首页 普通车床设备档案管理表格

普通车床设备档案管理表格

举报
开通vip

普通车床设备档案管理表格普通车床设备档案管理表格 档案编号: 广州市海均船舶配件制造有限公司 设备名称: 设备编号: 使用部门: 填写日期: indicate the direction of the arrow mark; a variety of emergency lights, emergency response time of not less than 45min. 5. protective grounding (1) electrical equipment for metal housings, meta...

普通车床设备档案管理表格
普通车床设备档案管理 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf 格 档案编号: 广州市海均船舶配件制造有限公司 设备名称: 设备编号: 使用部门: 填写日期: indicate the direction of the arrow mark; a variety of emergency lights, emergency response time of not less than 45min. 5. protective grounding (1) electrical equipment for metal housings, metal frame, metal wiring pipes and accessories, cable protection tubes, metal sheath of the cable, such as charged bare metal parts shall be grounded or neutral. (2) electrical equipment and fittings of dedicated ground wire should be singled out and grounding line or the zero connection protection line (network) connected to electrical wiring work in the zero line should not be used as protective earthing wire. (3) electrical equipment and earthing connection, use multiple soft stranded wire, their copper wire minimum area shall not be less than 4mm2, vulnerable to mechanical damage of parts should be installed in protection tubes. (4) electrical device for armored cable and ground or neutral wire should be connected to the equipment grounding bolts inside, steel and metal casing should be connected to the equipment grounding bolt. (5) grounding bolts should have a locking device or petty, before fastening the grounding line, on its ground terminal and ... Project organization. Project organization is composed of three layers: the core layer, management and operational level. 1. core layer: formed by the project manager, Assistant Project Manager, responsible for construction work, materials and equipment, management and coordination. 2. Management: engineering, technology, finance and budget 目录 (一)存档资料记录卡 ................................................................................... 3 (二)设备相关手册资料记录 ...................................................................... 4 (三)设备主要技术特性 .............................................................................. 5 (四)附属设备及计量仪表 .......................................................................... 6 22. Management: engineering, technology, finance and budgetmanager, Assistant Project Manager, responsible for construction work, materials and equipment, management and coordination. rojectct organization is composed of three layers: the core layer, management and operational level. 1. core layer: formed by the pve a locking device or petty, before fastening the grounding line, on its ground terminal and ... Project organization. Projeuld hat grounding bolts inside, steel and metal casing should be connected to the equipment grounding bolt. (5) grounding bolts shod in protection tubes. (4) electrical device for armored cable and ground or neutral wire should be connected to the equipmentallended wire, their copper wire minimum area shall not be less than 4mm2, vulnerable to mechanical damage of parts should be insline should not be used as protective earthing wire. (3) electrical equipment and earthing connection, use multiple soft stra zero be singled out and grounding line or the zero connection protection line (network) connected to electrical wiring work in thecharged bare metal parts shall be grounded or neutral. (2) electrical equipment and fittings of dedicated ground wire should ch asnt for metal housings, metal frame, metal wiring pipes and accessories, cable protection tubes, metal sheath of the cable, sua variety of emergency lights, emergency response time of not less than 45min. 5. protective grounding (1) electrical equipme indicate the direction of the arrow mark; (一)存档资料记录卡 设备名称 普通车床 设备价值 ,55000.00 规格型号 CA6150B/A 出厂编号 A41530026 设备用途 加工零件 制造厂商 沈阳机床 出厂日期 2015年 购置日期 2015年 投产日期 2014年 设备来源 采购 春季:SHELL VG46抗磨液压油 春季:美孚路宝85W-140齿轮油 液压油 润滑油 秋季:SHELL VG46抗磨液压油 秋季:美孚路宝85W-140齿轮油 3neering, technology, finance and budgetProject Manager, responsible for construction work, materials and equipment, management and coordination. 2. Management: engi stantomposed of three layers: the core layer, management and operational level. 1. core layer: formed by the project manager, Assior petty, before fastening the grounding line, on its ground terminal and ... Project organization. Project organization is c devicenside, steel and metal casing should be connected to the equipment grounding bolt. (5) grounding bolts should have a locking es. (4) electrical device for armored cable and ground or neutral wire should be connected to the equipment grounding bolts in tubpper wire minimum area shall not be less than 4mm2, vulnerable to mechanical damage of parts should be installed in protectioused as protective earthing wire. (3) electrical equipment and earthing connection, use multiple soft stranded wire, their co ot begrounding line or the zero connection protection line (network) connected to electrical wiring work in the zero line should nparts shall be grounded or neutral. (2) electrical equipment and fittings of dedicated ground wire should be singled out and metal ngs, metal frame, metal wiring pipes and accessories, cable protection tubes, metal sheath of the cable, such as charged bareency lights, emergency response time of not less than 45min. 5. protective grounding (1) electrical equipment for metal housiindicate the direction of the arrow mark; a variety of emerg (二)仪器设备相关资料存放记录 序号 名称 内容 财务内部控制制度的内容财务内部控制制度的内容人员招聘与配置的内容项目成本控制的内容消防安全演练内容 备注 1 装箱单 设备装箱清单 2 合格证 出厂合格证 机床操作注意事项及机床常见故3 机床操作须知 障的解决 方法 快递客服问题件处理详细方法山木方法pdf计算方法pdf华与华方法下载八字理论方法下载 4 电气说明书 数控车床使用说明书 5 机械说明书 数控立式转塔刀架使用说明书 6 使用说明书 卡盘使用说明书 42. Management: engineering, technology, finance and budgetmanager, Assistant Project Manager, responsible for construction work, materials and equipment, management and coordination. rojectct organization is composed of three layers: the core layer, management and operational level. 1. core layer: formed by the pve a locking device or petty, before fastening the grounding line, on its ground terminal and ... Project organization. Projeuld hat grounding bolts inside, steel and metal casing should be connected to the equipment grounding bolt. (5) grounding bolts shod in protection tubes. (4) electrical device for armored cable and ground or neutral wire should be connected to the equipmentallended wire, their copper wire minimum area shall not be less than 4mm2, vulnerable to mechanical damage of parts should be insline should not be used as protective earthing wire. (3) electrical equipment and earthing connection, use multiple soft stra zero be singled out and grounding line or the zero connection protection line (network) connected to electrical wiring work in thecharged bare metal parts shall be grounded or neutral. (2) electrical equipment and fittings of dedicated ground wire should ch asnt for metal housings, metal frame, metal wiring pipes and accessories, cable protection tubes, metal sheath of the cable, sua variety of emergency lights, emergency response time of not less than 45min. 5. protective grounding (1) electrical equipme indicate the direction of the arrow mark; (三)设备主要技术特性 CY-VMC850LD 设备名称 立式加工中心 型号 1.很高的静、动刚度及良好的抗振性能 2.良好的热稳定性 设备结构 3.较高的灵敏度 特点 4.高效化/高人性化操作 机床外形:3168mm×1037mm×1315mm 基本参数 机床重量:2290 kg (1)首先根据零件加工图样进行工艺分析,确定加工 方案 气瓶 现场处置方案 .pdf气瓶 现场处置方案 .doc见习基地管理方案.doc关于群访事件的化解方案建筑工地扬尘治理专项方案下载 、工艺参数和位移数据。 (2)用规定的程序代码和格式规则编写零件加 工程 路基工程安全技术交底工程项目施工成本控制工程量增项单年度零星工程技术标正投影法基本原理 序单;或用自动编程软件进行CAD/CAM工作,直接生成零件的加工程序文件。 (3)将加工程序的内容以代码形式完整记录在信息介质(如穿孔带或磁带)上。 (4)通过阅读机把信息介质上的代码转变为电信号,并输送给数控装置。由手工编写的程序, 工作原理 可以通过数控机床的操作面板输入程序;由编程软件生成的程序,通过计算机的串行通信接口直接传输到数控机床的数控单元(MCU) (5)数控装置将所接受的信号进行一系列处理后,再将处理结果以脉冲信号形式向伺服系统统发出执行的命令 (6)伺服系统接到执行的信息指令后,立即驱动车床进给机构严格按照指令的要求进行位移,使车床自动完成相应零件的加工 5neering, technology, finance and budgetProject Manager, responsible for construction work, materials and equipment, management and coordination. 2. Management: engi stantomposed of three layers: the core layer, management and operational level. 1. core layer: formed by the project manager, Assior petty, before fastening the grounding line, on its ground terminal and ... Project organization. Project organization is c devicenside, steel and metal casing should be connected to the equipment grounding bolt. (5) grounding bolts should have a locking es. (4) electrical device for armored cable and ground or neutral wire should be connected to the equipment grounding bolts in tubpper wire minimum area shall not be less than 4mm2, vulnerable to mechanical damage of parts should be installed in protectioused as protective earthing wire. (3) electrical equipment and earthing connection, use multiple soft stranded wire, their co ot begrounding line or the zero connection protection line (network) connected to electrical wiring work in the zero line should nparts shall be grounded or neutral. (2) electrical equipment and fittings of dedicated ground wire should be singled out and metal ngs, metal frame, metal wiring pipes and accessories, cable protection tubes, metal sheath of the cable, such as charged bareency lights, emergency response time of not less than 45min. 5. protective grounding (1) electrical equipment for metal housiindicate the direction of the arrow mark; a variety of emerg (四)附属设备及计量仪表 序号 名称 数量 用途 备注 1 螺丝刀 1件 装配/拆卸螺丝 2 轴用挡圈钳子 1件 装配/拆卸挡圈 3 方头螺钉扳手 1件 装配/拆卸螺钉 4 勾扳手 1件 装配/拆卸固定台 5 手推式油枪 1件 机械油用 卡盘工具 1件 装配/拆卸卡盘 62. Management: engineering, technology, finance and budgetmanager, Assistant Project Manager, responsible for construction work, materials and equipment, management and coordination. rojectct organization is composed of three layers: the core layer, management and operational level. 1. core layer: formed by the pve a locking device or petty, before fastening the grounding line, on its ground terminal and ... Project organization. Projeuld hat grounding bolts inside, steel and metal casing should be connected to the equipment grounding bolt. (5) grounding bolts shod in protection tubes. (4) electrical device for armored cable and ground or neutral wire should be connected to the equipmentallended wire, their copper wire minimum area shall not be less than 4mm2, vulnerable to mechanical damage of parts should be insline should not be used as protective earthing wire. (3) electrical equipment and earthing connection, use multiple soft stra zero be singled out and grounding line or the zero connection protection line (network) connected to electrical wiring work in thecharged bare metal parts shall be grounded or neutral. (2) electrical equipment and fittings of dedicated ground wire should ch asnt for metal housings, metal frame, metal wiring pipes and accessories, cable protection tubes, metal sheath of the cable, sua variety of emergency lights, emergency response time of not less than 45min. 5. protective grounding (1) electrical equipme indicate the direction of the arrow mark;
本文档为【普通车床设备档案管理表格】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_562397
暂无简介~
格式:doc
大小:31KB
软件:Word
页数:8
分类:生活休闲
上传时间:2017-09-18
浏览量:39