首页 视觉传达-卷纸艺术

视觉传达-卷纸艺术

举报
开通vip

视觉传达-卷纸艺术视觉传达-卷纸艺术 视觉传达设计艺术家-----卷纸条的艺术 现居住于伦敦的俄罗斯艺术家 Yulia Brodskaya 用再平凡不过的彩色纸条创造出了一个个色彩缤纷,创意十足的作品。Yulia Brodskaya的作品无论在色彩还是造型方面都表现的十分出众,这大概和她的插画家和平面设计师的身份是分不开,每件作品都充满了灵动和愉悦的符号,仿佛带领我们走入到一个奇妙的世界。看Yulia Brodskaya的作品总是忘不了仔细观察细节,因为每个地方都经过了艺术家的精心安排,都那么引人入胜。 看了如下她的彩色卷纸...

视觉传达-卷纸艺术
视觉传达-卷纸艺术 视觉传达设计艺术家-----卷纸条的艺术 现居住于伦敦的俄罗斯艺术家 Yulia Brodskaya 用再平凡不过的彩色纸条创造出了一个个色彩缤纷,创意十足的作品。Yulia Brodskaya的作品无论在色彩还是造型方面都表现的十分出众,这大概和她的插画家和平面设计师的身份是分不开,每件作品都充满了灵动和愉悦的符号,仿佛带领我们走入到一个奇妙的世界。看Yulia Brodskaya的作品总是忘不了仔细观察细节,因为每个地方都经过了艺术家的精心安排,都那么引人入胜。 看了如下她的彩色卷纸条作品,你就知道我们的思维是多么的狭隘,创意是多么的奇缺了。 of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding welding following the end of each review, responsibility and prevention of welding, welding wrong. Requirements for welding personnel certified, and welding before welding training, select skills good sense to carry out construction, welding quality inspection and acceptance every day to ensure that the welding ... All unreleased material sampling, invited supervision engineers arrived at the scene, after confirmation by the supervising engineer, seal immediately sent authorized bodies in accordance with the requested test indicator test, according to the inspection report and approved by the supervising engineer to review and then transported for the construction. Amount of insulation materials shall
本文档为【视觉传达-卷纸艺术】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_721103
暂无简介~
格式:doc
大小:795KB
软件:Word
页数:0
分类:生活休闲
上传时间:2017-10-06
浏览量:13