首页 趣味运动会活动流程

趣味运动会活动流程

举报
开通vip

趣味运动会活动流程趣味运动会活动流程 护理学院学生分会 体育部 the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: fi...

趣味运动会活动流程
趣味运动会活动流程 护理学院学生分会 体育部 the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note 主题: “团结伙伴”素质扩展比赛 目的: 丰富同学们的课余文化生活,增强各院系学生的团结协作能力,培养同学努力拼搏,勇敢向前,坚忍不拔的精神。 活动具体流程: 第一步:着手策划 2011年2月28日,我护理系体育部接到校团委、学生社团联合会文体部关于举办西安医学院第四届“团结伙伴”素质拓展训练比赛的通知,立即召开了相关会议,将比赛的内容、要求传达给我体育部各位干事,并研讨了相关准备工作,活动策划及组织。 第二步:开展报名活动 我体育部干事明确活动详情后,立即拟定了策划书,并深入到我系各班级,传达此项活动,并开始参赛者报名。期间,各班同学都能够踊跃报名,体现了相当高的热情。 第三步:选拔参赛选手 报名工作结束后,我体育部立刻按照策划,展开了参赛人员的选拔。面对将近300多名报名同学,我体育部为了在选拔the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note 中体现出公平、公正的原则,制定了合理的选拔 计划 项目进度计划表范例计划下载计划下载计划下载课程教学计划下载 ,并成功的选出了一批优秀的运动员。 第四步:进行训练 参赛选手确定以后,我体育部立刻展开了刻苦的训练。在训练期间,多数选手都能够服从我体育部的安排,每天坚持早起参加训练,体现出了我系学生的吃苦精神。 第五步:活动预演 为了熟悉比赛时的入场顺序,3月17日下午6点在校体育场,学校举行了入场预演。此次预演,我系的纪律维持、队伍组织主要由大一干事负责,他们也体现出了优秀的组织能力。 第六步:后勤准备 为了能够让选手顺利参加比赛,我部设想了多种突发状况,并做了相应准备。比如为选手准备药品,水等物品,力保活动的顺利进行。 第七步:参加比赛 3月23日下午,趣味运动会在校体育场正式开始。经过一周的训练,我系运动员都激情万分,在赛场上也能努力拼搏,表现出了良好的精神面貌。期间,我部干事还组织了拉拉队为参赛运动员呐喊助威。经过“同舟共济”、“趣味袋鼠跳往返接力”、“团结一致”、“拔河比赛”四项比赛,下午5点多比赛正the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note 式结束。 第八步:比赛总结 比赛结束后,我部就此次比赛做了相关讨论和总结。此次会议,我部对新干事的工作能力、干事之间的团结协作能力给予了肯定,对多数运动员能够踊跃报名,积极参加训练亦给予肯定。会议中也提出了一些不足之处,希望各干事在今后的工作中能够引起重视,并加以改正。 护理学院学生分会 体育部 2011年3月27日 the first level to consider when positioning security, roughly the same distance between the point and level to put the stand, can't be moved, dislocation, and so on. Pay attention to the proper use and care of leveling. (6) level: find the anchor position after take levels, in anchor horizontal, horizontal lines with fine steel wire cable, while tightly tightening, ensure the wire level. (7) measurement errors: in horizontal line after the measure on the face. Mainly for horizontal measurement, also check the axis (axis positioning) q errors. By measuring the results of analyzing the cause of error, check the relevant specification (construction) requirements for error values, within the specified error, digestible errors exceeded error shall be settled through consultation with civil party or party. (8) to adjust the error: ... (3) familiar with their location and adjacent location, check the accuracy of segment size. (4) attention to handling errors, strengthen coordination with civil engineering work. (5) check the embedded location is accurate, solid reinforcement. 7. Security, protection: (1) enter the construction site personnel must wear safety helmets, safety belts, shirtless, wearing slippers, slippery-soled shoes is not allowed to enter the site. (2) must be carried out according to the specifications of construction, attention to the safe use of electricity. (3) Note
本文档为【趣味运动会活动流程】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_686908
暂无简介~
格式:doc
大小:23KB
软件:Word
页数:6
分类:企业经营
上传时间:2017-08-30
浏览量:456