活动板房安装工艺流程表
Prefabricated House Installation Flow Chart
序
号
NO.
项目名称
Title
作业内容
Job Content
质量MATCH_
word
word文档格式规范word作业纸小票打印word模板word简历模板免费word简历
_1715893077846_0 Quality
Standard
管理控制点
Management
Control Point
使用工具 Tools
Used
1
安装地梁
Groud
Beam
Installation
1. 调校地梁的直
线度。
Adjust straightness
of ground beam.
2. 将山墙地梁与
前后地梁按图
摆放。
Put the fastigium
ground beam and
front and back
ground beam
according to the
drawing.
3. 检查地梁每边
的长度。
Check the length of
every side of groud
beam.
4. 通过勾股定理
检查 4边的垂直
度。
Check the verticality
of the 4 boards by
Pythagorean theorem
5. 测量水平点,
过低的用铁片
托高。
Measure the level
of point ,jack up
the low point using
metal plates.
6. 用 M8×80 膨
胀螺丝固定地
梁,并用卷尺
测量地梁之间
的距离。
Fix the ground
1. 直线度,长度方向
上角每 10 米不得
超 3mm.
Straightness,the
corner on the
straight side can not
surpass 3mm.
2. 垂直度:弦长±
2mm。
Verticality: chord length
is ±2mm
3.尺寸偏差:地梁间距即
由山墙间每 20M 允许±
5mm,前后墙间允许±
2mm.
Size deviation: the
distance between
ground beam and
fastigium allow ±
5mm size deviation
every 20M. The
front and back
fastigium allow size
deviation is 2mm.
3. 水平点每20M允许
±10mm
Allow ± 10mm every
20M on bench-mark
1. 先调校地梁,
并按顺序在地
基 上 相 应 放
好,初见矩形。
First adjust ground
beam, then put
them on the basic
on sequence.
Rectangle in sight.
2. 确定1条山墙地
梁为基准,用 2
个 M8×800 膨
胀螺丝固定,然
后检查前后墙
的总长度,通过
勾股定理确定
另一山墙地梁
并用2个膨胀螺
丝固定其两端
Standardize one
ground beam
and set it as
example. Fix it
with two M8×
800 setscrew.
Check the total
length of front
and back
fastigium.
Check the
verticality by
Pythagorean
theorem. Fix
both sides with
two M8× 800
setscrew.
铁锤 hammer
扳手 spanner
胶 管 rubber
tube
细线 fine line
卷 尺 flexible
rule
冲击钻 churn
drill
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
佛山市安美捷轻钢房屋有限公司
beam using M8×
80 setscrew, and
measure distance
between groud
beams by the
flexible rule.
3. 在山墙地梁的
端 点 测 水 平
点,并拉直线
随之将前后地
梁固定在同一
水平面的直线
上。
Check the level
point on the end of
fastigium ground
beam. Keep the
front and back
ground beam
collinear by pulling
line.
4. 调整山墙地梁
在同一水平面
并且固定它。
Adjust and fix
the fastigium
ground beam,
keep it to be
collinear.
5. 在地梁与立柱
的连接处的地
梁与地面缝隙
用铁片填实。
Use iron sheet
to fill the blank
between
ground beam
and perimeter
beam.
2
安装角柱
Angle Post
Installation
1. 安装角柱与地
梁连接。
Install the
connection between
angle post and
ground beam.
2. 安装山墙板与
角立柱连接。
Install the link
between fastigium
1. 角柱必须垂直于地
梁中心线。
Angle post must be
vertical to the central of
column.
2. 目测外观:前后中
间立柱,山墙立柱
和角立柱均各在一
条直线上,无明显
偏移和倾斜扭曲。
1. 确保按工作内
容规定的顺序
安装。
Assure the
sequence of
installation on job
content rules.
2. 安装时注意周
围 空 间 的 物
料,电缆等确
保安全生产。
水平尺,拉线,
扳手
levelling
instrument,
bracing wire
and spanner
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
佛山市安美捷轻钢房屋有限公司
panel and angle
post.
3. 安装山墙立柱
与地梁连接。
Install the connection
between fastigium
post and ground
beam.
Visual inspection:
front,back central
stud,fastigium post and
cornrer post must be
collinear, no shift and
lean
Notice the
materials
aroud,
especially the
cable. Assure
the safty f
working.
3. 靠边的角柱连
接山墙板时必
须 要 有 人 扶
撑,防止倾斜。
There must
worker support
to prevent
leaning when
connect the
corner and
fastigium
panel.
4. 在前后角立柱
之间,拉线栓
直各立柱的垂
直度,直线度。
Keep the front
and back
corner post
straight.
5. 所有的立柱经
调校后紧固螺
栓。
Fix the screw after
adjustment of
perimeter beam.
3
安装外墙
板
Exterior
Wall Board
Installation
1. 按图纸要求:
According to
the request of
drawing:
A. 安装外墙夹芯
板
Install exterior
wall battenboard
B. 安装窗。
Install window
1. 外墙夹芯板接口平
顺紧密,表面洁净,
无污渍,无变形。
The connection of
exterior batten board is
closed, clean surface, no
distortion
2. 玻璃胶应饱满连续
均匀,外观美雅。
The glue of glass
cement should be
1. 安装传递过程
中外墙夹芯板窗框
不得碰撞,防变形。
No collision and
distortion when
handling the
exterior
battenboard and
window frame.
2. 安装前接口插
入端用手略加收
剪刀 scissors
玻 璃 枪 glass
spear
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
佛山市安美捷轻钢房屋有限公司
C. 窗框与立柱之
间 连 接 要 紧
密。
Be closed
connected between
window frame and
perimeter beam.
2. 窗框四周内外
两边涂上玻璃
胶。
Paint glass cement
all around, outside
and inside and both
sides of window
frame.
uniformly continuous. 窄 ,在四角对接时
不得强行猛压要在
接口确认无误时压
紧。
Press the connector
insert point little
narrow. No forceful
pressure is allowed.
Press tightly and
rightly on the
interface.
3. 窗框与立柱之
间连接要紧密.
Be closely tight
between window
frame ands
perimeter beam.
4
安装内隔
板
Interior
Partition
Wall
Installation
1.安装固定地面及
两侧墙体彩钢地
槽。
Install and fix color
steel geosyncline fo
floor and two sides
2.安装镁磷板用隔
墙卡码固定
Install
magnesium ply
plate, and fix with
partition wall card
code.
3.合接缝处打硅胶
密封。
Seal the connection
poit with silica
gel.
1.镁磷板高度一致平
整对齐。
keep magnesium ply
plate in the same height.
2.镁磷板接缝紧密无
漏隙,板面洁净,无损
坏。
The connection of
magnesium ply plate
should be closed
tighted, clean surface
and not spoiled.
3.硅胶不宜过厚,连
接要均匀。
Silica gel should be
prosperous in
thickness , equal in
connection.
1.整个房屋镁磷板
统一高度。
Keep the same
height on
magnesium ply
plate.
2.每条地槽用 2
个 M4×25 自攻钉
固定。
Fix the geosyncline
with 2 M4 × 25
self-tapping screw.
3. 隔 墙 整 体 平
直,接缝严密。
Partition board
keep upright,
connection is
closely tighted.
5
安装圈梁
Column
Installation
1. 用 M4×25 自
攻 钉 安 装 圈
梁。
Install column with
M4 × 25
self-tapping screw.
2. 按顺序安装前
后圈梁. Install
自攻钉拧紧力为 7㎏
Schraubenkraft of
self-tapping screw
reach 7㎏
1. 防止工具和螺
钉脱落伤人 .
Prevent tool
and screw
falling off to
hurt people.
电动扳手
electromotion
spanner
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
佛山市安美捷轻钢房屋有限公司
front and back
column
sequentially
6
安装前后
墙体
Front and
Back Wall
Body
Installation
根据图纸要求按以
下顺序安装:
Install below
according to
drawing and
sequence.
1.安装外墙夹芯板
Install exterior
wall battenboard.
2.安装窗
Install window
3.在窗框的四周打
透明玻璃胶封密。
Seal the window
frame all aroud
with transparent
glass cement.
4.用M5×25自攻
钉连接立柱与地梁
连接件。Connect
perimeter beam and
ground connector
with M5 × 25
self-tapping screw.
4. 1.夹芯板接口平顺
紧密,表面洁净,
无变形。
The connector of
battenboard should be
closed tighted, clean
surface, no distortion.
2.玻璃胶要饱满连续
均匀,美观。
The glue of glass
cement should be
uniformly continuous.
1.外墙夹芯板在安
装传递过程中不得
碰撞变形。
No collision
distortion when
handling the
exterior wall board.
2.安装前接口插入
端要用手略窄收
口,连接位不得强
行压入,要在接口
确认无误时压紧。
Press the connector
insert point little
narrow. No forceful
pressure is allowed.
Press tightly and
rightly on the
interface.
7
安装门
Door
Installation
1.按图纸计算开锯
门身。
Calculate the door
body according to
the drawing.
2.拼装门身。
Assemble door
body
3.安装合页。
Install hinge
4.安装门锁。
Install door lock.
A.划线定锁住及
锁孔位。
1.门与门框配合缝隙
均匀。
The well connection on
door and door frame.
2.装合页边的门与门
框缝小于 5mm。
The installation hinge
between door and door
frame less than 5mm.
3.装锁边的门与门框
缝小于 8mm。
The blank between door
and door frame less than
1.装门框合页时,
门与地面垂直,与
门框配合紧密,位
置正确,用 M5×
15拉钉固定合页。
When install door
frame hinge, keep
the door
upright.Door is
matching to door
frame, and in right
position.Fix the
hinge with M5×15
blind rivet
电钻 drill
拉 钉 机 rivet
machine
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
佛山市安美捷轻钢房屋有限公司
Fixed line and
keyhole lock
B.钻孔。
Drill
C . 组 装 锁 。
Assembel the lock.
以上均用 M5×25
拉钉。Above all use
M5×25 blind rivet
8mm beside lock.
4.锁与地板高度 1米。
The height of lock is
1M to floor.
5.门身自然垂直,开
闭自如,不滞阻。
The door is naturally
vertical, easily open and
closed.
2.装锁划线时要准
确钻孔时钻头垂直
对准中心点才钻。
Drills are vertical
and aim to central
line.
3.拧紧固定锁的镙
丝时力度要平衡,
预防翘起裂缝。
The force should be
equal when tighten
and fix the screw
on lock.
8
安装屋面
钢构件
Roofing
Steel
Structure
Component
Installation
1.安装山墙人字
梁。
Install fastigium
zig-zag beam.
2.按顺序安装人字
梁及简易人字梁。
Install zig-zag beam
and simple zig-zag
beam on sequence.
3.安装人字梁水平
支撑。
Install zig-zag beam
lateral bracing.
4.安装屋面檩条。
以上均用M10×25
螺栓连接。 Install
roofing purlin with
M10×25 bolt.
5. 用M5×25自攻
螺丝安装雨蓬
支撑。
Install canopy
bracing with M5×
25 self-tapping screw
1. 螺栓拧紧力度为 7
㎏。
Schraubenkraft of screw
reach 7㎏.
2. 人字梁的安装应在
同一高度对准,并
且顶角在同一直线
上.
Be right in height,
be collinear in
vertex angle.
1. 安装人字梁两
端应平行,用
M10×25 自攻
螺丝拧紧。
Be parallel on two
sides of zig-zag
beam, fix it tightly
using M10×25 self
tapping screw.
2. 安 装 水 平 支
撑,先在连接
交叉点紧固,
再送到屋面由
2 人在其两端
同时连接人字
梁。
Install lateral
bracing, first
tighten the
connector, then
deliver to roof, 2
persons on both
sides connect
zig-zag beam.
3. 安装水平支撑
和 屋 面 檩 条
时,必须系安
全 带 和 安 全
帽,其下方不
得站人,防止
落 物 伤 人 。
扳手 spanner
细线
fine line
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
佛山市安美捷轻钢房屋有限公司
When install
lateral bracing
and roof purlin,
workers must
wear life belt
and helmet. No
one is allowed
to stand under
in order to
prevent
hurting.
9
安装屋面
瓦
Roofing
Tile
Installation
1、用 M5×65 自攻
钉在瓦边与屋面檩
条连接。Connect the
tile margin and
roofing purlin with
M5×65 self-tapping
screw.
2、安装山墙收边时
收边与山墙夹芯板
每隔 200-400mm 用
M4×15拉钉固梁,
并涂硅胶。
When install
fastigium sealing, fix
sealing and fastigium
beam battenboard
with M4×15 blind
rivet every
200-400mm,a nd
then paint silica gel.
3、屋面瓦之间边缘
与瓦棱瓦相匹配。
The brink between
tiles must be
matching with tar
valon tile.
4、安装屋脊瓦时,
用 M4×12 拉钉铆
在屋面瓦的瓦棱上,
并涂硅胶。When
install fastigium,
rivet M4×12 blind
rivet on the tar valon
1.屋面雨檐同一高度
和直线上。
Keep in same high and
collinear roofing eaves.
2.屋面瓦之间紧密连
接 。 Be closedly
connected on roofing
tiles
3.山墙收边与墙体瓦
面搭接紧密。
Be closedly connected
between fastigium beam
and wall tile.
4.拉钉必须打在瓦脊棱
上,并涂硅胶。
The blind rivet must on
the tar valon, and paint
silica gel.
1.除必须要员之
外,严禁他人站在
屋面,并要系安全
带。
Except the workers,
no one is allowed
to stand on roof.
The workers must
wear life belt.
2.装山墙收边时,
不得将夹芯板拉裂
开。
No split on
battenboard when
install fastigium
sealing.
3.每块屋面瓦用自
攻钉拧紧在檩条
上,每条檩条不得
少于 2粒。
Fix tightly roofing
tile to purlin by
self-tapping screw,
no less 2 screwson
each purlin.
4.在两边山墙各铺
一块屋瓦,在屋檐
处拉线调试后再安
装其它的屋面瓦。
Put a roofing tile on
both fastigiums. Do
adjustment by
line,and then install
电钻 drill
拉钉器
rivet machine
细线
fine line
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
佛山市安美捷轻钢房屋有限公司
of roofing tile, and
then paint silica gel.
other tile.
10
粘广告纸
Advertising
Paper Glue
1. 清洁外墙夹板 4
块。
Clean 4 pieces
exterior wall
battenboard
2. 按正确方向粘
广告纸 . Glue
the advertising
paper on the
right direction.
1. 无明显气泡、皱纹。
No bubble and
wrinkle.
2. 边的水平宽度少于
5mm。
The horizontal
clearance on side is less
than 5mm.
3. 其边无翘起
No rise on side.
1. 外墙夹板无明
显凹点,必须
干净干燥。
The exterior board
should be flat,
clean and dry in
appearance.
2. 撕粘不干胶纸
时,用力均匀。
Use uniform
force when tear
self-adhesive
sticky paper.
3. 必须 2 人同时
操作。
Need 2 persons to
operate.
干布
dry cloth
11
补漆
Paint
Repair
给整个钢构件有磨
花或磨损处补漆。
Repair the paint on
abraded steel
structure.
1. 漆均匀并且与原颜
色相同。
The repair paint is even
and the same with the
original color.
不得将漆污染他处
Can not pollute other
places with paint.
将胶漆处理干净干
燥后补漆.
Repair the paint
after the
appearance is dry.
12 立 柱 接 缝
上密封胶。
Sealing of
the blank
between
perimeter
beam
给所有中间立柱,
角立柱的接缝处上
透明密封胶。
Seal the blank
between all central
perimeter beam
with the transparent
glue
1. 密封胶应连续均
匀,无鱼磷状等缺
点。 Sealing glue
should be uniform.
No other
shortcoming.
2. 无漏隙现象
No leaking
立柱接缝处必须先
清洁后上胶,做到
干净(无泥沙、屑
末、焊渣),干燥(无
水、无油污)
The connection of
perimeter beam
should be
clean,dry .
玻璃枪干布
Dry cloth used
for glass gun