首页 喷砂指导书

喷砂指导书

举报
开通vip

喷砂指导书 STEP N° 步骤 PHASE DESCRIPTION 阶段描述 10 Turn on the button 旋开按钮 Turn on the black button as marked in the picture. 旋开图示标出的黑色按钮。 20 Pushing 压紧 Loosening 松开 Open the door by loosening the red-marked area as shown in the picture. 松...

喷砂指导书
STEP N° 步骤 PHASE DESCRIPTION 阶段描述 10 Turn on the button 旋开按钮 Turn on the black button as marked in the picture. 旋开图示标出的黑色按钮。 20 Pushing 压紧 Loosening 松开 Open the door by loosening the red-marked area as shown in the picture. 松开图示红色区域来打开门。 Put the part in the sand blast machine. 待喷砂的零件放入喷砂机中。 Close the door by pushing the red-marked area as shown in the picture. 按压图示红色区域来关上门。 30 Insert two hands into two holes of the sand blast machine,put on the gloves attached to the machine,and bring pressure on the red-marked area,then start sand blasting. 双手放入喷砂机的两个孔中,戴上喷砂机附带的手套,施加压力于图示红色区域,开始喷砂。 40 Uneven 不均匀 Good 好 Part after sand blasting. 喷砂完成后的零件。 Remark:Please use quartz sand when do sand blasting for part of stainless steel,and carborundum for carbon steel. 备注:不锈钢零件喷砂时用石英砂,碳钢用金刚砂。     Rev. 版本 Date 日期 Revision history 变更履历 Edited by 编写 Verified by 确认 Approved by 批准 01 22/05/2014 Created document 02 10/09/2014 Step 40 changed       The doc. originator fill below distribution list 文件编写部门确定分发部门 QM Approval质量经理批准 □ GM总经理 □ Finance&Accounting财务 □ HR&Admin人事行政 ■ Technical技术 □ Purchasing&Supplying采购 □ Planning 计划 项目进度计划表范例计划下载计划下载计划下载课程教学计划下载 □ Logistic物流 □ Warehouse仓库 □ Quality质量 ■ Production生产 □ Assembly装配 □ Sales&Marketing销售 □ Project Management项目管理 □ Others其他              
本文档为【喷砂指导书】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_196623
暂无简介~
格式:doc
大小:48KB
软件:Word
页数:0
分类:生产制造
上传时间:2019-08-13
浏览量:0