893
Pipeline and Hazardous Materials Safety Admin., DOT § 178.69
straightened or flattened cold, by pres-
sure only, not by blows; when speci-
mens are so taken and prepared, the in-
spector’s report must show in connec-
tion with record of physical test de-
tailed information in regard to such
specimens.
(iv) Heating of a specimen for any
purpose is not authorized.
(3) The yield strength in tension
must be the stress corresponding to a
permanent strain of 0.2 percent of the
gauge length. The following conditions
apply:
(i) The yield strength must be deter-
mined by the ‘‘offset’’ method as pre-
scribed in ASTM E 8 (IBR, see § 171.7 of
this subchapter).
(ii) Cross-head speed of the testing
machine may not exceed 1⁄8 inch per
minute during yield strength deter-
mination.
(k) Acceptable results for physical tests.
An acceptable result of the physical
test requires an elongation to at least
7 percent and yield strength not over 80
percent of tensile strength.
(l) Weld tests. Welds of the cylinder
are required to successfully pass the
following tests:
(1) Reduced section tensile test. A speci-
men must be cut from the cylinder
used for the physical tests specified in
paragraph (j) of this section. The speci-
men must be taken from across the
seam, edges must be parallel for a dis-
tance of approximately 2 inches on ei-
ther side of the weld. The specimen
must be fractured in tension. The ap-
parent breaking stress calculated on
the minimum wall thickness must be
at least equal to 2 times the stress cal-
culated under paragraph (f)(2) of this
section, and in addition must have an
actual breaking stress of at least 30,000
psi. Should this specimen fail to meet
the requirements, specimens may be
taken from 2 additional cylinders from
the same lot and tested. If either of the
latter specimens fails to meet require-
ments, the entire lot represented must
be rejected.
(2) Guided bend test. A bend test speci-
men must be cut from the cylinder
used for the physical tests specified in
paragraph (j) of this section. Specimen
must be taken across the seam, must
be 11⁄2 inches wide, edges must be par-
allel and rounded with a file, and back-
up strip, if used, must be removed by
machining. The specimen must be bent
to refusal in the guided bend test jig il-
lustrated in paragraph 6.10 of CGA
Pamphlet C–3 (IBR, see § 171.7 of this
subchapter). The root of the weld (in-
side surface of the cylinder) must be lo-
cated away from the ram of the jig. No
specimen must show a crack or other
open defect exceeding 1⁄8 inch in any di-
rection upon completion of the test.
Should this specimen fail to meet the
requirements, specimens may be taken
from each of 2 additional cylinders
from the same lot and tested. If either
of the latter specimens fail to meet re-
quirements, the entire lot represented
must be rejected.
(m) Rejected cylinders. Repair of weld-
ed seams is authorized. Acceptable cyl-
inders must pass all prescribed tests.
(n) Inspector’s report. In addition to
the information required by § 178.35, the
record of chemical analyses must also
include applicable information on iron,
titanium, zinc, and magnesium used in
the construction of the cylinder.
[Amdt. 178–114, 61 FR 25942, May 23, 1996, as
amended at 62 FR 51561, Oct. 1, 1997; 66 FR
45386, Aug. 28, 2001; 67 FR 51654, Aug. 8, 2002;
68 FR 75748, Dec. 31, 2003; 69 FR 54046, Sept.
7, 2004; 74 FR 16143, Apr. 9, 2009]
§ 178.69 Responsibilities and require-
ments for manufacturers of UN
pressure receptacles.
(a) Each manufacturer of a UN pres-
sure receptacle marked with ‘‘USA’’ as
a country of approval must comply
with the requirements in this section.
The manufacturer must maintain a
quality system, obtain an approval for
each initial pressure receptacle design
type, and ensure that all production of
UN pressure receptacles meets the ap-
plicable requirements.
(1) Quality system. The manufacturer
of a UN pressure receptacle must have
its quality system approved by the As-
sociate Administrator. The quality sys-
tem will initially be assessed through
an audit by the Associate Adminis-
trator or his or her representative to
determine whether it meets the re-
quirements of this section. The Asso-
ciate Administrator will notify the
manufacturer in writing of the results
of the audit. The notification will con-
tain the conclusions of the audit and
VerDate Mar<15>2010 15:30 Dec 30, 2010 Jkt 220213 PO 00000 Frm 00903 Fmt 8010 Sfmt 8010 Q:\49\X49\220213.XXX ofr150 PsN: PC150
894
49 CFR Ch. I (10–1–10 Edition) § 178.70
any corrective action required. The As-
sociate Administrator may perform
periodic audits to ensure that the man-
ufacturer operates in accordance with
the quality system. Reports of periodic
audits will be provided to the manufac-
turer. The manufacturer must bear the
cost of audits.
(2) Quality system documentation. The
manufacturer must be able to dem-
onstrate a documented quality system.
Management must review the adequacy
of the quality system to assure that it
is effective and conforms to the re-
quirements in § 178.70. The quality sys-
tem records must be in English and
must include detailed descriptions of
the following:
(i) The organizational structure and
responsibilities of personnel with re-
gard to design and product quality;
(ii) The design control and design
verification techniques, processes, and
procedures used when designing the
pressure receptacles;
(iii) The relevant procedures for pres-
sure receptacle manufacturing, quality
control, quality assurance, and process
operation instructions;
(iv) Inspection and testing meth-
odologies, measuring and testing equip-
ment, and calibration data;
(v) The process for meeting customer
requirements;
(vi) The process for document control
and document revision;
(vii) The system for controlling non-
conforming material and records, in-
cluding procedures for identification,
segregation, and disposition;
(viii) Production, processing and fab-
rication, including purchased compo-
nents, in-process and final materials;
and
(ix) Training programs for relevant
personnel.
(3) Maintenance of quality system. The
manufacturer must maintain the qual-
ity system as approved by the Asso-
ciate Administrator. The manufacturer
shall notify the Associate Adminis-
trator of any intended changes to the
approved quality system prior to mak-
ing the change. The Associate Adminis-
trator will evaluate the proposed
change to determine whether the
amended quality system will satisfy
the requirements. The Associate Ad-
ministrator will notify the manufac-
turer of the findings.
(b) Design type approvals. The manu-
facturer must have each pressure re-
ceptacle design type reviewed by an IIA
and approved by the Associate Admin-
istrator in accordance with § 178.70. A
cylinder is considered to be of a new
design, compared with an existing ap-
proved design, as stated in the applica-
ble ISO design, construction and test-
ing standard.
(c) Production inspection and certifi-
cation. The manufacturer must ensure
that each UN pressure receptacle is in-
spected and certified in accordance
with § 178.71.
[71 FR 33885, June 12, 2006]
§ 178.70 Approval of UN pressure re-
ceptacles.
(a) Initial design-type approval. The
manufacturer of a UN pressure recep-
tacle must obtain an initial design
type approval from the Associate Ad-
ministrator. The initial design type ap-
proval must be of the pressure recep-
tacle design as it is intended to be pro-
duced. The manufacturer must arrange
for an IIA, approved by the Associate
Administrator in accordance with sub-
part I of part 107 of this chapter, to
perform a pre-audit of its pressure re-
ceptacle manufacturing operation prior
to having an audit conducted by the
Associate Administrator or his des-
ignee.
(b) IIA pre-audit. The manufacturer
must submit an application for initial
design type approval to the IIA for re-
view. The IIA will examine the manu-
facturer’s application for initial design
type approval for completeness. An in-
complete application will be returned
to the manufacturer with an expla-
nation. If an application is complete,
the IIA will review all technical docu-
mentation, including drawings and cal-
culations, to verify that the design
meets all requirements of the applica-
ble UN pressure receptacle standard
and specification requirements. If the
technical documentation shows that
the pressure receptacle prototype de-
sign conforms to the applicable stand-
ards and requirements in § 178.70, the
VerDate Mar<15>2010 15:30 Dec 30, 2010 Jkt 220213 PO 00000 Frm 00904 Fmt 8010 Sfmt 8010 Q:\49\X49\220213.XXX ofr150 PsN: PC150
895
Pipeline and Hazardous Materials Safety Admin., DOT § 178.70
manufacturer will fabricate a proto-
type lot of pressure receptacles in con-
formance with the technical docu-
mentation representative of the design.
The IIA will verify that the prototype
lot conforms to the applicable require-
ments by selecting pressure receptacles
and witnessing their testing. After pro-
totype testing has been satisfactorily
completed, showing the pressure recep-
tacles fully conform to all applicable
specification requirements, the certi-
fying IIA must prepare a letter of rec-
ommendation and a design type ap-
proval certificate. The design type ap-
proval certificate must contain the
name and address of the manufacturer
and the IIA certifying the design type,
the test results, chemical analyses, lot
identification, and all other supporting
data specified in the applicable ISO de-
sign, construction and testing stand-
ard. The IIA must provide the certifi-
cate and documentation to the manu-
facturer.
(c) Application for initial design type
approval. If the pre-audit is found satis-
factory by the IIA, the manufacturer
will submit the letter of recommenda-
tion from the IIA and an application
for design type approval to the Asso-
ciate Administrator. An application for
initial design type approval must be
submitted for each manufacturing fa-
cility. The application must be in
English and, at a minimum, contain
the following information:
(1) The name and address of the man-
ufacturing facility. If the application is
submitted by an authorized representa-
tive on behalf of the manufacturer, the
application must include the represent-
ative’s name and address.
(2) The name and title of the indi-
vidual responsible for the manufactur-
er’s quality system, as required by
§ 178.69.
(3) The designation of the pressure
receptacle and the relevant pressure re-
ceptacle standard.
(4) Details of any refusal of approval
of a similar application by a designated
approval agency of another country.
(5) The name and address of the pro-
duction IIA that will perform the func-
tions prescribed in paragraph (e) of this
section. The IIA must be approved in
writing by the Associate Administrator
in accordance with subpart I of part 107
of this chapter.
(6) Documentation on the manufac-
turing facility as specified in § 178.69.
(7) Design specifications and manu-
facturing drawings, showing compo-
nents and subassemblies if relevant, de-
sign calculations, and material speci-
fications necessary to verify compli-
ance with the applicable pressure re-
ceptacle design standard.
(8) Manufacturing procedures and
any applicable standards that describe
in detail the manufacturing processes
and control.
(9) Design type approval test reports
detailing the results of examinations
and tests conducted in accordance with
the relevant pressure receptacle stand-
ard, to include any additional data,
such as suitability for underwater ap-
plications or compatibility with hydro-
gen embrittlement gases.
(d) Modification of approved pressure
receptacle design type. Modification of
an approved UN pressure receptacle de-
sign type is not authorized without the
approval of the Associate Adminis-
trator. A manufacturer seeking modi-
fication of an approved UN pressure re-
ceptacle design type may be required
to submit design qualification test
data to the Associate Administrator
before production. An audit may be re-
quired as part of the process to modify
an approval.
(e) Responsibilities of the production
IIA. The production IIA is responsible
for ensuring that each pressure recep-
tacle conforms to the design type ap-
proval. The production IIA must per-
form the following functions:
(1) Witness all inspections and tests
specified in the UN pressure receptacle
standard to ensure compliance with the
standard and that the procedures
adopted by the manufacturer meet the
requirements of the standard;
(2) Verify that the production inspec-
tions were performed in accordance
with this section;
(3) Select UN pressure receptacles
from a prototype production lot and
witness testing as required for the de-
sign type approval;
(4) Ensure that the various design
type approval examinations and tests
are performed accurately;
VerDate Mar<15>2010 15:30 Dec 30, 2010 Jkt 220213 PO 00000 Frm 00905 Fmt 8010 Sfmt 8010 Q:\49\X49\220213.XXX ofr150 PsN: PC150
896
49 CFR Ch. I (10–1–10 Edition) § 178.70
(5) Verify that each pressure recep-
tacle is marked in accordance with the
applicable requirements in § 178.72; and
(6) Furnish complete test reports to
the manufacturer and upon request to
the purchaser. The test reports and
certificate of compliance must be re-
tained by the IIA for at least 20 years
from the original test date of the pres-
sure receptacles.
(f) Production inspection audit and cer-
tification. (1) If the application, design
drawing and quality control documents
are found satisfactory, PHMSA will
schedule an on-site audit of the pres-
sure receptacle manufacturer’s quality
system, manufacturing processes, in-
spections, and test procedures.
(2) During the audit, the manufac-
turer will be required to produce pres-
sure receptacles to the technical stand-
ards for which approval is sought.
(3) The production IIA must witness
the required inspections and
verifications on the pressure recep-
tacles during the production run. The
IIA selected by the manufacturer for
production inspection and testing may
be different from the IIA who per-
formed the design type approval
verifications.
(4) If the procedures and controls are
deemed acceptable, test sample pres-
sure receptacles will be selected at ran-
dom from the production lot and sent
to a laboratory designated by the Asso-
ciate Administrator for verification
testing.
(5) If the pressure receptacle test
samples are found to conform to all the
applicable requirements, the Associate
Administrator will issue approvals to
the manufacturer and the production
IIA to authorize the manufacture of
the pressure receptacles. The approved
design type approval certificate will be
returned to the manufacturer.
(6) Upon the receipt of the approved
design type approval certificate from
the Associate Administrator, the pres-
sure receptacle manufacturer must
sign the certificate.
(g) Recordkeeping. The production IIA
and the manufacturer must retain a
copy of the design type approval cer-
tificate and certificate of compliance
records for at least 20 years.
(h) Denial of design type application. If
the design type application is denied,
the Associate Administrator will no-
tify the applicant in writing and pro-
vide the reason for the denial. The
manufacturer may request that the As-
sociate Administrator reconsider the
decision. The application request
must—
(1) Be written in English and filed
within 60 days of receipt of the deci-
sion;
(2) State in detail any alleged errors
of fact and law; and
(3) Enclose any additional informa-
tion needed to support the request to
reconsider.
(i) Appeal. (1) A manufacturer whose
reconsideration request is denied may
appeal to the PHMSA Administrator.
The appeal must—
(i) Be written in English and filed
within 60 days of receipt of the Asso-
ciate Administrator’s decision on re-
consideration;
(ii) State in detail any alleged errors
of fact and law;
(iii) Enclose any additional informa-
tion needed to support the appeal; and
(iv) State in detail the modification
of the final decision sought.
(2) The PHMSA Administrator will
grant or deny the relief and inform the
appellant in writing of the decision.
PHMSA Administrator’s decision is the
final administrative action.
(j) Termination of a design type ap-
proval certificate. (1) The Associate Ad-
ministrator may terminate an approval
certificate issue under this section if it
is determined that, because of a change
in circumstances, the approval no
longer is needed or no longer would be
granted if applied for; information
upon which the approval was based is
fraudulent or substantially erroneous;
or termination of the approval is nec-
essary to adequately protect against
risks to life and property.
(2) Before an approval is terminated,
the Associate Administrator will pro-
vide the manufacturer and the ap-
proval agency—
(i) Written notice of the facts or con-
duct believed to warrant the with-
drawal;
(ii) Opportunity to submit oral and
written evidence, and
(iii) Opportunity to demonstrate or
achieve compliance with the applica-
tion requirement.
VerDate Mar<15>2010 15:30 Dec 30, 2010 Jkt 220213 PO 00000 Frm 00906 Fmt 8010 Sfmt 8010 Q:\49\X49\220213.XXX ofr150 PsN: PC150
897
Pipeline and Hazardous Materials Safety Admin., DOT § 178.71
(3) If the Associate Administrator de-
termines that a certificate of approval
must be withdrawn to preclude a sig-
nificant and imminent adverse affect
on public safety, the procedures in
paragraph (j)(2)(ii) and (iii) of this sec-
tion need not be provided prior to with-
drawal of the approval, but shall be
provided as soon as practicable there-
after.
[71 FR 33886, June 12, 2006, as amended at 71
FR 54397, Sept. 14, 2006]
§ 178.71 Specifications for UN pressure
receptacles.
(a) General. Each UN pressure recep-
tacle must meet the requirements of
this section. Requirements for ap-
proval, qualification, maintenance, and
testing are contained in § 178.70, and
subpart C of part 180 of this subchapter.
(b) Definitions. The following defini-
tions apply for the purposes of design
and construction of UN pressure recep-
tacles under this subpart:
Alternative arrangement means an ap-
proval granted by the Associate Ad-
ministrator for a MEGC that has been
designed, constructed or tested to the
technical requirements or testing
methods other than those specified for
UN pressure receptacles in part 178 or
part 180 of this subchapter.
Bundle of cylinders. See § 171.8 of this
subchapter.
Design type means a pressure recep-
tacle design as specified by a particular
pressure receptacle standard.
Design type approval means an overall
approval of the manufacturer’s quality
system and design type of each pres-
sure receptacle to be produced within
the manufacturer’s facility.
UN tube. See § 171.8 of this sub-
chapter.
(c) General design and construction.
UN pressure receptacles and their clo-
sures must be designed, manufactured,
tested and equipped in accordance with
the requirements contained in this sec-
tion.
(1) Following the final heat treat-
ment, all cylinders, except those se-
lected for batch testing must be sub-
jected to a hydraulic volumetric expan-
sion test.
(2) The standard requirements appli-
cable to UN pressure receptacles may
be varied only if approved in writing by
the Associate Administrator.
(3) The test pressure of UN cylinders,
tubes, and bundles of cylinders must
conform to the requirements in part
178 of this subchapter.
(d) Service equipment. (1) Except for
pressure relief devices, UN pressure r
本文档为【178.69-178.71】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑,
图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。