首页 电动车电器原理

电动车电器原理

举报
开通vip

电动车电器原理电动车电器原理 适用范围:电机霍尔良好的控制器更换 功率管数量:6 功率管型号:IR3607 技术规格:36/48 V 电机:60/120度 250-350W 高/低 双刹车 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material ...

电动车电器原理
电动车电器原理 适用范围:电机霍尔良好的控制器更换 功率管数量:6 功率管型号:IR3607 技术规格:36/48 V 电机:60/120度 250-350W 高/低 双刹车 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 适用范围:电机霍尔损坏且不易修复的控制器更换 功率管数量:6 功率管型号:IR3607 技术规格:36/48 V 电机:60/120度 250-350W 高/低 双刹车 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 适用范围:36-48V 通用 无霍尔-自学习 自动转换 功率管数量:6 功率管型号:IR3607 技术规格:36/48 V 电机:60/120度 250-350W 高/低 双刹车 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly 应某网友的要求,贴上一张电动车电气原理图 新增电动自行车电原理图 be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly be limited to no more than 2 days of work, material deposited in special insulated containers, material handling to gently and make use of thermal insulation material in windproof, waterproof, moisture-proof measure. 6.2 thermal design optimization for high-temperature special thermal insulation for piping support and hanger design, reduced heat dissipation of the hangers, ensure that the wall does not overheat. Small-diameter piping, thermal instrument layout and positioning of support and hanger design take fully into account the expansion space and insulation thickness. Large-diameter pipes after heat preservation plastering construction of valves, turbine, checking smooth surface, high temperature powder paint fully dry after. Protective coverings for electric equipment insulation boards designed with pressure plate, when ordering according to the installation diagram, model specifications publishing order, ensure when installing corners neat, uniform appearance, reduce the amount of on-site machining. Before valves, flange insulation shell construction, be sure to make a unified model, all valves, flanges, insulation cover unified, tidy and beautiful. When four parts such as pipes, boiler insulation, must do first article inspection, proof of design and construction methods, technology can meet the technological requirements, before extensive construction. Boiler steel beams, door opening boxes designed with insulation gaskets, flange cannot be oblique, even fastened. Back into the slope of the tubing during installation pay attention to the piping, oil station is a low point. Refueling must be controlled when casting material parts, select low thermal conductivity materials as far as possible, ensure that these parts do not overheat. 6.3 quality defects of insulation technology management optimization of construction process and develop a reasonable duration, regional transfer of strictly
本文档为【电动车电器原理】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_531654
暂无简介~
格式:doc
大小:272KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-11-20
浏览量:15