首页 上海东方泵业BH系列变频调速成套给水设备

上海东方泵业BH系列变频调速成套给水设备

举报
开通vip

上海东方泵业BH系列变频调速成套给水设备 lfy 指示标注 业务员手机:13817274221 1 BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net Flow scope:0~1080m3/h Head scope:0~238m Pressure scope:0~2.38MPa The power of control motor 200kw The adjusted pr...

上海东方泵业BH系列变频调速成套给水设备
lfy 指示标注 业务员手机:13817274221 1 BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net Flow scope:0~1080m3/h Head scope:0~238m Pressure scope:0~2.38MPa The power of control motor 200kw The adjusted precision of pressure: 0.0MPa Stable time of system::<30S Over-load capacity of system::110%,60s Voltage scope: 380 10% Ambient temperature:-10 -+40 ( ) Relative temperature of air::90%RH( ) Absolute altitude:<1000m 2Shake:<5.9m/s (0.6G) The place without corrosive and flammable air The place without sunshine The place without explosive danger The place without strong shake and the lean is 5 degree The place with waterproof and shockproof equipment and without vapor One Main technical index Two Operation condition Three. Structure Variable frequency constant voltage automatic water supply equipment: There is main pump unit, stable voltage pump unit, stable voltage pneumatic tank, variable frequency timing constant voltage water supply control panel, pressure sensor, liquid level controller, relative pipe and valve and so on. Variable frequency timing constant voltage water supply control panel: There is AC transducer, programmable controller, PID adjuster, peripheral equipment and protection circuit, pressure sensor, liquid level controller and so on. 2 BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net A M B N C , PID ( , ) PID ( ) ( ) (PIC) FOUR General principle Five. The installation of equipment 1 Open the box to check A.If the type of equipment in the package is identical with the ordered type. B.If the type of equipment in the nameplate is identical with the ordered type. C.If the documents in packing list are complete. D.If the fittings in packing list are complete. E.If there is damaged electric component in package. 2.The installation of control panel BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net A M B N C When the variable frequency timing constant voltage water supply system is in the automatic operating condition, the pressure sensor on the water supply pipe net collects its pressure data incessantly, and change it to normal electrical signal, then transport it to digital PID adjuster (there are two kinds, one is in the transducer, the other is out installed separately, and connected with transducer). When there is programmable controller in control panel, PLC controls the operation quantity of water pump according to the signal which transported by PID adjuster. When the required water is increased, and the pressure of pipe net is reduced(Measured value is lower than set value), PID adjuster increases the output frequency of transducer, and the revolving speed of water pump's motor is increased, if its speed up to the upper limit speed, the pressure of pipe net(measured value) is lower than the set pressure(set value), PID adjuster will give adding pump signal to programmable controller, and it will start the other water pump which is in stop condition; whereas, when the required water is reduced, and the pressure of pipe net is (Measured value is lower than set value) increased, PID adjuster decreases the output frequency of transducer, and the revolving speed of water pump's motor is reduced, if its speed down to the lower limit speed, the pressure of pipe net(measured value) is higher than the set pressure(set value), PID adjuster will give decreasing pump signal to programmable controller, and it will stop the other water pump which is in operation condition. After continual dynamic adjustment, the pressure of pipe net will keep constant. When there is little flow jockey pump in variable frequency timing constant voltage water supply system, it has three kinds of service. First is that main pump keeps variable frequency operation, jockey pump keeps power frequency operation: When the required water is less than the flow of jockey pump, main pump will stop, jockey pump will keep power frequency operation; When the required water is more than the flow of jockey pump, main pump will keep variable frequency operation, jockey pump will stop. Second is that main pump keeps power frequency operation, jockey pump keeps variable frequency operation: When the required water is less than the flow of jockey pump, main pump will stop, jockey pump will keep variable frequency operation; When the required water is more than the flow of jockey pump, main pump will keep variable frequency operation, jockey pump will stop. Third is that main pump keeps variable frequency operation, jockey pump keeps variable frequency operation: When the required water is less than the flow of jockey pump, main pump will stop, jockey pump will keep variable frequency operation; When the required water is more than the flow of jockey pump, main pump will keep variable frequency operation, jockey pump will stop. When there is stable voltage tank in variable frequency timing constant voltage water supply system, if the main pump and the little flow jockey pump are stop for losing water, the stable voltage tank can keep user's required water and supply the normal leakage of pipe net, to keep constant pressure. The time is determined by the valid cubage of the stable voltage tank. A.For heat emission and repair, it should keep a certain space between the control panel and wall or other things. Generally speaking, the back distance is 800mm from wall, the side distance is 500mm from wall. B.The control panel should be placed on the fixed baseplate. As the following drawing, the control panel is placed on the concrete baseplate, the height of 'M' is about 300mm, the length is as same as the 'B' length of the control panel, the width is as same as the 'C' width of the control panel; the depth of the middle cable tank is about 200mm, the length is as same as the 'B' length of the control panel, the width is about 170mm~300mm. C.The fixed baseplate of control panel also should have the special earthing device. 3 BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net 2 3 1 8 9 10 11 7 6 5 5 6 7 A , 4 30-50cm 10-30cm 4 Connection require and methods for inlet/outlet terminal of control panel Connection requirement: Terminal block pressure feedback terminal block of control panel level sensor terminal block of control panel water tank wall Discharge pipe lower dynamic point upper dynamic point BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net 2 3 1 8 9 10 11 7 6 5 no-negative pressure stable flow tank Transmissible pressure gauge connection drawing A of pressure sensor Transmissible pressure gauge connection drawing B of pressure sensor A Connection method A.Float level switch should be fixed in a proper position of cistern, detailed installing dimension refers to the left drawing. Any other things can not be in its radial scope, otherwise it will block and control its movement. The safe voltage on float level switch is Ac24v. B After fixing float level switch, we must assure that the height of water level should cover water pump impeller. If we require to assure fire fighting level, it should be higher or equal to the height when the float is reclinate. A.The installation of equipment should adopt self pumped water, every pump should adopt separate inlet pipe, the caliber can not be less than the inlet of pump; the inlet pipe should be smooth and vertical(the gradient should be down), no elbow, no bulge; the valve of inlet pipe should not use stop valve to avoid cavitation. If the equipment adopts self-suction, we should pay attention to keep margin of pump suction head. Every pump must set separate suction pipe, which needs shorter, the pipeline should not have bulge, generally, the caliber should be one grade bigger than the inlet caliber of pump. Pay attention to select high quality bottom valve, and water supply measures. B. When install pump, the weight of pipeline shouldn't be supported by pump, or else pump is easy to be damaged;C. The foot bolt should be screwed down when install it, avoid strong shake during operation;D. Before installation, we should clean the block, rags and so on in pipeline, cistern and suction tank of pump carefully.E. In order to prevent impurity enter into the pump and block flow passage to damage it, you should install a filter before inlet. F. After installation, it should be no attrition when move the pump's rotor with hand, or else it should be dismantled to check; G. Transmissible pressure gauge must install on the little shake and stable place of water supply main pipe, and should install elbow and valve between main pipe and pressure guage. H. Transmissible pressure gauge, pressure controller, electrical joint pressure gauge and so on should face the manager. I.When installation, we must consider the whole space for later repair. J.If require less shaking, it may add shock pad between water pump and steel tank baseplate. Inlet /outlet also can be connected by flexible rubber joint. K.Installation ambient should be same with above clauses. A.For control panel' power wire, we can adopt three phases and five wire(three phases wire, one earth wire, on neutral terminal), the flux should meet the power requirement. B.Pressure sensor and other signal wire must adopt split conductor shielded wire, insure to transmit signal. C.All kinds of power wire and signal wire must be separated, avoiding to cross signal. D.All kinds of wire had better be screened by steel pipe, and the earthing of pipe must be good. 2E.Level sensor signal wire should use three cores rubber cable or no less than 1.5mm of multi-strands copper wire, to insure insulation and Permanence. F.The earthing of control panel must be good(third earthing: the resistance is less than 10Ù, earth line's diameter is more than 1.6mm). G.When inlet of system adopts no-negative pressure stable flow tank, we can control water level by electrode torch (connection methods as followings). 3 1.The installation of pump unit 5 30-50cm 10-30cm 5 6 7 Instal lat ion sketch map of cistern's f loat level switch pressure feedback terminal block of control panel Overflow level BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net Dc24v 6 BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net Terminal No Connection end End terminal Number The definition of end terminal Main power Standby power n# motor Transmissible pressure gauge Float level switch Level electrode Pressure transmitter Pressure gauge of electrical joint Pressure controller Firefighting button Flow switch Control signal of fire fighting control center Movement feedback signal of fire fighting control center Malfunction feedback signal of fire fighting control center Low resistance High resistance Slippage end Slippage end Public end or low electrode Middle level electrode High level electrode Signal output+end Signal output-end DC24v positive pole DC24v cathode Indication hand lower indication hand Upper indication hand Public end Normally close joint Public end Normally open joint Public end Normally open joint Public end Normally open joint Normally close joint Public end Normally open joint Public end Normally open joint Output of three-phase AC Neutral terminal Output of three-phase AC Neutral terminal Terminal block of junction box Wire No 7 A B C A B C D . E . ! F J www.eastpump.com E-mail:eastpump@163.net 1 A B C D E le +1=1.1xle F G PID H , PID 1 2 A B C D E F PID 8 BH BH series of variable frequency timing water supply equipment 5. NOTE A.Control loop may still have dangerous voltage after main loop hasn't power. B.Before power is on again after power being failure, if require to check equipment again, we should cut off the input power of whole set. C.The transducer's temperature of variable control panel may be high, we should avoid to touch it. 6. Prohibition Six The debugging and use of equipment www.eastpump.com E-mail:eastpump@163.net 1.The debugging of equipment After finish the installation of water pump, control panel, all the pipe and valve fittings, may check it according to relating instruction. We may debug the equipment after check it. A.You only may install and debug the equipment by special person or under their guidance; B.You must read this manual and relating instruction about our product; C.Check if the connection is right carefully, especially the input and output wire; D.Tighten the terminal block of whole set again; E.Fill the cistern and water pump to check if there is leakage in water pump and pipeline. F.Open all the pumps' inlet valve, discharge all the air in pump body. After the pump is full of water, start pump by manual, To confirm if the revolving direction is right, operation is normal and connection of pipe is good, if there is problem, you Should check and adjust it. G.After that, you may adjust relative parameter to set pressure value. H.After set the pressure value, set the main function switch to automatic position, main pump will start automatically according to the set pressure. If the pressure is repeating increase and decrease, you should adjust the relative PID Parameter. I.If there is little flow jockey pump in the whole set, you should adjust the switching value between the little flow jockey Pump and the main pump. 2 Use and maintenance A.Adjust the pressure gauge periodically; B.Maintain water pump and motor periodically; C.Clean the equipment periodically; D.Check if there is leakage or damaged in pipe and valve periodically; E.Check if the bolt in control panel is loose, and electric component is damaged or not; F.User couldn't change the parameter of transducer and PID adjuster. If require to change, it should be carried out by Our technical person. A.Prohibit to dismantle the transducer which power is on. We must cut off power, and may touch the transducer until charging indicator light is off, or else it will hurt people badly. B.Don't try to connect any capacitor with the output of transducer. C.Don't use the bolt of shell or side plate for the grounding of transducer, it must connect with the special earthing device. D.Prohibit to check the terminal of transducer and control circuit with megohmmeter, this test should be executed by special technical person. E.Check if the load capacity of control panel is according with the motor power of water pump. Prohibit to use control Panel in over load condition. F.Water pump is prohibited to operate without water. G.Water pump is prohibited to operate in reverse direction for long time. H.Water pump is prohibited to operate in low head and large flow condition I. Water pump is prohibited to operate in cavitation condition. J.The pipe seal in inlet of water pump must be good. 9 BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net 1 2 3 1 2 1 2 3 1 2 1 2 3 1 2 3 1 2 3 PID 1 2 3 4 1 2 PID 1 2 3 1 2 3 4 5 1 2 3 4 5 1. 1. 1 2 1 2 1. 1. 1 2 1 2 10 BH BH series of variable frequency timing water supply equipment www.eastpump.com E-mail:eastpump@163.net www.eastpump.com E-mail:eastpump@163.net 7 MALFUNCTION REASON AND TROUBLESHOOTING Malfunction Reason Troubleshooting Operation is normal by manual control, while it isn't normal by automatic control 1.Float level switch is failure or damaged 2.The hardware of control loop is malfunction. 3The wire of control loop is malfunction. 1.Check the installation is right or not, then determine to replace it or not. 2.Check fusegear, work method select switch and so on. Transducer often has malfunction which result in alarm or stop 1.The supply voltage isn't stable; 2.Water pump or motor has malfunction; 3.The parameter of transducer is malfunction. 1.Check the malfunction of transducer, confirm its reason according to the transducer's manual and solve it; Transducer often has malfunction which result in alarm or stop 1.Water pump is over load; 2.The safety setting of thermal relay is small; 3.The thermal relay is damaged. 1.Reduce the aperture of pump's discharge valve; 2.Adjust the safety setting of thermal Relay; Water pump starts or stops frequently The transducer couldn't operate. 1.The hardware of control loop is malfunction; 2.The wire of control loop is malfunction. 1.Reset relative parameter; 2.Adjust relative parameter again. 1.Remove the malfunction of control loop; 2.Detail according to the resolvent of transducer's manual; Reset the parameter of transducer. Water pump couldn't discharge water 1.The valve of inlet and outlet isn't open, inlet pipeline and flow passage of impeller is blocked; 2.The inlet and outlet of pipe is blocked; 3.The revolving direction of motor isn't right or motor is short of phase. 4.There is air in pump chamber; 5.The suction head is too high 1.Start or replace valve again; 2.Dredge the pipeline; 3.Check the electrical supply; 4.Open the discharge valve and discharge bolt; Reduce the suction head of water pump. The hand of pressure gauge is shake strongly. Equipment can operate, but There isn't water or lacking water It can operate automatically, But couldn't rest 1.There is air in the water pump or pipe 1. Check valve is failure. 1.Pipeline is blocked; 2.The set value of pressure is too low. 1.The head and set pressure is close or set pressure is higher than head; The rest parameter hasn't adjusted well. 1.Repaire check valve or replace it. 1.Repaire check valve or replace it. 1.Dredge the pipeline; 2.Increase the pressure value. 1.Adjust head or reduce the set pressure; 2.Adjust rest parameter again. 1.The lower limit of transducer's frequency isn't proper; 2.The accelerating or decelerating time isn't Proper; 3.The PID adjust parameter isn't proper. The revolving direction of water pump is reverse after stop 11 BH BH series of variable frequency timing water supply equipment Ò³Ãæ 1 Ò³Ãæ 2 Ò³Ãæ 3 Ò³Ãæ 4 Ò³Ãæ 5 Ò³Ãæ 6 Ò³Ãæ 7 Ò³Ãæ 8 Ò³Ãæ 9 Ò³Ãæ 10 Ò³Ãæ 11 Ò³Ãæ 12 Ò³Ãæ 13
本文档为【上海东方泵业BH系列变频调速成套给水设备】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_738688
暂无简介~
格式:pdf
大小:6MB
软件:PDF阅读器
页数:12
分类:生产制造
上传时间:2010-04-23
浏览量:193