首页 2014装修报价明细表

2014装修报价明细表

举报
开通vip

2014装修报价明细表2014装修报价明细表 辉煌?南艺 报价明细表 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heav...

2014装修报价明细表
2014装修报价明细表 辉煌?南艺 报价明细表 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and the 辉煌南艺装修报价明细表 客户姓名: 联系电话: 设 计 师: 地 址: 户型面积: 工艺标准: 工序单单价项目名称 程合计 工艺做法 材料说明 号 位 (元) 量 一 客厅 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平1 顶面乳胶漆 22 12 为免费调色,每加一色每“多乐士净味”。 米 种颜色另加130元调色 费。 顶面基层处平益士家腻子粉找平,打磨2 22 16 理 米 平整. 1、轻钢龙骨、“泰山” 石膏板。2、饰面基层处顶面造型吊30.泰山牌石膏板,“多乐3 米 95 理、刷乳漆及灯具、石膏顶 04 士”。 线另计。4、按外轮廓面 积计算。 墙面基层处平益士家腻子粉找平,打磨4 21 16 理 米 平整. 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平16.5 墙面乳胶漆 12 为免费调色,每加一色每“多乐士净味”。 米 44 种颜色另加130元调色 费。 平4.56 墙面壁纸 10 贴壁纸 壁纸甲供 米 6 石膏板拉缝,油漆刷漆处7 电视背景墙 项 1 1800 理。 清油。环保机拼大芯板或鑫利大芯板;多乐士木8 鞋柜 项 1 1500 多层板做基层,饰面板,器漆。五金件甲供 油漆刷漆处理。 小计: 二 餐厅 2遍乳胶面漆;全部房间平1 顶面乳胶漆 7.7 12 乳胶漆双色(不含白色)“多乐士净味”。 米 为免费调色,每加一色每construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and the 种颜色另加130元调色 费。 1、轻钢龙骨、“泰山” 21.石膏板。2、饰面基层处泰山牌石膏板,“多乐2 顶面吊顶 米 95 64 理、刷乳漆及灯具、石膏士”。 线另计。 顶面基层处平益士家腻子粉找平,打磨3 7.7 16 理 米 平整. 墙面基层处平15.益士家腻子粉找平,打磨4 16 理 米 24 平整. 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平15.5 墙面乳胶漆 12 为免费调色,每加一色每“多乐士净味”。 米 24 种颜色另加130元调色 费。 平12.6 酒柜 260 米 51 混油。环保机拼大芯板或鑫利大芯板;多乐士木7 暖气罩 项 1 300 多层板做基层,奥松板饰器漆。 面,油漆喷漆处理。 小计: 三 主卧室 顶面基层处平13.益士家腻子粉找平,打磨1 16 理 米 4 平整. 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平13.2 顶面乳胶漆 12 为免费调色,每加一色每“多乐士净味”。 米 4 种颜色另加130元调色 费。 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平12.3 墙面乳胶漆 12 为免费调色,每加一色每“多乐士净味”。 米 4 种颜色另加130元调色 费。 墙面基层处平23.益士家腻子粉找平,打磨4 16 理 米 6 平整. 平11.5 墙面壁纸 10 贴壁纸 壁纸甲供 米 2 1、轻钢龙骨、“泰山” 平1.3石膏板。2、饰面基层处泰山牌石膏板,“多乐6 进门吊顶 160 米 6 理、刷乳漆及灯具、石膏士”。 线另计。 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and the 混油。环保机拼大芯板或平4.3鑫利大芯板;多乐士木7 无门衣柜 480 多层板做基层,奥松板饰米 2 器漆。五金件甲供 面,油漆喷漆处理。 混油。环保机拼大芯板或平鑫利大芯板;多乐士木8 吊柜 2.6 580 多层板做基层,奥松板饰米 器漆。五金件甲供 面,油漆喷漆处理。 14.9 石膏线 米 14 08 1床头背景 项 1 400 0 小计: 四 次卧一 混油。环保机拼大芯板或平3.9鑫利大芯板;多乐士木1 无门衣柜 480 多层板做基层,奥松板饰米 8 器漆。五金件甲供 面,油漆喷漆处理。 混油。环保机拼大芯板或平鑫利大芯板;多乐士木2 吊柜 2.7 580 多层板做基层,奥松板饰米 器漆。五金件甲供 面,油漆喷漆处理。 墙面基层处平28.益士家腻子粉找平,打磨3 16 理 米 5 平整. 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平28.4 墙面乳胶漆 12 为免费调色,每加一色每“多乐士净味”。 米 5 种颜色另加130元调色 费。 顶面基层处平益士家腻子粉找平,打磨5 9.7 16 理 米 平整. 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平6 顶面乳胶漆 9.7 12 为免费调色,每加一色每“多乐士净味”。 米 种颜色另加130元调色 费。 15.7 顶角线 米 14 48 小计: 五 次卧二 墙面基层处平32.益士家腻子粉找平,打磨1 16 理 米 44 平整. 2遍乳胶面漆;全部房间 平32.乳胶漆双色(不含白色)2 墙面乳胶漆 12 “多乐士净味”。 米 44 为免费调色,每加一色每 种颜色另加130元调色 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and the 费。 顶面基层处平11.益士家腻子粉找平,打磨3 16 理 米 3 平整. 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平11.4 顶面乳胶漆 12 为免费调色,每加一色每“多乐士净味”。 米 3 种颜色另加130元调色 费。 13.5 顶角线 米 14 5 小计: 六 厨房 平7.0高强度集成吊顶(国标1 吊顶 170 集成吊顶。 米 4 牌8毫米厚) 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平23.2 墙面乳胶漆 12 为免费调色,每加一色每“多乐士净味”。 米 92 种颜色另加130元调色 费。 墙面基层处平23.益士家腻子粉找平,打磨3 16 理 米 92 平整. 小计: 七 过道 1、轻钢龙骨、“泰山” 石膏板。2、饰面基层处平10.泰山牌石膏板,“多乐1 吊顶 160 理、刷乳漆及灯具、石膏方 92 士”。 线另计。4、按外轮廓面 积计算。 2遍乳胶面漆;全部房间 乳胶漆双色(不含白色)平12.2 乳胶漆 12 为免费调色,每加一色每“多乐士净味”。 米 1 种颜色另加130元调色 费。 顶面基层处平益士家腻子粉找平,打磨4 8.7 16 理 米 平整. 墙面基层处平15.益士家腻子粉找平,打磨5 16 理 米 59 平整. 小计: construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and the 八 卫生间 1 哑口套 米 6.2 170 实木复合套装 小计: 九 主卧卫生间 平2.1高强度集成吊顶(国标1 卫生间吊顶 170 集成吊顶。 米 2 牌8毫米厚) 小计: 十 卫生间 平高强度集成吊顶(国标 吊顶 4.2 170 集成吊顶。 方 牌8毫米厚) 小计: 十平包管子 2.4 220 一 方 小计: 十电路走线 项 1 0 二 小计: 十拆卸费 项 1 0 三 小计: 以上项目合计: 以下项目按实际发生加收管理费、不打折 十其他 四 零预收。水、电路施工按科技际发生量结算。 1、水路:明走PPR管65元/米;暗走(砖墙)PPR 管75元/米(混凝土墙)PPR管80元/米;移PVC下 排水65元/米;不含水龙头、阀门。 水、电路改2、电路; 1 项 1 0 造 (1)明管:A 强电18/米;B 弱电(电视、电话、 网络20元/米;音响线25元/米) (2)暗管:在此基础上另加(砖墙)8元/米,混凝 土墙12元/米。 1、安装普通浴缸;裙边式350元/个,无裙边式400 元/个(普通浴缸指800以下)2、按摩浴缸、豪华浴2 洁具安装费 缸550元/个。3、洁具安装;普通230/套。高档360/ 套。 工费(一居室150元;二居室250元;三居室350元;3 灯具安装费 项 1 350 四居室450元)。 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and the 超高空作业指在3m以上作业面作业。总造价且不4 高空作业费 项 1 0 低于600元。室外另计。 由施工地点运送到小区内物业指定地点(一居室80 平米以下收150元;二居室80—120平米收260元,三5 垃圾清运费 项 1 300 居室120—150平米收300元;四居室350元;别墅450 元)。 8%工程管6 项 1 0 工程造价的百分之八 理费 2%材料运7 项 1 0 工程造价的百分之二 输费 2%材料损8 项 1 0 工程造价的百分之二 耗费 3%远程施9 项 1 0 工程造价的百分之三 工 13%工程设项 1 0 工程造价的百分之三 0 计费 合计: 工程 总价: 预算书说明 1本预算书中不含水、电路改造和暖气改动费用,水、电路改造费用按实际发生量另算。 、 2工程进行至中期,增减项合计后实际金额低于 合同 劳动合同范本免费下载装修合同范本免费下载租赁合同免费下载房屋买卖合同下载劳务合同范本下载 额时,甲方需向乙方交纳差额的10%的变更、 损失费,用以支付乙方 的材料来回运费,损耗费及退货费用。增项不享受打折优惠。 3工程结算数量以实际发生量为准。 、 4 设计 领导形象设计圆作业设计ao工艺污水处理厂设计附属工程施工组织设计清扫机器人结构设计 师口头承诺客户的任何条件,必须在合同或报价单中注明。否则视为无效。 、 5本预算不含物业任何名目收费,物业费(如:物业管理费、垃圾清运费、装修物业押金等)、 由甲方支付。 6工程过半:木工把所有的门都挂上,门口线收好,吊顶骨架打好后做中期验收,交中期款。 、 8本报价不含税费 、 2、施工中如有漏报项目或增加项目,则按实际施工项目结算工程款。 3、主材配套工程,全额付款。 construction measure 1) during the rainy season to prevent settlement of formwork scaffolding during construction, loose; concrete pouring rain, slump in moderation decreases, new pouring concrete to cover with plastic sheeting; heavy rain opened pouring concrete is strictly prohibited. 2) keep drainage facilities clear of aggregates and construction site. Yuqian to dig drainage ditches, equipped with a sufficient number of submersible pumps and water pumps for maintenance, inspection, maintenance, ensure the equipment in good condition. 3) cement temporary facilities such as library, material should be higher than the outside elevation and feature waterproof and drainage facilities. 4) means of transport and security and to skid the rain equipment. 7.6 concrete construction quality control (1) raw materials and tie than design gravel material must for chemical nature and the physical properties experiment, meet requirements rear can using, cement shipped site Hou, on its volume security, and consistency, fine degrees, do directed analysis, the index qualified rear can using; on mixing and conservation water, with test mortar strength of method for test; aggregate by fine Orthopedic, and in the aggregate, points warehouse stacked, regularly detection its containing water rate. sand fine degrees module regularly check, if over provides of module 0.2 Shi, Are required to adjust the mix proportion of concrete. concrete mix design, according to material characteristics and construction of concrete requirements, according to design requirements to determine the strength and durability of cement, water/cement ratio is determined, in accordance with construction requirements, workability, slump, sand coarse aggregate size determines the rate, water consumption, and then using absolute volume method to calculate the quantity of sand construction mixture ratio. Concrete slump control in the context of design drawings, according to the minimum value in different parts. According to the different parts, with l~4-graded concrete, each pouring a same-grade concrete, according to the normative sample, a set of three specimens, in standard curing condition, measuring the compressive strength of 7d, 14d, 28D, and do a test recording, as information. (2) transport of concrete quality control horizontal transport mainly used concrete mixer truck transport. Concrete delivery process should shorten the transport time; stop bleeding and excessively reducing collapse; concrete free falling height is greater than 2m, setting the sliding tube feeding. (3) quality control of concrete in concrete pouring process, hierarchy, order, material thickness, vibrating strictly according to the requirements. Substandard concrete warehouses is strictly prohibited. When pouring concrete, is strictly prohibited in the cabin with water. Concrete suspension and the
本文档为【2014装修报价明细表】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_686908
暂无简介~
格式:doc
大小:73KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-09-20
浏览量:21