首页 教育科研课题申报表

教育科研课题申报表

举报
开通vip

教育科研课题申报表教育科研课题申报表 cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment...

教育科研课题申报表
教育科研课题申报 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made 资中县教育局教育科研立项项目 项目名称 课题负责人 承担单位 资中县教育局 年 月 日 cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made 项目名称 课题负责人 单位 职务职称 姓 名 性别 年龄 职务职称 工作单位 承担任务 参 加 研 究 者 ccordance with the requirements, and cannot concentrate too much, such as when the soil is poor,t in atrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried ounot someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the elecand superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the2any objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are struction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and othersoil wall changes at any time, if there are any large cracks had to stop conlayer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -by--anual excavation should be from the top down, layerthe table in accordance with the construction plan operations; M2 construction organization name project name the construction site construction requirements of security technical cards on -2-down (reference tables) 4-onstruction technology to give the lowthe next processes work; 10, the construction site . 4ork ccards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthw isclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to acceptsure de may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security discloersonnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptancting per, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operae job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladd1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hol-, dig deep each 500construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to digpile Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavationt, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; uipmenuction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety eqt name the construction site construction requirements of security technical cards on the table in accordance with the constr1 construction organization name projec- 2 cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made 课 题 论 证 (说明国内外同类课题研究的现状;研究的理论与实践意义;研究的基本内容;预计突破哪些难题) operations, acceptance or unqualified acceptance not made d outtoo much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carrie hould be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrateable s, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cu should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkwayse used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protert, yog of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift diseepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the cominwater ing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processsoil wlayer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residuby-ds on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer2 construction organization name project name the construction site construction requirements of security technical car-2-down (reference tables) 4-ams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low, tesafety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site ptanceed out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carriigh flts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m hthan hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 vo 1000mm wall once; Section one wall higher-re; Intervals the excavation hole pile on the required distance to dig, dig deep each 500rd, consistent with requirements to lower production; Excavation pile construction of excavation process must have special cad recoctive equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection an 3 cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made 主 要 参 考 文 献 文 献 名 称 作 者 出 处 研究周期 自 年 月起,至 年 月止完成有关研究任务 主 要 研 究 阶 段 阶 段 成 果 形 式 结题成果形式 ccordance with the requirements, and cannot concentrate too much, such as when the soil is poor,t in atrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried ounot someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the elecand superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to theany objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are struction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and othersoil wall changes at any time, if there are any large cracks had to stop conlayer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -by-anual excavation should be from the top down, layerthe table in accordance with the construction plan operations; M2 construction organization name project name the construction site construction requirements of security technical cards on -2-down (reference tables) 4-onstruction technology to give the lowork ccards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthw isclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to acceptsure de may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security discloersonnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptancting per, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operae job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladd1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hol-, dig deep each 500construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to digpile Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavationt, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; uipmenuction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety eqt name the construction site construction requirements of security technical cards on the table in accordance with the constr1 construction organization name projec-2-the next processes work; 10, the construction site . 4 4 cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made 课题组成员已承担研究课题 课 题 名 称 批准单位 批准时间 结题时间 课题组成员近期取得的与本课题有关的研究成果 作 者 成 果 名 称 发表、出版、交流情况 operations, acceptance or unqualified acceptance not made d outtoo much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carrie hould be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrateable s, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cu should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkwaysrt, yog of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift diseepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the cominwater ing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processsoil wlayer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -by-ds on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer2 construction organization name project name the construction site construction requirements of security technical car-2-down (reference tables) 4-ams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low, tesafety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site ptanceed out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carriigh flts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m hthan hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 vo 1000mm wall once; Section one wall higher-re; Intervals the excavation hole pile on the required distance to dig, dig deep each 500rd, consistent with requirements to lower production; Excavation pile construction of excavation process must have special cad recoctive equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection ane used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protecards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residu 5 cards on the table in accordance with the construction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety equipment, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavation pile construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to dig, dig deep each 500-1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hole job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladder, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operating personnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptance may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security disclosure disclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to accept cards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthwork construction technology to give the low-down (reference tables) 4-2-2 construction organization name project name the construction site construction requirements of security technical cards on the table in accordance with the construction plan operations; Manual excavation should be from the top down, layer-by-layer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when soil wall changes at any time, if there are any large cracks had to stop construction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and other objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are any unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical and not someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the electrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried out in accordance with the requirements, and cannot concentrate too much, such as when the soil is poor, shall assign a person in custody; Acceptance can be carried out operations, acceptance or unqualified acceptance not made 教研 组推 荐意 见 负责人(签字) 年 月 日 教科室初审评议意见 中学(中心学校)审查推荐意见 单位 推荐 意见 负责人(签字) 负责人(签字) 单位(盖章) 年 月 日 年 月 日 县教 育局 审批 意见 单位(盖章) 年 月 日 填表说明: 1、本表一式1份,一律用电脑打印,于每年3月底前报送县教研室。 2、每个课题限报负责人一名,课题负责人应是第一参加研究者。 3、填写中如栏目篇幅不够,可自行加页。 ccordance with the requirements, and cannot concentrate too much, such as when the soil is poor,t in atrical zero connection and leakage protection switch, cable should be in good condition and wear PPE; Slope, to be carried ounot someone, wheel, should be the formation of walkways, to remove barriers; Underwater operations to strictly check the elecand superior, no knocking or play with; Artificial lift dirt, you should review the tools, ropes, hook is solid, lifting vertical unidentifiable goods or prior did not foresee the coming of cables, pipes and so on, should stop operations, reporting to the-any objects above fall head injury, in the event of groundwater seepage, water well should be excluded; At the side, if there are struction, reporting to the project manager for processing; In the pit or deep in work, must wear a helmet, no dirt and othersoil wall changes at any time, if there are any large cracks had to stop conlayer excavation dig gods Earth is strictly prohibited, there should be adequate lighting at night; Deep Foundation pit when -bythe next processes work; 10, the construction site . 4-anual excavation should be from the top down, layerthe table in accordance with the construction plan operations; M2 construction organization name project name the construction site construction requirements of security technical cards on -2-down (reference tables) 4-onstruction technology to give the lowork ccards deliver the signature time Japan form in duplicate, teams from the deposit of an instrument, and filed a report. Earthw isclosure signatures; 11, targeted the construction site safety disclosure; 12, the other. Disclosure signatures to acceptsure de may be homework, not qualified for acceptance or acceptance not made the next processes work. Site specific security discloersonnel must be on the ground before they can be carried out after the pump power supply must be disconnected; 10, acceptancting per, into the hole after work or job, you must set 1.2m high fence around the hole and gaikongkou; Digging when pumping, operae job safety miner's lamp or the safety voltage of 12 volts; Lower personnel must wear helmets, seat belts, by the rigid ladd1000mm wall once; Section one wall higher than hole 250mm, required opening protection facilities; Lighting hol-, dig deep each 500construction of excavation process must have special care; Intervals the excavation hole pile on the required distance to digpile Every day must be in service for toxic gas detection and record, consistent with requirements to lower production; Excavationt, gas masks, accessories, materials and personal protective equipment must be checked before use, ensure the safety of use; uipmenuction plan operations; Digging holes, hoisting, Dado, residue used in transportation of all equipment, facilities, safety eqt name the construction site construction requirements of security technical cards on the table in accordance with the constr1 construction organization name projec-2 6
本文档为【教育科研课题申报表】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_447713
暂无简介~
格式:doc
大小:82KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-10-20
浏览量:18