
73. 205-20-24 F.S./24/20/(205)/Type A, E
97
74. 63/20/24 F.S./24/20/(63)/9Type E,D,B,A 05/12/03 Plateform & Stair case steps demolished from Govt. Land
7 12/01/04 S.F sealed partly
75. 02-20-24 F.S./24/20/(02)/9Type E,D,B,A 09/02/04 As against S.No.62 above.
7 12/04/04
76. 10-20-24 F.S./24/20/(10)/0Type F,D,B,C 9/02/04 Plat form has demolished on Gov land
3 25/03/04
One room has sealed SF
77. 11-20-24 F.S.24/20/(11)/03 Do Do Do
78. 82-20-24 F.S.24/20/(82)/98 Type 5/12/04 Plat form in front of Building has demolished on ground floor & puncher
E,B,A 12/01/04 in R/Ps
79. 150-20/24 F.S.24/20/(150)03 Type E,D,F,B 9/02/04 Plat form remove from Govt land
25/03/04 & S. Floor Sealed
80. 151-20-24 F.S24/20/(151)/0 Type Do Do
3 F,E,D,D
81. 81-20-24 F.S24/20/(81)02 Type 5/12/04 Plat form remove Govt land & puncherd in roof project
E,B,A 12/01/04
82. 154-20-24 F.S24/20/(154)/0 Type 5/01/04 F.floor completely sealed & S. floor one room Sealed
3 F,E,D,B 19/02/04 Terrace floor sealed
83. 155-20-24 F.S24/20/(155)/0Type 5/01/04 F.F. completed Sealed & S.F one room sealed, terrace floor sealed
3 F,E,D,B 19/02/04
84. 208-20-24 F.S./24/20/(208)/Type E,F,B 20/06/00
98 21/12/00
85. 149-20-24 F.S./24/20/(149)/Type F,E,B 26/04/05 Property fully sealed
02 21/06/05
86. 148-20-24 F.S./24/20/(148)/Do Do Do
02
87. 62-20-24 F.S./24/20/(62)/9Type E,D,B,A 10/02/04 Building sealed at S.F. Encroachment removed from public land infront of
7 23/04/04 building
88 188-20-24 F.S./24/20/(188)/Type E,D,B 05/12/03 S.F has sealed and plateform on Govt. Land demolished
02 12/01/04
89. 206-20-24 F.S./24/20/(206)/Type E,B
97
90. 108-20-24 F.S./24/20/(108)/Type F,E,B,A 24/07/03 S.F. of the property has sealed
02 14/08/03
91. 97-20-24 F.S./24/20/(97)/9Type F,E,B,A 24/07/03 S.F has sealed
8 14/08/03
92. 179-20-24 F.S./24/20/(179)/Type F,D,C,B.E 20/01/04 P.fixed for 05.01.05. Now re-fixed for 14.02.06.
03 19/02/04
93. 180-20-24 F.S./24/20/(180)/Do Do --Do--
03
94. 58-20-24 F.S./24/20/(58)/9Type E,D,B 10/02/04 Steps removed from front side and plateform removed one room sealed at
7 12/04/04 F.F.
95. 109-20-24 F.S./24/20/(109)/Type F,E,D,B 09/02/04 As against S.No.75 above.
03 12/04/04
96. 110-20-24 F.S./24/20/(110)/Do DO --Do--
03
97. 203-20-24 F.S./24/20/(203)/Type E,D,B,A 05/12/03
03 12/01/04
98. 12-20-24 F.S./24/20/(12)/0Type E,D,A 24/02/05 P.fixed for 08.07.05 but action could not be taken.
0 24/02/05
99. 92-21-24 F.S./24/21/(92)/0Type E,B,D,F 05/10/05
0 29/12/05
100. 147-21-24 F.S./24/21/(147)/Type E,B,A
97
101. 45-21-24 F.S./24/21/(45)/0Type E,D,B,C 10/02/04
3 12/04/04
102. 145-21-24 F.S/24/21/(145)/9Type
8 E,I,E
103. 173-21-24 F.S/24/21/(173)/0Type 15/06/04 P.fixed for 20.05.05 but action could not be taken.
3 E,B 20/08/04
104. 194-21-24 F.S/24/21/(194)/9Type 26/12/03
8 E,B,A,D 19/02/04
105. 171-21-24 F.S/24/21/(171)0Type 24/07/03
3 E,F,D,B 14/08/03
106. 172-21-24 F.S/24/21/(172)/0 Do Do G.F & FF Sealed
3
107. 200-21-24 F.S/24/21/(200)/9Type D,E,A 26/11/09As against S.No.48 above.
7 /03
1902/04
108. 140-21-24 F.S/24/21/(140)/9Type
7 E,F,E,B,F
109. 198-21-24 F.S/24/21/(198)/9Type 15/04/04 P.fixed for 14.02.06.
7 D,B,E,A 19/02/04
110. 71-21-24 F.S/24/21/(71)/03 Type 8/06/04 P.fixed for 21.01.05 & 19.04.05 but action could not be taken.
F,B,E,A 13/07/04
111. 72-21-24 F.S/24/21/(72)/03 Do Do P.fixed for 5.8.05, 16.09.05. Now Pro. Re-fixed for 14.02.06.
112. 178-21-24 F.S/24/21/(178)/0Type E,B,A,D
3
113. 138-22-24 F.S.24/22/(138)/9Type 26/12/03 As against S.No.48 above.
8 E,C,D,B,A 19/02/04
114. 83-22-24 F.S.24/22/(83)/03 Type F,E,D,B,A 05/12/03
12/01/04
rd115. 82-22-24 F.S./24/22/(82)/0Do Do Room at G.F. & 3 Floor Sealed
3
116. 85-22-24 F.S./24/22/(85)/0Type E,D,B,A 05/12/03 Bathroom on terrace floor sealed and plateform demolished on Govt. Land.
1 12/01/04
117. 86-22-24 F.S./24/22/(86)/0Type E,D,B 05/12/03
3 12/01/04
118. 200-22-24 F.S./24/22(200)/0Type E,B,A 20/06/05
3 08/07/05
119. 89-22-24 F.S./24/22/(89)/0Type 07/05/03 P. fixed for 23.11.05 but action could not be taken.
1 D,E,B,A,C 27/05/03
120. 43-22-24 F.S./24/22/(43)/9Type E,D,B,A 22/03/04 Room sealed at F.F. Mumty sealed at S.F. plate form and steps demolished
8 23/04/04
LIST OF VIOLATION IN PROPERTIES (PLOT SIZE 26-SQM TO 90-SQM IN ROHINI AREA) IN WHICH S.D.
ORDERS PASSED(SECTOR-25,24(part)
S.NO. PROPERTY FILE NO. DETAILS OF DATE OF REMARKS
DETAILS. PLOT VIOLATIONS S.D.
NO./PKT/SECTRO ORDERS
1. 118/3/25 F25/3(118)/04 Type-B,D,E&F 17.12.04 Property partly
sealed on 21.09.05 2. 119/3/25 F25/3(119)/04 -do- 23.11.04 -do-
3. 143/4/25 F25/4(143)/02 Type-B,D,E&G 23.11.04 Steps on Govt. land
demolished and
complete structure
sealed on 21.09.05 4. 163/4/25 F25/4(163)/01 Type-B&E 06.05.03
5. 164/4/25 F25/4(164)/99 Type-B&E 06.05.03
6. 182/4/25 F25/4(182)/03 Type-B,D&E 23.11.04
7. 224/4/25 F25/4(224)/04 Type-B,D,E,F,G 09.11.04 Structure
completely sealed
on 21.09.05
8. 225/4/25 F25/4(225)/04 -do- -do- -Do-
9. 95/2/25 F24/2(95)/03 Type-B,D,K&F 06.05.03
10. 96/2/24 F24/2(94)/03 -do- -do-
11. 13/2/24 F24/2(13)/ Type-B,D,E 04.07.05
12. 16/2/24 F24/2(16)/02 Type-B,D,E&G 12.05.05
13 113/2/24 F24/2(113)/03 Type-B,D,E 05.03.04
14. 145/2/24 F24/2(145)/03 Type-B,D&E 22.03.04
15. 73/3/24 F24/3(73)/03 Type-B,D,E&F 10.07.03
16. 74/3/24 F24/3(74)/03 Type-B,D,E&F 10.07.03
17. 100/3/24 F24/3(100)/ Type-B,C,D&E 31.12.04
18. 7/3/24 F24/3(7)/02 Type-B,D&E 12.06.03 Platform on Govt.
land demolished
and property sealed
on 29.12.03
19. 138/3/24 F24/3(138)/ Type-B,C,D&E 26.12.03 Steps from govt.
land demolished
and property partly
sealed on 08.06.05 20. 105/3/24 F24/3(105)/03 Type-B,D,E&N 05.03.04 Platform on Govt.
Land demolished. 21. 147/3/24 F24/3(147)/03 Type-B,D,E 12.03.04
22. 42/3/24 F24/3(42)/03 Type-B,D,E 05.03.04
23 155/3/24 F24/3(155)/03 Type-B,D,E 05.03.04
24. 68/3/24 F24/3(68)/02 Type-B,C&E 17.12.04 Property
completely sealed
on 08.06.05
25. 80/3/24 F24/3(80)/02 Type-A,B,D&E 17.12.04
26. 76/03/24 F24/3(76)/04 Type-A,B,D&F 17.12.04
27. 77/3/24 F24/3(77)/04 -do- -do-
28. 30/3/24 F24/3(30)/03 Type-A,B&E 20.04.05
29. 20/6/24 F24/6(20)/04 Type-A,B&E 03.05.05
30. 22/6/24 F24/6/22/04 Type-A,B&E 19.09.05
31. 23/7/24 F24/7/23 Type-A,B,D,E&F 09.11.04
32. 24/7/24 F24/7(24)/ Type-A,B,D,E&F 16.08.04 Platform from
Govt. land
demolished and
property sealed on
23.11.05
33. 232/7/24 F24/7(232)/05 Type-I 22.12.05
34. 151/8/24 F24/8(151)/03 Type-B,E&F 10.07.03 Encroachment on
public land
removed and GF &
SF sealed
35. 152/8/24 F24/8(152)/03 -do- -Do-
36. 138/9/24 F24/9(138)/97 Type-B,C&E 12.06.36
37. 25/11/24 F24/11(25)/98 Type-B&D 19.06.03
38. 123/11/24 F24/11(123)/98 Type-B 14.01.00 Property sealed on
23.12.00
39. 10/11/24 F24/11(10)/01 Type-B,D&E 12.06.03 Platform from
Govt. land removed
and premises sealed
on 28.01.04
40. 100/11/24 F24/11(100)/02 Type-B&E 13.02.03 Premises sealed on
30.01.04
41. 02/12/24 F24/12(02)/04 Type-B,E&F 09.11.04
42. 03/12/24 F24/12(03)/04 -do- -do-
43. 07/12/24 F24/12(07)/03 Type-A,B,D,E&F 24.08.04
44. 08/12/24 F24/12(08)/03 -do- -do-
45. 81/12/24 F24/12(81)/03 Type-A,B,E&F 24.08.04 Partly demolished
and sealed on
11.07.05
46. 82/12/24 F24/12(82)/03 -do- -do- -do-
47. 85/12/24 F24/12(85)/03 Type-A,B,D,E&F 30.08.04
48. 86/12/24 F24/12(86)/03 -do- -do-
NOTE: A – Steps/Platform/Cupboard/Staircase on Govt. land (Outside plot line) at G.F.
B – Roof Projections in front/rear/sides outside plot line at roof level (in air).
C – Construction over Roof Projection.
D – Construction without sanction of building plan.
E – Excess Coverage
F – Amalgamation of two plots.
G – Third floor constructed.
H – Basement constructed.
I – B-1 not applied.
LIST OF VIOLATION IN PROPERITIES (PLOT SIZE 26-SQM TO 90-SQM IN ROHINI AREA) IN WHICH S.D.
ORDERS PASSED (Sector-1D,23)
DT. OF
S.no.. PROPERTY FILE NO. UNAUTHORISED S.D. / REMARKS
Pt. / Pkt./
Sector CONSTRUCTION
No. ORDERS
290-----D-----
1 -1 FS1/00[290]D/92 TYPE -B 05/09/2000 Ist floor sealed on 25.4.01
25-4-2001
441 ----D ---
2 -1 FS1/00[441]/D-1 TYPE- E&H. 10 -4-92. Roof Projection demolished on 25.4.01 3 82----D---1 FS1/00[082]/D-1. A,E&F. 30-7-91./ Shops sealed at G.F. on 25.04.01
25-4-2001.
4 171---D---1. Fs2[330]86. Type -A ,B ,&E. 5-10 -2000.
Type -A ,B,C
5 403 -D --1. FS1/00[403]D/91. &E. 27-8-96. Shops sealed at G.F. ON 25.04.01
6 171--D---1. FS2[330]86. Type-E. 23-8-2000 Programme fixed on 23.09.05, 18.11.05, 13.01.06.
Force not
23-10-2000 available.
8 141---D--1. FS1/00[141]D96 Type -A,&E. 19-12-05
9 168---D--1. FS!/00[168]D91 Type -A,BC&E.
10 166--D--1. FS01/00[166]D92 Type A,E 19-12-05
11 46--D--1 FS!1/00[46]D001 Type -A ,B,E 22-3-05 Programme fixed on 20.12.05, Force not
05/06/2005 available, re-fixed on 20.02.06.
12 404--D--1 FS1/00[404]/D87 Type -A,B,D,F. 05/05/2005 Shutters at G.F. re
05/05/2005 moved, heavy
public resistance
13 405- D 1 FS1/00/[405]/D88 DO DO on 25-10-05.
14 218---D--1 FS01/00[218]2003 Type- A,B,D,E&G. 12-9-03. Programme fixed on 20.02.06.
Programme fixed on 18.11.05 and 13.01.06.
15 30--D--1 FS1[841]86/D Type- A,B,D&E. 6-9-05. Force not available.
Force not
12/02/2005 available.
Plateform
16 241-8-23. F323/8[241]99 Type A,B&E. 07/01/2002 demolished
07/11/2002 property sealed on
24-2-03
Details of unauthorized construction in Pocket E-1 to E-5, Sector-7, Rohini
S. File No. Property Details of unauthorized Date of S.D. order S.D. order Remarks No construction SCN date Implemen
tation date 1. F.304(07)06/Bldg. 7-E-1-Sect.7 1. FSB more than 11.9.02 23.8.03 24.11.05 Partly demolished
permissible
2. Shutter fixed at G.F.
2. F.304(15)98/Bldg 4-E-1-Sect.7 -do- 23.9.02 10.6.03 9.10.05 -do- 3. F.304(4)02/Bldg 67-E-4-Sect.7 -do- 30.9.02 4.9.03 31.5.05 -do-
4. F.304(31)03/Bldg 38-E-4-Sect.7 -do- 9.7.04 9.12.04 - Yet to be implemented 5. F.304(32)03/Bldg 37-E-4-Sect.7 -do- 9.7.04 9.12.04 - -do- 6. F.304(08)04/Bldg 131-E-4-Sect.7 1. RSB covered. 18.11.03 -do- - -do-
2. FSB partly covered
3. FAR more than
permissible
7. F.304(12)04/Bldg 123-E-4-Sect.7 -do- 18.11.04 6.2.06 - -do-
-
8. F.304(17)04/Bldg 62-E-4-Sect.7 -do- 14.12.04 1.4.05 20.11.05 Partly demolished 9. F.304(04)04/Bldg 3-E-5-Sect.7 -do- 4.10.04 21.10.05 - Yet to be implemented
Details of unauthorized construction in Pocket E, Sector-1, Rohini
S. File No. Property Details of unauthorized Date of S.D. order S.D. order Remarks No construction SCN date Implementatio
n date
1. F.298(02)01/Bldg. 41Pkt.E-Sect.1 1. RSB covered. 22.5.03 23.7.03 Yet to be Deferred on 20.12.05
2. FSB partly covered implemented
3. FAR more than
permissible
Details of unauthorized construction in Pocket H-3, Sector-18, Rohini
S. File No. Property Details of unauthorized Date of S.D. order S.D. order Remarks No construction SCN date Implementati
on date
1. F.315(15)03/Bldg. 51, Pkt.H-3, Constructed more than 18.9.03 1.3.04 23.11.05 Sealed due to lock, hence
Sect.18 sanctioned deferred
Details of unauthorized construction in Pocket 2, Sector-A-10, Narela
S. File No. Property Details of unauthorized Date of S.D. order S.D. order Remarks No construction SCN date Implementation SHIVALIK BLOCK-A date
1. F.338(03)99/Bldg. 40, Pkt.2,Sect.A-10 1. RSB covered. 5.8.02 12.4.04 - Yet to be implemented DETAILS OF UNAUTHORISED 2. FSB partly covered
3. FAR more than CONSTRUCTION permissible Name of locality
S.No. Property Detail No. File No. Date of Details of Un-authorised constn. S/D Order Remarks/Action
Inspection Date pending
1 2 3 4 5 6 7
1. A-100 F318(23)91/Bldgd. 29.8.01 SF Constructed without sanction 18.4.02 For implementation of
and not permitted S.D. orders letter
issued on 6.05.02,
21.11.02, 31.9.03,
15.4.04, 28.5.04,
22.6.04 frist & S.F.
locked. 22.4.04
one both room/toilet
& one room scaled of
Ist & IInd floor C/L issued
of on 4.3.05
& 7.6.05 no response.
2. A-184 F.318(01)96/Bldg. 16.07.02 (i) Infrigment in RSB 5.9.03 Toilet sealed
(ii) Excess coverage at GF/FF at FF & SF
on 9.1.05
SHIVALIK BLOCK-B
DETAILS OF UNAUTHORISED CONSTRUCTION Name of locality
S.No. Property Detail No. File No. Date of Details of Un-authorised constn. S/D Order Remarks/Action
Inspection Date pending
1 2 3 4 5 6 7
1. B-47 F.318(52)92/Bldgs. 20.02.02 (i) Infriqment in RSB 13.8.03 Program fixed
(ii) U/A construction SF on 17.2.04 no
(iii) Excess coverage of all floors implemented due to
(iv) Partition exist in Basement Not available of force
On 22.5.04 shortage
of time.
Letter received for
regularisation.
2. B-138 F.318(579)91/Bldg. 29.12.2000 (i) U/A illegal encroachmetment on 25.6.02 letter submitted
rear service road by constructing for regularsion on
raising con bldg. line changed 8.2.01
and rear side
(ii) SF constructed u/A
(iii) Infrigment on R&B at Basement
GF, FF
3. B-168 F.318(02)96/Bldg. 04.1.01 & (i) U/A const. carried out in SF 13.12.01 Programme of
18.1.01 which is not sanctioned nor SD order not
permissble in structure on date. implemented
(ii) Side projection on road side 25.6.03, 17.2.04 (iii) Infgrgment in RSB
28.5.04, 22.7.04 &
4.1.05 due to
not available
of force.
SHIVALIK BLOCK-C
DETAILS OF UNAUTHORISED CONSTRUCTION Name of locality
S.No. Property Detail No. File No. Date of Details of Un-authorised constn. S/D Order Remarks/Action
Inspection Date pending
1 2 3 4 5 6 7
1. C-5 F318(25)92/Bldgd. 28.11.01 (i) Infrgment in FSB
17.4.02 (ii) Infregment in RSB 18.4.02
(iii) Excess coverage at all floor
MANDAKINI
DETAILS OF UNAUTHORISED CONSTRUCTION
Name of locality
S.No. Property Detail No. File No. Date of Details of Un-authorised constn. S/D Order Remarks/Action
Inspection Date pending
1 1. F324(02)2003/Bldgd. 20.6.03 (i) Besment more than sanction 21.6.04
(ii) Front side wall received.
(iii) SF constructed more than
sanction.
(iv) TF/ UA servant qutr.
(v) Construction without B-1
2. 29 F324(05)96/Bldgs. (i) Constructed TF U/A which is not 6.5.97 permissible at all.
3. 62 F324(01)95/Bldg. 09.01.04 (i) TF constrcted U/A 21.6.04 (ii)An atena provided to
terrace without permission
from the authority
(iii) The basement areas is more
than sanctioned & permissble area.
KAILASH HILL
DETAILS OF UNAUTHORISED CONSTRUCTION
Name of locality
S.No. Property Detail No. File No. Date of Details of Un-authorised constn. S/D Order Remarks/Action
Inspection Date pending
1. 223 F280(7)85/Bldg. – (i) TF was constructed 18.10.96 Revised SCN issued
(ii) SF Fully covered on 12.12.03 Hearing on
8.1.04
2. 250 F280(16)87/Bldgs. 14.2.02
LIST OF VIOLATION IN CO-OPERATIVE GROUP HOUSING SOCIETIES AT PASCHIM VIHAR & VIKASPURI
GENERAL NOTES
1. Although sufficient care has been taken in compilation of the record on the basis of availabvale information, in case of any clarification/discrepancy, the office of Director
(Bldg.), DDA, C-I Flirst Floor, Vikas Sadan, INA, New Delhi may please be contacted.
2. The list of properties where Sealing-cum-Demolition Orders have been passed after issuing Show Cause notice under DD Act 1957 is as under : LIST OF SOCIETES (CGHS) PASCHIM VIHAR Where SEALING cum DEMOLITION ORDER Passed under DDACT 1957
S.NOFILE NO PROPTY DETAILS OF UN-AUTHORIZED CONSTN. DATE REMARKS.
. DETAIL OF S/D
ORDER
1 2 3 4 5 6
1. F23(3)79/Bldg. Delhi Rail i) Room constructed/Verandah 21/08/01 Partly demolished on02.05.2002. Karamchari CGHS, covered/Balcony covered in flat nos.-
Ashoka Enclave 1,311,7,33,29,21,25,13,17,16,20,24,10,28,14,Peeragrahi Paschim 18,22,26,15,23,27,39,48,41,45,59,65,69,79,78Vihar 80,60,53,50,47,88,81,82,87,96,91,95,106,104,
103,101,105,111,128,131,139,138,152,153,
158,155,170,193,180,184,173,177,181,185,
175,179,187,178,182.
ii) Parapet wall extended-flat No.4.
iii) Window Extension in Flat No:-
31,36,48,51,53,47,84,88,82,86,90,98,
110,103,118,127,124,139,126,143,153,154,
145,169,172,171,165,162,194,190,196,195,
198,200,60,68.
2. F23(15)77/Bldg CCIE Employees a)Verandah walls at GF constructed without 14/07/98
CGHS A-4, Paschim sanction in Flat Nos.
Vihar 9,11,17,19,35,37,41,43,45,47,49,53,55,57,59,
61,63,65,67,73,77,79,81,85,87,89,91,93,95,97
,99,105
b)Extra rooms/Verandah covered with AC
sheet are constructed without sanction on all
the terrace floors. Flat Nos.
52,54,56,58,60,62,64,66,68.
3. F23(10)80/Bldg GASTA CGHS i)Compound wall constructed unauthorized in 17/9/01, S.D.Orders executed on 28.5.02
Paschim Vihar front of flats at GF - partly.
1A,1B,2A,3A,3B,4B,5A,5B,6B,8A,8B,9A,9B
,13A,15A,16A,16B,18A,18B,19B,20B,21A,2
1B,22B,25A,7A,7B,10A,10B,24A,24B,26A,2
6B,12A,19A, 19B,18A,17A,17B&3D
ii)Balcony covered by the Flat owners of
upper floor i.e. 2E, 2B,4F, 9D, 13-C-D-E-F,
14A&14B
iii) Verandah covered at GF 15A,15B,15C.
iv)Balcony covered 16F, 22F, 25A-B-E,
5A&5F, 6A,6F,7A,10A, 10B,11A,11F,12B-
C-D, 19A&B,18A,B,E & 17E.
iv)Room constructed at terrace
22E,3D,9E,9F,&20F
4. F23(37)78/Bldg Backward Class i) Extra Rooms balconies constructed without 24/4/92
CGHS Ltd. Rohtak sanction in whole society of approximately at
Road Paschim Vihar each floor.
Compound wall constructed/extended :- 24/1/02
Block X:
G1,G2,G3,G6,G8,G10,G11,G14,G17,G7
Block Z:
G13,G16,G2,G3,G5,G6,G7,G10,G11,G12and
G18.
Block
Y:G15,G14,G11,G10,G7,G6,G3,G24,G23,G20,G18,G17&G16
BlockC:G1,G2,G3,G4,G6,G7,G10,G11,G12,G14,G15,G16.
Block A: G11G13,G15,G18,G1(platform extended)G3,G7,G8,G9,G10.
Block B:
G15,G14,G10,G7,G6,G5,G24,G23,G22,G21,G20,G19,G18
Block Y: G15, construction was in progressed during inspection on 10.11.2000
LIST OF SOCIETIES (CGHS) -VIKAS PURI where SEALING cum DEMOLITION ORDER Passed under DDACT 1957
S.NO FILE NO PROPTY DETAILS OF UN-AUTHORIZED CONSTN. DATE OF REMARKS.
DETAIL S/D ORDER 1 2 3 4 5 6 1. F23(15)97/BldCENTRAL GOVT. i)Room constructed on terrace floor in flat Nos. 7.3.97 Partly implemented on 7.7.97
g SERVICES CGHS 109,270,164,213,221,225,271,276,501,532,617,67
(VIKAS KUNJ) VIKAS 8,693,694,695,732,774,868,869,1035,1079=21 flat
PURI NEW DELHI. nos.
ii)Balcony projected on Govt. Land of flats no.-
109,178,277,295,296,297,420,440,441,492,493,52
3,525,556,557,600,602,679,1046,1163,1170,1171
=22 Nos.
iii)Room constructed at GF rear side including i/c
Ver. Covd. In flat nos.
216,237,254,746,1161
i)Room constructed at GF,FF,IInd Floor, IIIrd
Floor only, Flat Nos.:-
121,131,137,164,176,181,182,205,208,210,226,2208.08.02
7,240,246,242,107,257,271,272,200,202,199,260,2
25,287,288,289,316,329,323,341,
346,361,356,371,275,398,396,405,407,408,419,43
0,436,439,440,449,451,466,472,475,483,484,479,4
93,494,497,498,501,499,436,437,496,422,403,505,
442,443,491,490,479,485,523,527,534,550,560,55
9,568,569,539,562,532,569,571,573,591,592,601,6
23,642,656,659,660,661,732,729,740,670,680,678,
676,677,698,
693,705,702,700,716,715,726,731,740,743,744,74
6,753,750,751,777,790,794,816,777(GF),827,828,
833,843,851,882,890,947,943,946,945969,1030,10
15,995,1047,1058,1055,1042,1082,1083,1124,114
6,1151,1172,1162,1163,1173,1118,1116,1117,113
1,222,112,237,238,305,130,217,143,184,353,358,9
41,752,680,717
ii) Balcony extended and covered in front, Rear & side.
Flat Nos.-
104,106,107,108,109,116,118,120,126,127,132,139,140,144,145,146,147,150,156,163,164,165,168,171,180,179,180(R),181,185,189,190,205,203,202,
208,213,218,229,230,231,232,235,238,239,246,247,266,265,263,268,270,276,288,289,296,297,201,203,306,312,315,317,318,320,339,338,335,340,362,372,378,381,390,401,402,405,(R/F),411,409,414,416(f),420(FF II
floor),426,428,431,432,433,434,435,438,440,441,
447,452,450,453,456,459,463,468,471,480,483,482,492,493,501,497,416?,421,422,404,504,505,507,526,525,531,534,(Ist & II floor),540,549(Ist,
IInd0,,548,547,556,561,560,555,559,,567(Ist, IInd),591,593,597,598,602,603,611,614,607,624,623,609(Ist&
IInd),632,638,645,647,655,665,688,694?,697,683,684,695,712,703,700,708,706,718,719,730,731,732,733,755,754,766,768,767,769,775,774,777,778,780,781,786,796,799,798,797,802,822,810,817,821,822823,826,828,838,853,851,866,867,868,871,875,876,877,878,855,857,858,889,888,887,886,947,94
9,953,954,965,966,960,955,956,968,969,981,979,978,977,976,974,975,1002,998,987,989,990,1013,1012,1017,1026,1048,1049,1059,1051,1057,1058,1040,1087,1090,1098,1099,1100,1123,1126,1127,1129,1132,1133,1134,1149,1145,1146,1147,1150,1
151,1152,1153,,1156,1157,1158,1159,1162,1163,1170,1171,1172,1174,1117,1116,1112,1111,918,626,930,935,942,919,923,927,931,935(R),,917,921,929,933,937,941,920,932,936,892,896,908,900,916,904,901,909,913,906,910,914,911,895,891,892,896,900(side),904(side),895(side),911(side)
iii) Boundary wall constructed in front, rear and side.
101,107,112,116,117,124,125,130,131,136,137,142,143,148,149,155,166,172,166,176,184,185,188,197,204,210,211,216,217,222,223,230,231,236,237,242,243,247,249,254,255,260,275,286,287,293,29
8,299,304,305,310,311,322,323,328,329,323,340,346,347,352,353,358,359,364,365,370,371,376,377,382,383,388,393(F/S/R),394,389,400(R/F),406(F/R),407,412(F/R),414,418,419,424,425,430,431(F/R/S),461,466(F/R/S),473,472,467(F/R/S),473(F/R),478,479,484,485,490,491,496,508,521,526,527,53
2,533,550(F/R/S),556,557,562,551,563,568,577,583,588,589,594(F/R),595(F/R),600,601(F/R/S),612,613,618,619(F/R/S),624,509,436,437,442,443,449(F/R/S),454,455,460,625,630,631,636,637,642,648,649,654,660,661,666(Back
side),655(B/side),672,673,711,710,681,687,686,692,693,698,692(ide),704,705,699,711,716,718,717,722,723,730,734,735,746,747,752,758,764,765,770,771,783,788,789,800,801,806,794,807,812,813,818,819,824,825,830,776,831,837,843,866,867,882,890,950,947,944,943,955,963,964,975,978,970,97
4,991,983,990,999,1078,1071,1006,998,1014,1030,1015,1022,1227,1031,1038,1023,1039,1046,1047,1054,1055,1062,1063,1070,1082,1083,1091,1093,1100,1101,1106,1107,1119,1124,1125,1130,1131,1136,1148,1143,1149,1154,1155,1160,1161,1168,1172,1173,1178,1113,1118
iv) Lobby extended in front of kitchen :-
939,940,931,932,927,928,923,937,938,929,930,904,908,911,916,896,
v)Extra Balcony extended towards shaft:-
942,910
vi) Room constructed at GF,FF, IInd Floor, IIIrd floor in internal open courtyard:-
112,237,236,205,130,217,143,184,353,358,941,752,680,717,
vii)fencing of Green trees on open area:-
515,520,545,557,713,712,795,842,979,1079,1084,1095,1001,
viii) Cup Board extended :-
226,227,342,341,382,523,516,
2. F23(04)80/BldKangra Adarsh CGHS at Unauthorised and illegal developments :- 12.12.97 S.D. Order not implemented in compliance
g. Vikaspuri i) compound wall constructed U/A by the owner of of Court orderAsper court order the society
the flat no.- is yet to submit plans for regularization
311,313,309,363,365,373,381,239,233,245, duly approved by the society G.B.M. 247,249,261,199,201,181,205,177,209,187, 191
ii)Rear side commons portion covered U/A with
the help of A.C. sheets by the owner of the flat
nos. – 245,247,251,253,255,261,191,101,103,105,
107,109,249
iii) Room/store constructed U/A in rear side by the
flat owners of flat nos. 219,309, iv) Room constructed U/A at the terrace by the owners of flat nos. 356, 358, 352, 156, 174,386,372,388,394,396,392,244,216,342, 344,150,154,136,142,334,332,170,158,190, 330,308,300,180,302,
3 F23(100)86/BlAntariksha CGHS Ltd. i) Flat No. 09, Balcony extended. Flat No. 48 31.07.98
dg. constructed balcony Unauthorizedly
open Verandha extended :- Flat No. 107 & 118.
Flat No. 76- store room constructed.
Flat No. 174- balcony covered
Flat No. 146-Verandha covered in shape of room.
Flat No. 168 covered the shaft.
i) Flat No. 61-shop is running in the flat
ii) Flat No. 23,87,96,160,162&167-covered 05.03.99 verandah/balcony with steel and grills
iii) flat no. 129- constructed room in the open
space at joining the staircase
4 F23(122)84/BlOrdnance CGHS Ltd.
dg. Bodella Vikas Puri
i) Rear balcony of flat no. A-3,A-5,A-61. ii) Additional area in room by shifting of main inner wall of flat no. A-11, A-26, A-8 & A-9. iii) Constructing of additional toilet in flat no. A- 43. 02.01.02 iv) Encroachment on society land :- (a) 2 steps in front of flat no. A-11 (b) Kitchen garden by encroachment in set back area by flat no. A-11, A-
26, A-27, A-28, A-41, A-42, A-44, A-74, A-73, B-
26, B-17.(c) Room extended with toilet in front
side and rear courtyard covered by flat no. C-9, C-
14, C-15, C-16.
5 F23(22)83/BldJupiter CGHS Ltd. at i) Two room constructed in north setback 7.8.00
g. Vikas Puri ii) Room constructed at terrace area in flat No. 102
& 82
iii) Compound wall constructed at GF in flat no.
33.
iv) Room extended in flat no. 29,39,53,83 & 93 at
GF.
v) two extra DUs constructed without sanction in
place of children play area under stilt and flat no.
131 & 132.
LIST OF VIOLATION IN RESIDENTIAL PROPERTIES AT DWARKA SECTOR-11, MIANWALI & GUJRAWALA PH.III
GENERAL NOTES
1. Although sufficient care has been taken in compilation of the record on the basis of availabvale information, in case of any clarification/discrepancy, the office of Director
(Bldg.), DDA, C-I Flirst Floor, Vikas Sadan, INA, New Delhi may please be contacted.
2. The list of properties where Sealing-cum-Demolition Orders have been passed after issuing Show Cause notice under DD Act 1957 is as under :
DETAIL OF UNAUTHORISED CONSTRUCTION
NAME OF LOCALITY : SECTOR – 11, DWARKA
S.No. File No. Property Date of Details of Un-S/D Order Remarks/Action Pending
Detail Inspection authorised Const. Date
1 2 3 4 5 6 7
1. F331 (05) 2001/Bldg. Plot No. 53 22-11-02 One urinal constn. 24-6-04 Letter sent to DD (L.M.) on 19-2-
in rear. set back 04 for implementation for S/D order
one urinal constn.
in front set back.
DETAIL OF UNAUTHORISED CONSTRUCTION
NAME OF LOCALITY : MIANWALI CHBS ROHTAK ROAD, DELHI
S.No. File No. Property Detail Date of Details of Un-authorised S/D Order Remarks/Action Pending
Inspection Const. Date
1 2 3 4 5 6 7 1 267(20)90/Bldg. B-1/24 Mianwali 23-7-99 Barsati floor constructed 4-4-2000 Property sealed on
unauthorized. 29-5-2000
Infringement on public Reminder No. 3 dt. 17-1-06
land in front & side set issued to appear in P.H.
back.
. R.S.B. on G.F. covered
2. F267(508) 89/Bldg. RR-11 Mianwali 24-9-01 on F.F. pt. Rear setback. 10-1-02 A letter was also issued for
covered fresh applying of sanction on
On S.F. pt rear setback 25-2-03, 26-4-03, 9-7-03 &
covered 11-12-03
Partition wall removed on Reply is awaited of owner
G.F. Additional sanction issued 2-
9-2004
DETAIL OF UNAUTHORISED CONSTRUCTION
NAME OF LOCALITY : Mianwali CHBS, Rohtak Road
S.No. File No. Property Date of Details of Un-authorised S/D Remarks/Action Pending
Detail Inspection Const. Order
Date
1 2 3 4 5 6 7 nd3 F267(21) 86/Bldg. B-1/13 25-11-99 Constructed 2 floor area more 24-3-3 Letter sent on 30-4-2003 to DDLM
than permissible Rear set back for implementation nd has been covered at 2 floor nd Front Balcony at 2 floor
extended more than
permissible.
Full basement constructed
without sanction. 4 F267(511) 93/Bldg. B-1/19 5-1-2000 23-1-2 Last letter issued on 31-1-2002 to
Instant plans not get regularized DDLM implementation
and peripheral charges not
deposited till date Infringement in F.S.B. is more than 0.30 mtr. which is 5 F267(08)86 B-5/5 14-12-99 24-12-3 Last letter issued 24-2-2003 to measured 0.90 mtr. owner has DDLM implementation constructed toilet in the rear open area and covered the R.S.B. The building plan was sanctioned for G.F.+F.F.+S.F.+(Pt) but constructed the S.F. complete
I.C.Y. covered by making per
gola
DETAIL OF UNAUTHORISED CONSTRUCTION
NAME OF LOCALITY : Mianwali CHBS, Rohtak Road
S.No. File No. Property Date of Details of Un-authorised Const. S/D Order Remarks/Action Pending
Detail Inspection Date
1 2 3 4 5 6 7
6 F267(518) 92 N.S. 17 11-11-01 On G.F. Rear set back is covered 27-5-02 Letter sent to DDLM for
implementation on 5-1-2002 In front two shops are running and on Letter sent to DDLM for one side dryclean shop is running implementation on 30-1-2 Property was de sealed vide
order no. 2015 dt. 24-11-2000
Owner didn’t complete the Toilet constructed is R.S.B. at G.F.,
rectification 7 F267(402) 84 B-1/8 28-8-99 F.F. & S.F. constructed 21-6-2000
Reminder No. 2 to DDLM on unauthorisedly
27-11-02 for implementation
Interal court yard to be rectified as
8 F267(17)2001 AB-12 4-4-01 per sanctioned plan 20-7-01
DETAIL OF UNAUTHORISED CONSTRUCTION
NAME OF LOCALITY : Mianwali CHBS, Rohtak Road
S.No. File No. Property Date of Details of Un-authorised Const. S/D Order Remarks/Action Pending
Detail Inspection Date
1 2 3 4 5 6 7 9 F267(532) 97/Pt R.R. – 13 12-5-2000 Building has not completed as per 4-6-01 Letter sent to DDLM on
sanctioned 13-6-2001 for implementation
Constructed toilet in R.S.F. G.F., for S/D order
S.F. , F.F. AND T.F.
Steps in FSB for basement
Commercial activities was going on
Misuse of garage portion
10 F267(03) 98 N.S.R. 18 16-11-98 Compound wall removed full 17-1-02 Letter sent to DDLM for
basement opened below GF implementation for S/D order
coverage rd 3 floor more than sanctioned
Shops constructed at GF
Infringement RSB at GF +
FF+SF+TF
DETAIL OF UNAUTHORISED CONSTRUCTION
NAME OF LOCALITY : Mianwali CHBS, Rohtak Road
S.No. File No. Property Date of Details of Un-authorised Const. S/D Order Remarks/Action Pending
Detail Inspection Date
1 2 3 4 5 6 7 11 F267(515) 89 A-7/23 25-2-93 Basement constructed in front set 23-1-02 SD order sent to DDLM on 31-1-
back and side wall 2002 for implementation
Direct entry for basement
Side wall + FSB+RSB+ compound
wall has not been completed/excess
coverage of public land area
Coverage is more than permissible
limit.
DETAIL OF UNAUTHORISED CONSTRUCTION
NAME OF LOCALITY : Mianwali CHBS, Rohtak Road
S.No. File No. Property Date of Details of Un-authorised Const. S/D Remarks/Action Pending
Detail Inspection Order
Date
1 2 3 4 5 6 7 12 F267(591) 93/Bldg. B-1/19 Full basement covered without 23-1-02 Letter sent to DDLM on
sanctioned 31-1-2002 for implementation
Instant plans not get regularized
& peripheral charge not deposited
till now
DETAIL OF UNAUTHORISED CONSTRUCTION
NAME OF LOCALITY : Mianwali CHBS, Rohtak Road
S.No. File No. Property Date of Details of Un-authorised S/D Order Remarks/Action Pending
Detail Inspection Const. Date
1 2 3 4 5 6 7
13 F267(17) 85/Bldg. C-1/10 24-12-04 Const. is not as per sanctioned 23-1-02 Documents submitted on
building plan 2-9-05 Case under process
Infringement in RSB & FSB Stop constructed notice issued
and Mezz. extended in FSB on 7-8-2002
Competent authority
Toilet consted. in RSB regularized the existing const.
Convey letter issued to
Area constructed of is more deposit prior to sanction
than the permissible limit DDL change & documents on dt.
11-10-2002, 28-2-2003, 22-4-
Construction done without 2003, 9-7-2003,
sanctioned 15-6-2004, 2-11-04
Reply is still awaited
Year 2003-2004 DETAIL OF UNAUTHORISED CONSTRUCTION
Name of Locality : Gujrawallan, Phase-III
S.No. File No. Property Date of Details of Un-authorised construction Date of Remarks/Action Pending
Detail Inspection S/D Order
1. 2. 3. 4. 5. 6. 7. 1. 326(03)97/B 267 27.6.2003 Covered rear set back at basement G.F. Vide No. Implementation of S.D. Order deferred as the owner has
Gujrawallan & F.F. 140 dt. requested to submit the regularization plan.
Phase III 21/6/04 16.10/2003
08/01/2004 Date of
25/03/2004 Hearing
Reminder-I for submitting regularization plan
Reminder I dt. 16.3.05
Reminder II dt. 12/05/05
Reminder III dt. 22/8./05
2. 326(03) 233 04.08.2003 Basement, Ground Floor, First Floor, Vide No. Implementation of S.D. Order deferred as the owner has
2002/B Constructed more than sanctioned plan. 139 dt. requested to submit the regularization plan.
Gujrawallan 21/6/04 11.09.2003
Phase III 20.10.2003
27.11.2003 Date of
08.01.2004 Hearing
11.03.2004
Convey letter dated
3.11.2004,
Reminder I dated 17.03.2005
Reminder II dt. 17.09.2005
Reminder III dt. 17.12.2005
Year 2003-2004 DETAIL OF UNAUTHORISED CONSTRUCTION
Name of Locality : Gujrawallan, Phase-III
S.No. File No. Property Date of Details of Un-authorised construction Date of Remarks/Action Pending
Detail Inspection S/D Order
1. 2. 3. 4. 5. 6 7
3. 326(07)/01/B 229 20.02.2003 Basement constructed more than 6/10/03 Property is sealed w.e.f. 17.3.2005
Gujrawallan sanctioned plan.
Phase III
4. 326(10)01/B 252 31.7.2003 Excess coverage at Basement, Ground Vide No. Report as per demolition diary set back construction nd Gujrawallan Floor, First Floor and Second Floor 187 dt. punctured, but 2 floor construction yet to be regularized for
Phase III constructed unauthorisedly 19/7/04 which various reminders have been issued but regularization
plan not submitted by owner w.e.f. 19.1.2005.
本文档为【LIST OF UNAUTHORISED PROPERTIES 9PLOT SIZE 26 :未经授权的性质9plot大小为26的列表】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。