首页 船舶加油操作Bunkering Operations

船舶加油操作Bunkering Operations

举报
开通vip

船舶加油操作Bunkering OperationsBunkering Operations: Precautions, Checklists, Calculations & Corrections Explained An actual bunkering operation is carried out with bunker checklists. In this article, emphasis is made on the checklists, safety precautions, SOPEP locker and SOPEP equipment,...

船舶加油操作Bunkering Operations
Bunkering Operations: Precautions, Checklists, Calculations & Corrections Explained An actual bunkering operation is carried out with bunker checklists. In this article, emphasis is made on the checklists, safety precautions, SOPEP locker and SOPEP equipment, temperature and density correction to calculate the quantity of oil bunkered. The formula for calculation has been included Bunkering Oil Earlier we learned about the bunkering and what is means. Now we will study the process of actual bunkering operations and the practical details of the process of bunkering oil. All types of ships needs fuel oil, lube oil, etc. and hence it is important for everyone to understand the actual process of bunkering, so here we go. Pre-bunkering preparations. The most important aspect of bunkering operation are the "checklists", which form a part of company's safety management system (SMS) and I.S.M.,eliminating the possibility and negligence of human and other operational errors. The pre-bunkering checklist must be followed in-consultation with the Chief Engineer (C/E), as he is the person-in-charge for the bunkering operation. Before bunkering, usually it is 4th engineering officer, taking "soundings" of bunker tanks and calculates the volume of fuel oil available in every fuel oil tank of the ship. Then a Bunker-plan is made to plan the distribution of total quantity of bunker fuel oil. Bunker Procurement Ordering of Bunker oil: The ship Managers (superintendents) monitor the performance of a fleet of ships. For example, on owning a car, we tend to keep a check on its fuel consumption widely called as "mileage." It is the distance travelled by the vehicle for a unit volume of fuel used. In the same way, as the ship consumes humungous quantity of fuel, whose costs are forming the major part of ship's operation. Managers tend to keep a check on it. This is measured in terms of specific fuel oil consumption of the main propulsion engine. Upon knowing the fuel oil consumption for a day and the next voyage plan, the quantity of fuel oil required is calculated and compared with the available bunker tank capacity. A requisition is placed through the C/E and Master of the vessel to the Managers. The requisition is processed and evaluated for the quality and quantity of fuel to be supplied for the particular ship. Planning is done for the delivery of bunker at a particular port where the oil is available at a comparitive lesser cost. On taking all these aspects into consideration, the Managers, deliver bunker to the vessel. Upon receiving the bunker, a sample collected during bunkering operation is sent for lab analysis to confirm the delivered oil meets the required standard for the safe and efficient operation of the auxiliary engines & main propulsion engine. Pre-Bunker Checklist 1. State of adjacent waters noticed 2. Vessel properly secured to dock 3. Check suppliers product corresponds to ordered product 4. Agree quantity to be supplied 5. Check valves open 6. Day tanks full and supply valves closed 7. Warning signs in position e.g. No Smoking 8. SOPEP plan available 9. Clean up material in place 10. Oil Boom in place 11. Foam fire extinguisher placed at bunker station 12. Alfa Laval and transfer pumps off 13. Fuel tank supply valves open 14. Agree stop/start signals between vessel and barge/truck 15. Bravo flag flying/red light showing 16. Agree pumping/transfer rate 17. Agree emergency shut down procedure 18. Specification sheet received 19. Check hose and couplings are secure and in good order 20. Fuel nozzle and hose secured to vessel 21. Check barge/truck meters Reading: 22. Check on board meters Reading: 23. Bunker Valve open 24. Unused manifold connections blanked off 25. Master informed 26. Signal pumping to commence The above checklist has to be completely filled religiously by both the ship & barge personnel. Please move on to the next page by clicking below Image Credits Automated Bunker Procurement Flowchart: Calsoft Enterprise Solutions, USA SOPEP equipments At the bunker manifold and wherever necessary, as per the ships SOPEP plan, the SOPEP equipments should be kept in immediate readiness in order to avoid oil spill/pollution during bunkering operation. SOPEP- Shipboard Oil Pollution Emergency Plan. The SOPEP Locker must have minimum of the below specified items: 1. absorbent roll 2. absorbent pads 3. absorbent granules 4. absorbent materials 5. brooms 6. shovels 7. mops 8. scoops 9. empty receptacles (200 ltrs capacity) 10. portable air driven pumps 11. oil boom 12. oil spill dispersants. These items must be stowed in an easily accessible locker, clearly marked, and is to be brought on deck ready for immediate use, prior to all oil transfer operations. During Bunkering Procedures - Checklist 1. Witness taking and sealing of 2 representative product samples 2. Monitor fuel connections for leaks fuel flow and control tank levels 3. Change over of tanks whenever necessary. 4. Checking the rate at which bunkers are received. 5. Checking the tightness/slackness of mooring ropes. 6. Checking trim/list of the bunker barge & the ship. 7. Continuous monitoring/look outs for the vessel's position(when at anchor). During bunkering, the above checklist must be filled up and continuous monitoring of the above secified items are required till the bunkering operation is complete.
本文档为【船舶加油操作Bunkering Operations】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_337177
暂无简介~
格式:doc
大小:24KB
软件:Word
页数:0
分类:生产制造
上传时间:2019-03-27
浏览量:23