砖胎膜砌筑方案砖胎膜砌筑方案 昆钢科技大厦建设项目施工总承包工程 砖胎膜施工方案 编制人: 审核人: 审批人: 编制时间:2011年02月11日 中建三局建设工程股份有限公司 China Construction Third Engineer Burean Corp.,Ltd 昆钢科技大厦项目经理部 acidity, mL.; M--calibration of the molar concentration of sodium hydroxide standard solution, moI/L; V-...

砖胎膜砌筑方案
砖胎膜砌筑方案 昆钢科技大厦建设项目施工总承包工程 砖胎膜 施工方案 围墙砌筑施工方案免费下载道路清表施工方案下载双排脚手架施工方案脚手架专项施工方案专项施工方案脚手架 编制人: 审核人: 审批人: 编制时间:2011年02月11日 中建三局建设工程股份有限公司 China Construction Third Engineer Burean Corp.,Ltd 昆钢科技大厦项目经理部 acidity, mL.; M--calibration of the molar concentration of sodium hydroxide standard solution, moI/L; V--amount of the volume of sodium hydroxide standard solution, Ml; M--the weight of the sample, g. Such as poor meets the requirements, take the arithmetic mean of the second determination as a result. Results one decimal. 6, allowing differential analyst simultaneously or in quick succession for the second determination, the absolute value of the difference of the results. This value should be no more than 1.0. 1, definitions and principles for determination of ash in starches, starch and ash: starch samples of ash the residue obtained after weight. Original sample residue weight of sample weight or weight expressed as a percentage of the dry weight of the sample. Samples of ash at 900 ? high temperature until ashing sample ... The Crucible: determination of Platinum or other conditions of the affected material, capacity of 50mL. Dryer: has effectively adequate drying agent and-perforated metal plate or porcelain. Ashing furnaces: device for controlling and regulating temperature, offers 900 incineration temperature of 25 c. Analytical balance. Electric hot plate or Bunsen. 3, crucible of analysis steps preparation: Crucible must first wash with boiling dilute hydrochloric acid, then wash with a lot of water and then rinse with distilled water. Wash the Crucible within ashing furnace, heated at 900 to 25 ? 30min, and in the desiccator to cool to room temperature and then weighing, 昆钢科技大厦项目工程 目录 一、编制依据及参照 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 „„„„„„„„„„„„„„„„„„2 二、工程概况 „„„„„„„„„„„„„„„„„„„„„„„2 三、准备工作 „„„„„„„„„„„„„„„„„„„„„„„3 四、施工 方法 快递客服问题件处理详细方法山木方法pdf计算方法pdf华与华方法下载八字理论方法下载 „„„„„„„„„„„„„„„„„„„„„„„3 五、质量要求 „„„„„„„„„„„„„„„„„„„„„8 六、各项保护措施„„„„„„„„„„„„„„„„„„„9 中建三局建设工程股份有限公司 CHINA CONSTRUCTION THIRD ENGINEER BUREAU CORP.,LTD 1 一、编制依据及参照标准 1、华东建筑设计院设计施工图纸 2、砌体工程施工质量验收规范(GB50203-2002) 3、施工现场实际情况。 二、工程概况 本工程中因承台、基础梁与地下室底板均为C40且抗渗等级为P10的混凝土,在各区域内顶标高均相同(变截面处承台顶标高同较低一侧板顶标高),所以本工程承台、基础梁及变标高处内侧斜面均采用砖胎膜。 三、准备工作 3.1施工管理组织准备 公司选派优秀的管理人员组建项目经理部、组织过硬的施工队伍,通过入场教育,提高管理人员和施工人员的质量、安全意识。 项目主要管理人员安排如下: 序 职务 姓名 工作内容 号 1 项目经理 李文平 项目施工整体安排、控制 2 技术总工 郑兴平 现场技术、质量控制、资料整理 3 质量员 伊赟 施工过程质量控制、质量验收 4 安全员 祈啸 现场安全监督 现场主要施工人员安排如下: 序 分工 人数 工作内容 号 1 砌筑工人 40 砂浆拌制,砖胎模砌筑 acidity, mL.; M--calibration of the molar concentration of sodium hydroxide standard solution, moI/L; V--amount of the volume of sodium hydroxide standard solution, Ml; M--the weight of the sample, g. Such as poor meets the requirements, take the arithmetic mean of the second determination as a result. Results one decimal. 6, allowing differential analyst simultaneously or in quick succession for the second determination, the absolute value of the difference of the results. This value should be no more than 1.0. 1, definitions and principles for determination of ash in starches, starch and ash: starch samples of ash the residue obtained after weight. Original sample residue weight of sample weight or weight expressed as a percentage of the dry weight of the sample. Samples of ash at 900 ? high temperature until ashing sample ... The Crucible: determination of Platinum or other conditions of the affected material, capacity of 50mL. Dryer: has effectively adequate drying agent and-perforated metal plate or porcelain. Ashing furnaces: device for controlling and regulating temperature, offers 900 incineration temperature of 25 c. Analytical balance. Electric hot plate or Bunsen. 3, crucible of analysis steps preparation: Crucible must first wash with boiling dilute hydrochloric acid, then wash with a lot of water and then rinse with distilled water. Wash the Crucible within ashing furnace, heated at 900 to 25 ? 30min, and in the desiccator to cool to room temperature and then weighing, 昆钢科技大厦项目工程 材料供应、材料进场报验、材料试 2 材料员 5 验 3 机械设备 2 保管、维修所有机械小型工具等 4 成品保护 3 对砖胎模验收后的成品监控 3.2技术准备 1.1施工前应认真熟悉施工图纸,掌握砌体的长度、宽度、高度等几何 尺寸 手机海报尺寸公章尺寸朋友圈海报尺寸停车场尺寸印章尺寸 ;掌握砌体的轴线位置、标高、构造形式,梁口位置等内容情况。 1.2根据砌体尺寸及砌块规格计算其皮数,标明梁洞口的位置。 2材料准备: 2.1采用MU10烧结砖。 2.2砌筑砂浆为实验员配好的M5水泥砂浆,后台集中搅拌,塔吊吊至使用地点。同时,内侧及顶面采用1:3水泥砂浆抹面。 2.2.1砌筑砂浆应采用机械搅拌,自投料完算起,搅拌时间不得小于2min 2.2.2.砂浆应随拌随用,水泥砂浆应在3h内使用完毕;当施工期间最高气温超过30?时,应在拌成后2h内使用完毕。 2.2.3其它辅助材料:钢筋、混凝土等应符合设计要求。 3主要机具 3.1机械设备:砂浆搅拌机、水平、垂直运输机械等。 3.2主要工具:瓦刀、铁锹、筛子、手推车等。 3.3检测工具:水准仪、经纬仪、水平尺、钢卷尺、卷尺、靠尺、锤线球、磅秤、砂浆试模等。 四、施工方法 4.1施工条件 4.1.1垫层已经施工完毕,垫层超出独立基础外轮廓100mm。侧模砖墙厚度为240mm。在垫层外要弹出基础底板外边线,保护砖墙轮廓线,独立基础基坑按1:3系数放坡,砖侧模与坑壁之间空隙用7:3砂石搅拌均匀回填。经检查复 中建三局建设工程股份有限公司 CHINA CONSTRUCTION THIRD ENGINEER BUREAU CORP.,LTD 3 核符合图纸要求,并办理预检手续。 4.1.2根据已放好基础轴线及边线;立好皮数杆(一般间距15,20m,转角处均应设立),用30×40的木料制作,一般距墙或墙角50mm为宜,皮数杆应垂直、牢固、标高一致,立完后应经复核。 4.1.3保护砖墙与边坡之间用2:8灰土填充,分层夯实。 4.1.4工程各区域承台、基础梁及地下室底板顶标高分别为-15.8m、-15.3m、-13.7m、-9.4m,待承台及基础梁垫层施工完毕后,承台及基础梁侧砌筑240mm厚砖胎膜。 4.2砌筑方式: 本工程各区域承台、基础梁及地下室底板顶标高分别为-15.8m、-15.3m、-13.7m、-9.4m,待承台及基础梁垫层施工完毕后,承台及基础梁侧砌筑240mm厚砖胎膜至板底标高。 4.3工艺流程 清理基层?施工准备(放线、立皮数杆)?拌制砂浆?砌筑?养护?验收。 4.4操作工艺 1、砌体施工前,应清理放线、立皮数杆、验线,并经验收合格后方可施工。砌体排列必须按以下原则、方法、要求进行。 (1)砌块排列时应尽量采用主规格砌块,砌块排列应错缝搭砌,搭砌长度不应小于主砌块长度的1/4。 (2)梁身转角处及纵横交接处,应分皮咬槎,交错搭砌。 (3)砌体水平直灰缝厚度一般为8,12mm。 2、砌筑前砌体不宜浇水,应提前2d浇水湿润,砌块砌筑时宜向砌筑面适量浇水。 、砌筑第一皮砌块,灰缝大于20mm时,应用豆石混凝土找平铺砌。 3 4、砌体应采用满铺或“三一”砌砖法砌筑。灰缝应做到横平竖直,全部灰缝均应填满砂浆,一次铺灰长度不宜超过800mm,并随铺随砌,砌筑一定要 “上跟线,下跟棱,左右相邻要对平”。可用瓦刀敲击摆正、摆平,挤压灰缝密实,保证砂浆饱满度不小于80,。同时应随时进行检查,做到随砌随查随纠正。严禁施工完毕后校正,敲打墙体。 acidity, mL.; M--calibration of the molar concentration of sodium hydroxide standard solution, moI/L; V--amount of the volume of sodium hydroxide standard solution, Ml; M--the weight of the sample, g. Such as poor meets the requirements, take the arithmetic mean of the second determination as a result. Results one decimal. 6, allowing differential analyst simultaneously or in quick succession for the second determination, the absolute value of the difference of the results. This value should be no more than 1.0. 1, definitions and principles for determination of ash in starches, starch and ash: starch samples of ash the residue obtained after weight. Original sample residue weight of sample weight or weight expressed as a percentage of the dry weight of the sample. Samples of ash at 900 ? high temperature until ashing sample ... The Crucible: determination of Platinum or other conditions of the affected material, capacity of 50mL. Dryer: has effectively adequate drying agent and-perforated metal plate or porcelain. Ashing furnaces: device for controlling and regulating temperature, offers 900 incineration temperature of 25 c. Analytical balance. Electric hot plate or Bunsen. 3, crucible of analysis steps preparation: Crucible must first wash with boiling dilute hydrochloric acid, then wash with a lot of water and then rinse with distilled water. Wash the Crucible within ashing furnace, heated at 900 to 25 ? 30min, and in the desiccator to cool to room temperature and then weighing, 昆钢科技大厦项目工程 5 、雨季施工时,砌块应做好防雨措施,被雨水淋湿透的砌块,不得使用。当雨量较大时,应停止砌筑,并对已砌筑的砖胎膜采取遮盖措施。继续施工时,应对砖胎膜进行检查,复核垂直度、平整度是否有变形,确认符合质量标准的情况下,方可继续施工。 6、抹灰 在砖墙上用20厚1:3水泥砂浆抹面,阴阳角抹成直角,然后再做防水层和防水保护层。 4.5砖胎膜砌筑大样: 详见《承台及基础梁砖胎膜示意图》 中建三局建设工程股份有限公司 CHINA CONSTRUCTION THIRD ENGINEER BUREAU CORP.,LTD 5 acidity, mL.; M--calibration of the molar concentration of sodium hydroxide standard solution, moI/L; V--amount of the volume of sodium hydroxide standard solution, Ml; M--the weight of the sample, g. Such as poor meets the requirements, take the arithmetic mean of the second determination as a result. Results one decimal. 6, allowing differential analyst simultaneously or in quick succession for the second determination, the absolute value of the difference of the results. This value should be no more than 1.0. 1, definitions and principles for determination of ash in starches, starch and ash: starch samples of ash the residue obtained after weight. Original sample residue weight of sample weight or weight expressed as a percentage of the dry weight of the sample. Samples of ash at 900 ? high temperature until ashing sample ... The Crucible: determination of Platinum or other conditions of the affected material, capacity of 50mL. Dryer: has effectively adequate drying agent and-perforated metal plate or porcelain. Ashing furnaces: device for controlling and regulating temperature, offers 900 incineration temperature of 25 c. Analytical balance. Electric hot plate or Bunsen. 3, crucible of analysis steps preparation: Crucible must first wash with boiling dilute hydrochloric acid, then wash with a lot of water and then rinse with distilled water. Wash the Crucible within ashing furnace, heated at 900 to 25 ? 30min, and in the desiccator to cool to room temperature and then weighing, 昆钢科技大厦项目工程 中建三局建设工程股份有限公司 CHINA CONSTRUCTION THIRD ENGINEER BUREAU CORP.,LTD 7 五、质量要求 5.1主控项目 5.1.1砖的品种、强度等级必须符合设计要求。 5.1.2砂浆品种符合设计要求。 5.1.3砌体砂浆必须饱满密实,实心砖砌体水平灰缝的砂浆饱满度不小于80%。 5.1.4外墙的转角处严禁留直槎,其它临时间断处,留槎的作法必须符合施工规范的规定。 5.2一般项目 5.2.1砖砌体上下错缝,每处无长度超过500mm以上的通缝。 5.2.2砖砌体接槎处灰缝砂浆密实,缝、砖应平直。 5.3允许偏差 5.3.1砖墙 项次 项目 允许偏差(mm) 检验方法 1 轴线位置偏差 10 用经纬仪或拉线尺量检查 2 墙体顶面标高 ?15 用水准仪和尺量检查 3 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf 面平整度 8 用2m靠尺和塞尺检查 4 水平灰缝平直度 10 用2m靠尺和水平尺检查 5.3.2抹灰 项次 项目 允许偏差(mm) 检验方法 1 立面垂直 5 用2m托线板检查 2 表面平整 4 用2m靠尺及楔形塞尺检查 3 阴阳角垂直 4 用2m托线板检查 acidity, mL.; M--calibration of the molar concentration of sodium hydroxide standard solution, moI/L; V--amount of the volume of sodium hydroxide standard solution, Ml; M--the weight of the sample, g. Such as poor meets the requirements, take the arithmetic mean of the second determination as a result. Results one decimal. 6, allowing differential analyst simultaneously or in quick succession for the second determination, the absolute value of the difference of the results. This value should be no more than 1.0. 1, definitions and principles for determination of ash in starches, starch and ash: starch samples of ash the residue obtained after weight. Original sample residue weight of sample weight or weight expressed as a percentage of the dry weight of the sample. Samples of ash at 900 ? high temperature until ashing sample ... The Crucible: determination of Platinum or other conditions of the affected material, capacity of 50mL. Dryer: has effectively adequate drying agent and-perforated metal plate or porcelain. Ashing furnaces: device for controlling and regulating temperature, offers 900 incineration temperature of 25 c. Analytical balance. Electric hot plate or Bunsen. 3, crucible of analysis steps preparation: Crucible must first wash with boiling dilute hydrochloric acid, then wash with a lot of water and then rinse with distilled water. Wash the Crucible within ashing furnace, heated at 900 to 25 ? 30min, and in the desiccator to cool to room temperature and then weighing, 昆钢科技大厦项目工程 六、各项保证措施 6.1成品保护措施 6.1.1砌体材料运输、装卸过程中严禁抛掷和倾倒。进场后,要按品种、规格分别堆放整齐,作好标识,堆放高度不能超过2m。 6.1.2回填砂石时,人工用铲、锹从放坡的坑壁侧填入,防止回填时挤歪挤裂。 6.1.3回填砂石运输时,先将墙顶保护好,不得在墙上推车,损坏墙顶和碰撞墙体。 6.2安全措施 6.2.1墙身砌体高度超过1.2m以上,必须及时搭设好脚手架,不准用不稳定的工具或物体垫高工作。脚手架上下行梯道有防滑措施,经常检查外脚手架。 6.2.2现场安全员负责火源、电源的管理。用电接线必须由专职电工进行,不得私拉乱接。 6.2.3现场按照规定设立相应的安全标志,配置防火器具。 6.2.4用电设备在使用前,检查电线绝缘、接地、开关安装等情况,应符合用电要求。 6.2.5进入施工现场,要正确穿戴安全防护用品。 6.2.6施工现场严禁吸烟,不得酒后作业。 6.2.7从砖垛上取砖时,先取高处后取低处,防止垛倒砸人。 6.2.8在施工操作之前必须检查操作环境是否符合安全要求,安全设施和防护用品是否完备。 6.3环保措施 6.3.1砂浆不得遗撒污染作业面。 6.3.2施工垃圾应每天清理,堆放在指定的地点。 6.3.3现场的砂石料要用帆布覆盖,水泥在库房内存放。 6.3.4材料在运输时要加以覆盖,防止遗洒。 中建三局建设工程股份有限公司 CHINA CONSTRUCTION THIRD ENGINEER BUREAU CORP.,LTD 9
本文档为【砖胎膜砌筑方案】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载

你可能还喜欢

最新资料
资料动态
专题动态
is_281650
暂无简介~
格式:doc
大小:69KB
软件:Word
页数:13
分类:生活休闲
上传时间:2017-10-23
浏览量:62