首页 收房验房九步走(I´ll take nine steps to the room)

收房验房九步走(I´ll take nine steps to the room)

举报
开通vip

收房验房九步走(I´ll take nine steps to the room)收房验房九步走(I´ll take nine steps to the room) 收房验房九步走(I'll take nine steps to the room) Walk to the house check-up room nine steps 1. Metope 1. Check for cracks in the walls. Check if the wall is free, knock on the wall with a small wooden hammer or something...

收房验房九步走(I´ll take nine steps to the room)
收房验房九步走(I´ll take nine steps to the room) 收房验房九步走(I'll take nine steps to the room) Walk to the house check-up room nine steps 1. Metope 1. Check for cracks in the walls. Check if the wall is free, knock on the wall with a small wooden hammer or something, and it's easy to hear when you're knocking on an empty drum. Make a mark, fill with putty when decorating. 3, check the metope of be bored with child, is it waterproof putty, can a bottle of mineral water, water to the wall, use hand to touch, to see whether have the mud, and no words demonstrate that wall of water resistant putty. Ii. Roof 1. Check the roof for cracks. 2. Check whether the yin-yang Angle line of the roof and metope is horizontal, if not, in the future decoration, please use the plaster cast to find the low and water resistant putty. Iii. Ground 1. Check whether the ground is flat. 2. Check whether there are cracks and anti-sand: do you have sand when the floor is rubbing the floor with your foot? Mortar ratio or cement quality unqualified, mixing uneven will appear this problem. 4. Doors and Windows 1. Check the strength of doors and Windows 2. Check the function of Windows A. The doors and Windows are smooth and smooth, the surface is smooth and smooth, without severe scratches, the profiles are not cracked or cracked. B. Hardware accessories: complete, location correct, firm C. Seal quality: fan and box when the doors and Windows are closed. There is no visible gap between fan and fan. Seal bars are not loose, not falling off, not exposed. D. door window frame, fan vertical, not bending E. The glass is free of pollution, no damage, no dust and water vapor in the double glass layer. The window of the window is open. No water will flow into the profile. V. circuit 1, check whether the socket and switch is set is reasonable, whether circuit in decorate need modification, one is the needs of the individual, 2 it is to look at the socket and switch Settings in the house is reasonable, easy to use. 2, check whether each light switch and electrical outlet can be normal use, carry a cell phone charger, or a pencil with can check whether the power socket electricity, of course, professional staff will use a special socket. Vi. Waterway Water main is to show kitchen, toilet. Toilet is generally 2 floor drain, a sewer pipe, a bathtub drain, a sink drain, see set whether reasonable, again according to decorate need to decide whether can be changed, but the concrete reform scheme is about to listen to the opinions of the experts. Most problems is that many people want to change implement plumbing, gain more space, but the reform implement down-flow pipe should be at the top of the down-flow pipe road way downstairs, easy to cause a lot of trouble, so as to prevent problems later downstairs owner is hard to agree to do such changes, so does not recommend myself do STH without authorization changes (using pad on the surface of the highlands is prone to poor drainage), listen to the opinions of the professionals. Gas pipeline The gas meter is a small space, and it is important to change the position of this table to listen to the opinions of professionals. Viii. Waterproof What is said here is waterproof, it refers to the water repellent of the kitchen guard. Of course, the house that is delivered now has some prior claims that it has not been made waterproof, which will need to be decorated. If the water is already waterproofed at delivery, we will have to verify whether the waterproofing is ready. If you don't try it before decorating, you'll find a leak when you're ready to do it, so the maintenance project will be big. You have to remove a new layer of ground to build a new layer of water. Acceptance of waterproof measure is: made a sill plugging with cement mortar toilet who's at the door, and then take a plastic bag to cover the drainage/nozzle, then bundle, then in the toilet water, shallow line (more than 2 cm). Then the property and owner of the downstairs property and owner will check whether the ceiling of the toilet of the toilet is leaking after 24 hours. 9. Inspection of pipes The pipe referred to here refers to a drainage/sewage pipe. It is the balcony and so on the discharge of the mouth, when the acceptance, takes a water of the utensil in advance, then pour water into the drain port. See if the water runs smoothly. Why should we accept this? Because during the construction of the project, some workers usually "steal" the work when cleaning. Pour some cement into the drain, and if the cement is more viscous, it will be blocked at the elbow, making it difficult to drain. There's another case, but it's not closed. That is to see whether the sewage pipe has a water - prevention curve. According to experience, if the drainage tube does not hold water to prevent stink, then the overall quality of the house will have to be 12 points. Why the blowpipe needs this bend, because the bend will hold water, so that the stench from the lower pipes will get in the way. Without elbow, the washroom and lavatory drain gives off a peculiar smell. There may be a development chamber that thinks that it can be used to prevent stink, and the practice of the project proves that it is far from enough to meet the actual needs. And because of this small place, often can best reflect the construction quality of the builder. Special warning: the drainage pipe in the lower part of the general bathtub has the back water bend, while the other position does not have, need to install anti-odor floor leak! Small hint: wait for potential protection device, basically be to the kitchen and toilet such relatively damp environment to carry out electric leakage protection. Metal such as under the sink below have the stainless steel pipe, use a line, line (not less than 4 square) with stainless steel pipe connected to after receiving this box, prevent the moisture out of the leakage, protection. Are mandatory in senior decoration, home decoration Almost everyone didn't notice this, and then have a nut under such as cast iron bathtub, is also used for connection here, so don't seal the equipotential box. 1 plastic washbasin - used for acceptance of water piping (with a certain amount of water) 1 small hammer - used to check whether the wall and ground of the house are empty drums 1 gauge - to measure the width of the crack A 5 meter measuring tape - used to measure the height of the house (mainly for housing) 1 multimeter - used to test whether the power sockets and weak electrical outlets are unimpeded 1 calculator - - for calculating data 1 water pen - for signature 1 broomstick - used to clean indoor health 1 small stools and a few newspapers, plastic bands, and packing ropes -- for long periods of time, rest and pre-closed plumbing. Normal acceptance of the house usually lasts 2-3 hours
本文档为【收房验房九步走(I´ll take nine steps to the room)】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_219945
暂无简介~
格式:doc
大小:24KB
软件:Word
页数:0
分类:生活休闲
上传时间:2018-02-01
浏览量:15