首页 合唱比赛策划书

合唱比赛策划书

举报
开通vip

合唱比赛策划书合唱比赛策划书 “唱响青春” 第五届大合唱比赛 主办:学工处 承办:校学生会 办公室 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting ...

合唱比赛策划书
合唱比赛策划书 “唱响青春” 第五届大合唱比赛 主办:学工处 承办:校学生会 办公室 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) 一、活动主题: 唱响青春 二、活动目的, 为了丰富同学们课余文化生活,展现当代大学生风采,弘扬校园文化。校团委学生会特在“青春?梦想?奋斗”第三届五四青年文化节里举办“唱响青春”第五届大合唱比赛,通过本次比赛引导大学生树立团结协作意识,展示当代大学生文明健康、积极向上的精神风貌。 三、活动宣传, 1、比赛前期,本阶段是比赛的准备阶段,主要以写真海报宣传、展板宣传、条幅宣传为主。结合网络宣传和广播宣传的形式在校内进行大规模的宣传。 2、比赛后期,本阶段是赛后 总结 初级经济法重点总结下载党员个人总结TXt高中句型全总结.doc高中句型全总结.doc理论力学知识点总结pdf 阶段。请新闻部门对各学院参赛选手进行赛后采访和文字报道,在学校网站发布新闻稿,力求提升大合唱比赛的后期影响力。 四、活动形式和参赛人员组成, 1、面向群体,以学院为单位的全体在校生。 2、比赛形式, ,1,本次大赛分为初赛、决赛两部分。 ,2,初赛由各学院自发组织进行选拔。,选拔方式不限, ,3,决赛由各学院学生会推选出一个代 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf 队参加比赛。 五、比赛要求, 1、合唱比赛以学院为单位进行组队。 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) 2、每支参赛队伍由45-50人组成(包括指挥、伴奏)。 3、每支队伍准备两首歌曲,一首为指定红歌,从附附表五中选择,,一 首为自选歌曲,自选的歌曲必须紧扣主题,积极向上,演唱时间及上 下场时间不超过12分钟。 4、每队需配一名指挥,形式以合唱为主,可以配备朗诵、领唱人员。 5、学校提供音响设备,允许使用乐队伴奏,所需乐器自备,。 6、演唱中允许有队形变换。 7、各参赛队需统一穿着装 。 8、比赛顺序由抽签的结果决定,不参加抽签者视为弃权。 9、歌曲评分采用十分制,分五项进行评分。 10、参赛队及其现场观众需保持赛场纪律。如有违反纪律的情况发生,视情节对相应代表队的最终成绩扣分,比赛结束会由现场察组根据参赛队及其学院观众的现场秩序进行打分,最终评比出团体文明奖一名。 11、当一支队伍进行演唱时,其抽签顺序之后的两支队伍必须到指定地点做准备。 12、比赛最终评出一名最佳指挥奖,但其得分不计入总分。 六、比赛时间,5月29号 七、比赛地点,图书馆 报告 软件系统测试报告下载sgs报告如何下载关于路面塌陷情况报告535n,sgs报告怎么下载竣工报告下载 厅 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) 八、奖项设置, 集体奖, 一等奖1名 二等奖1名 三等奖1名 团体文明奖1名 团体奖奖品均为锦旗。 专项奖, 优秀指挥奖1名 奖品,荣誉证书和U盘。 十一、决赛流程,见附表一 十二、决赛评分表,见附表二 十三、评分准则,见附表三 十四、资金预算,见附表四 学工处 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) 校学生会 办公室 二〇一三年5月29日 附表一 第五届大合唱比赛流程 一、时间:2013年5月29日 下午:18:30 二、地点:图书馆报告厅 三、具体流程: 1. 播放大赛宣传视频 (18:30―18:35) 2. 主持人致开幕词 (18:35―18:38) 3. 主持人介绍比赛规则和评分细则 (18:38―18:40) 4. 比赛开始各学院代表队按顺序登场演唱 (18:41―20:04) 5. 有奖知识竞答 (20:04―20:14) 6. 主持人宣布获奖名单及成绩并进行颁奖仪式 (20:15―20:20) 7. 主持人宣布比赛结束。 (20::20) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) 附表二 ,比赛评分表, 第五届“唱响青春”大合唱比赛评分表(满分10分) 代表队: 号 项目 得分 队伍整齐性 (2分) 精神面貌与演唱气势 (2分) 音准节奏 (1分) 整体合作效果 (3分) 创新 (2分) 指挥表现(不计入总分) (5分) 以上分数统一取小数点后两位,指挥表现分数为评选优秀指挥奖,备注 不计入总分。 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) 附表三, 评分细则, 第五届“唱响青春”大合唱比赛评分 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 本次合唱比赛总评分为10分,去掉一个最高分,去掉一个最低分,取平均分保留两位小数,例9.25,。若分数相同看第三位小数。评分标准如下, 一、进场出场迅速有序,注重礼节,演唱时队形整齐,选曲紧扣主题,参赛人数符合规定,演出时间不超时。(2分) 二、服装整齐统一,整体精神面貌良好。台风端正,展现学生良好风貌,有多声部合唱等技巧性处理,声部均衡和谐。演唱声音响亮,有气势。(2分) 三、节奏合拍,音色优美,吐字清晰,音乐完整,作品处理得当,富有感染力。(1分) 四、合唱队演唱与指挥、伴奏之间配合默契,指挥效果良好。(3分) 五、形式新颖,具有队形变换创新,观众气氛热烈。(2分) 六、未按大赛要求准时参加比赛的演出队,视为自动弃权,记零分。 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) 参赛队最后得分为,去掉最高分、去掉最低分,各评委打分相加后的 总分除以有效评委人数,结果精确到小数点后四位。,主持人报分到小数 点后两位, 注,优秀指挥的评选取各评委打分相加后的总分除以总的评委人数。 附表五, 《红星闪闪》 《爱我中华》 《精忠报国》 《站起来》 《歌唱祖国》 《当那一天来临》 《领航中国》 《在希望的田野上》 《长江之歌》 《我的中国心》 《龙的传人》 《五星红旗》 《红旗飘飘》 《爱我中华》 《国家》 《黄河大合唱》 《明天会更好》 《我们走在大路上》 《红梅赞》 《十送红军》 《中国中国 鲜红的太阳永不落》 《听妈妈讲那过去的故事》 《为了谁》 《祝福祖国》 《五月的鲜花》 《我爱你中国》 《祝酒歌》 《走进新时代》《春天里的故事》《党啊,我亲爱的妈妈》《解放军军歌》 《草原上升起不落的太阳》 《东方红》 《好日子》 《同一首歌》 《在太行山上》 《没有共产党就没有新中国》 《南泥湾》 《弹起我心爱的土琵琶》 《松花江上》 《保卫黄河》 《我的中国心》 《中国人》《团结就是力量》 《红军不怕远征难》 and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm) and performance test copies of the record. If necessary, review should be carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... Tube wall thickness (mm) 2-3 4-6 7-10 weld form no slope mouth weld strengthening height h (mm) 1-1.5 1.5-2 weld width b (mm) 5-6 7-6 has slope mouth weld strengthening height h (mm) 1.5-2 2 weld width b (mm) cover had each edge slope mouth about 2 mm argon arc welding weld strengthening surface height and width tube wall thickness (mm) 2--3 3--4 5--6 weld form weld strengthening height h (mm) 1-1 .5 1.5-2 2-2.5 width b (mm)
本文档为【合唱比赛策划书】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_281650
暂无简介~
格式:doc
大小:51KB
软件:Word
页数:0
分类:
上传时间:2018-07-30
浏览量:6