首页 申请普惠性幼儿园的报告(1)

申请普惠性幼儿园的报告(1)

举报
开通vip

申请普惠性幼儿园的报告(1)申请普惠性幼儿园的报告(1) 申请普惠性幼儿园的报告 ×××教育局: 根据国家省市有关文件精神,结合《×××普惠性幼儿园的管理办法》,我园对办园条件、保教质量、依法办园、行政管理、队伍建设等各项工作进行了认真地自查,现将自查情况予以报告: 一、基本情况 ×××幼儿园坐落在×××,后山有果园,有宽敞的户外场地,远离污染吵杂地段,环境优雅安静自然,阳光充足。占地面积近×××平方米,建筑面积×××平方米。户外活动场地×××平方米。 二、办园条件 1、园所安全。我园独立成园,园址安全,周边无危险、无污染(含空...

申请普惠性幼儿园的报告(1)
申请普惠性幼儿园的报告(1) 申请普惠性幼儿园的报告 ×××教育局: 根据国家省市有关文件精神,结合《×××普惠性幼儿园的管理办法》,我园对办园条件、保教质量、依法办园、行政管理、队伍建设等各项工作进行了认真地自查,现将自查情况予以报告: 一、基本情况 ×××幼儿园坐落在×××,后山有果园,有宽敞的户外场地,远离污染吵杂地段,环境优雅安静自然,阳光充足。占地面积近×××平方米,建筑面积×××平方米。户外活动场地×××平方米。 二、办园条件 1、园所安全。我园独立成园,园址安全,周边无危险、无污染(含空气、水源、噪音污染)、无各类安全隐患;教学、活动场所日光充足,符合幼儿特点及安全卫生要求,无危房,布局合理。 2、用房配置。活动室及与之配套的寝室、盥洗室、厕所等辅助用房,厨房符合卫生 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 要求。 3、户外场地。我园有充足的户外活动场地,园内绿树成荫,春暖花开,环境优美。在幼儿操场的四周还为幼儿开辟了种植园地。有适宜幼儿户外运动的体育器械、大型玩具。 4、设施设备。 1)园内有办公桌、资料柜、电话、录音机、电视机、冰箱、消毒柜、电脑等基本设备。 designate a person responsible for periodically repaired, if significant quality problems, whether it's design or construction reasons, are required at the first meeting to study and propose solutions; 5) post through re-examination on the basis to resolve all remaining issues, well prepared for formal acceptance. 9, officially accepted: 1) the letter of acceptance issued by the Chief Engineer, project manager, and submitted it to the construction completion data; 2) by the employer organization design, supervision and quality supervision stations, construction and other construction units work together to check the quality and acceptance of views put forward, assessed quality rating; 3) Unit checked and confirmed after the completion of works comply with the standards and requirements, issue a certificate of completion to the construction unit, construction and design, quality supervision station, the engineer, civil engineering and other units to sign the certificates of completion; 4) signed a final acceptance certificate and construction unit, and according to the contract provisions of settlement procedures, unless indicated in the contract by the contractor of the warranty work, economic and legal responsibilities of each party are able to remove; 5) get the files transfer and project procedures. 10 quality tracking, maintenance plan is an important part of our quality assurance system, the company sold products and installation works are carried out by the after-sales service obligations. In particular, we developed a departmental duties and quality guarantee measures, as follows: 1) visited customers and product usage information. 2) collect customer feedback, product information, customer reports, complaints. 3) based on customer comments and respond promptly to complaints, to the site to identify the cause analysis, engineering quality problems and fill in the data form. 4) record type, the location, cause, and complete solutions. 5) identify reasons to propose solutions and, 2)配备各类保教理论与实践书籍,并定期进行补充;有配套的教师用书、教学图片、录音带、光碟、幼儿操作教材和幼儿图书。 3)活动室内有实用、卫生、安全的教学设备,桌椅、教玩具齐备,以及必要的电教设备等。 4)每班玩具柜,毛巾、口杯每人一套。 5)寝室内有符合卫生安全要求的床铺设备,有较完备的生活和卫生用品,有防暑降温和防寒保暖设施。 6)盥洗室、厕所设施完善安全,符合幼儿的年龄特征。 三、 规范 编程规范下载gsp规范下载钢格栅规范下载警徽规范下载建设厅规范下载 办园、保证质量。 幼儿园成立了以园长为组长的幼儿园保教工作领导小组,坚持正确的办园方向,深入贯彻幼儿教育方针和幼教法规,坚持保教并重原则。幼儿园具有正确的办园宗旨、规划及年度实施 计划 项目进度计划表范例计划下载计划下载计划下载课程教学计划下载 ,有健全的组织机构,较完善的规章制度,各类人员职责明确,有考核措施。幼儿园狠抓队伍建设,注重幼儿教师和保育员政治业务学习,不断提高个人素质。 为了让每一个幼儿得到全面发展和可持续发展,我们主要抓了教师的以下工作。 1、在师德建设上,我们重点突出教职工师德学习,坚持定时集体学习与个人学习相结合。 2、我园还重视教师的培训工作,培训有计划,有措施。我园严格聘请幼儿教师,任教老师必须持有双证资历。 3、注重教学工作过程管理,坚持每月进行一次常规督导检查,designate a person responsible for periodically repaired, if significant quality problems, whether it's design or construction reasons, are required at the first meeting to study and propose solutions; 5) post through re-examination on the basis to resolve all remaining issues, well prepared for formal acceptance. 9, officially accepted: 1) the letter of acceptance issued by the Chief Engineer, project manager, and submitted it to the construction completion data; 2) by the employer organization design, supervision and quality supervision stations, construction and other construction units work together to check the quality and acceptance of views put forward, assessed quality rating; 3) Unit checked and confirmed after the completion of works comply with the standards and requirements, issue a certificate of completion to the construction unit, construction and design, quality supervision station, the engineer, civil engineering and other units to sign the certificates of completion; 4) signed a final acceptance certificate and construction unit, and according to the contract provisions of settlement procedures, unless indicated in the contract by the contractor of the warranty work, economic and legal responsibilities of each party are able to remove; 5) get the files transfer and project procedures. 10 quality tracking, maintenance plan is an important part of our quality assurance system, the company sold products and installation works are carried out by the after-sales service obligations. In particular, we developed a departmental duties and quality guarantee measures, as follows: 1) visited customers and product usage information. 2) collect customer feedback, product information, customer reports, complaints. 3) based on customer comments and respond promptly to complaints, to the site to identify the cause analysis, engineering quality problems and fill in the data form. 4) record type, the location, cause, and complete solutions. 5) identify reasons to propose solutions and, 及时汇总,并反馈给幼儿教师。 4、注重幼儿教学研究工作,坚持保、教结合,要求定期开展教研活动,互帮互学。 5、教职工做到了严格遵守上下班作息时何,按时到岗并做好课前准备工作。做到不迟到、不早退、不旷工。 6、幼儿的学习与发展,仅靠幼儿园单方面的努力是不够的,必须得到家庭、社会的支持、理解与配合,保持家园密切沟通,促进孩子的全面发展,我们建立了家园联系制度,设立了家长开放日,定期召开家长会,听取 意见 文理分科指导河道管理范围浙江建筑工程概算定额教材专家评审意见党员教师互相批评意见 和建议。 我园幼儿教师还做到了以下方面: l、科学组织幼儿一日活动,以游戏为主,引导幼儿主动学习,重视教育过程,教育手段现代化,杜绝“小学化”教学。 2、每周教学安排考虑到健康、语言、社会、科学、艺术等各领域的均衡。学习内容结合幼儿实际生活经验。教师在教学过程中关注到对幼儿情感、态度、能力、知识、技能等各方面的培养。 3、科学合理安排作息时间,开展适合幼儿年龄特点的户外游戏和体育活动。每天保证户外活动2小时,其中体育活动1小时。 4、坚持正面诱导,没有虐待、体罚和变相体罚等损害幼儿身心健康的行为。 四、安全卫生工作,有力度。 安全卫生工作常抓不懈是我们工作的一贯宗旨。安全卫生工作是幼儿园工作的重中之重、头等大事。 designate a person responsible for periodically repaired, if significant quality problems, whether it's design or construction reasons, are required at the first meeting to study and propose solutions; 5) post through re-examination on the basis to resolve all remaining issues, well prepared for formal acceptance. 9, officially accepted: 1) the letter of acceptance issued by the Chief Engineer, project manager, and submitted it to the construction completion data; 2) by the employer organization design, supervision and quality supervision stations, construction and other construction units work together to check the quality and acceptance of views put forward, assessed quality rating; 3) Unit checked and confirmed after the completion of works comply with the standards and requirements, issue a certificate of completion to the construction unit, construction and design, quality supervision station, the engineer, civil engineering and other units to sign the certificates of completion; 4) signed a final acceptance certificate and construction unit, and according to the contract provisions of settlement procedures, unless indicated in the contract by the contractor of the warranty work, economic and legal responsibilities of each party are able to remove; 5) get the files transfer and project procedures. 10 quality tracking, maintenance plan is an important part of our quality assurance system, the company sold products and installation works are carried out by the after-sales service obligations. In particular, we developed a departmental duties and quality guarantee measures, as follows: 1) visited customers and product usage information. 2) collect customer feedback, product information, customer reports, complaints. 3) based on customer comments and respond promptly to complaints, to the site to identify the cause analysis, engineering quality problems and fill in the data form. 4) record type, the location, cause, and complete solutions. 5) identify reasons to propose solutions and, 1、坚持常规安全教育,落实“开学安全教育第一课”。 2、重视家、园联系,定期开展家园活动。 3、落实目标管理责任制,签订目标管理责任书,提高教师安全管理责任意识。 4、坚持定期进行一次安全隐患排查工作,制定整改措施,建立整改台账,并落实专人负责。 5、坚持实行家长接送制度。 6、坚持自愿原则,组织家长参与保险,幼儿园也为每一位幼儿 购买了校方责任险。 7、严格执行卫生保健的法规、规章和制度,达到常规工作要求。 8、建立晨检、消毒、隔离等卫生保健制度和健康检查制度,定 期对幼儿和教职工进行体检,做好计划免疫和疾病预防工作。 五、后勤管理 1、伙食 管理制度 档案管理制度下载食品安全管理制度下载三类维修管理制度下载财务管理制度免费下载安全设施管理制度下载 严格,工作人员与幼儿的伙食严格分开,根据时令及幼儿特点,制订食谱。 2、严格财务制度,计划使用经费,做到专款专用。严格按规定收费,无乱收费行为,建立收费公示制度。 3、每年均添置了一定数量的保教设施、玩教具和办公设备等,不断改善办园条件。 六、发展规划 我园从新园建设、师资队伍建设、办学条件、园所布局等方面进行了认真细致的规划。 designate a person responsible for periodically repaired, if significant quality problems, whether it's design or construction reasons, are required at the first meeting to study and propose solutions; 5) post through re-examination on the basis to resolve all remaining issues, well prepared for formal acceptance. 9, officially accepted: 1) the letter of acceptance issued by the Chief Engineer, project manager, and submitted it to the construction completion data; 2) by the employer organization design, supervision and quality supervision stations, construction and other construction units work together to check the quality and acceptance of views put forward, assessed quality rating; 3) Unit checked and confirmed after the completion of works comply with the standards and requirements, issue a certificate of completion to the construction unit, construction and design, quality supervision station, the engineer, civil engineering and other units to sign the certificates of completion; 4) signed a final acceptance certificate and construction unit, and according to the contract provisions of settlement procedures, unless indicated in the contract by the contractor of the warranty work, economic and legal responsibilities of each party are able to remove; 5) get the files transfer and project procedures. 10 quality tracking, maintenance plan is an important part of our quality assurance system, the company sold products and installation works are carried out by the after-sales service obligations. In particular, we developed a departmental duties and quality guarantee measures, as follows: 1) visited customers and product usage information. 2) collect customer feedback, product information, customer reports, complaints. 3) based on customer comments and respond promptly to complaints, to the site to identify the cause analysis, engineering quality problems and fill in the data form. 4) record type, the location, cause, and complete solutions. 5) identify reasons to propose solutions and, 总之,我园设施齐全、安全,办园条件较好,幼儿活动场地宽松、 幼儿园管理规范,队伍建设落实,教育手段科学,幼儿素质能够得到 全面发展,是孩子们健康快乐成长的乐园。经学校自查,我园符合普 惠幼儿园的申报标准,特向上级有关部门申请予以评定。 年 月 日 designate a person responsible for periodically repaired, if significant quality problems, whether it's design or construction reasons, are required at the first meeting to study and propose solutions; 5) post through re-examination on the basis to resolve all remaining issues, well prepared for formal acceptance. 9, officially accepted: 1) the letter of acceptance issued by the Chief Engineer, project manager, and submitted it to the construction completion data; 2) by the employer organization design, supervision and quality supervision stations, construction and other construction units work together to check the quality and acceptance of views put forward, assessed quality rating; 3) Unit checked and confirmed after the completion of works comply with the standards and requirements, issue a certificate of completion to the construction unit, construction and design, quality supervision station, the engineer, civil engineering and other units to sign the certificates of completion; 4) signed a final acceptance certificate and construction unit, and according to the contract provisions of settlement procedures, unless indicated in the contract by the contractor of the warranty work, economic and legal responsibilities of each party are able to remove; 5) get the files transfer and project procedures. 10 quality tracking, maintenance plan is an important part of our quality assurance system, the company sold products and installation works are carried out by the after-sales service obligations. In particular, we developed a departmental duties and quality guarantee measures, as follows: 1) visited customers and product usage information. 2) collect customer feedback, product information, customer reports, complaints. 3) based on customer comments and respond promptly to complaints, to the site to identify the cause analysis, engineering quality problems and fill in the data form. 4) record type, the location, cause, and complete solutions. 5) identify reasons to propose solutions and,
本文档为【申请普惠性幼儿园的报告(1)】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_731942
暂无简介~
格式:doc
大小:35KB
软件:Word
页数:10
分类:生活休闲
上传时间:2017-09-18
浏览量:41