首页 《中国移动通信集团广东有限公司IP城域网工程》验收测试规范

《中国移动通信集团广东有限公司IP城域网工程》验收测试规范

举报
开通vip

《中国移动通信集团广东有限公司IP城域网工程》验收测试规范《中国移动通信集团广东有限公司IP城域网工程》验收测试规范 中国移动广东公司IP城域网工程 测试验收规范 中国移动通信集团广东有限公司 the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of accuracy and consist...

《中国移动通信集团广东有限公司IP城域网工程》验收测试规范
《中国移动通信集团广东有限公司IP城域网 工程 路基工程安全技术交底工程项目施工成本控制工程量增项单年度零星工程技术标正投影法基本原理 》验收测试规范 中国移动广东公司IP城域网工程 测试验收规范 中国移动通信集团广东有限公司 the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottom 目 录 1. 测试验收要求............................................................................................................ 1 2. 测试验收 方案 气瓶 现场处置方案 .pdf气瓶 现场处置方案 .doc见习基地管理方案.doc关于群访事件的化解方案建筑工地扬尘治理专项方案下载 概述..................................................................................................... 1 3. 测试验收方案内容..................................................................................................... 3 3.1. 单点测试..................................................................................................... 3 3.1.1. 设备加电测试....................................................................................... 3 3.1.2. 电源风扇冗余测试................................................................................ 4 3.1.3. 引擎板冗余性测试................................................................................ 4 3.1.4. 交换板冗余性测试................................................................................ 5 3.1.5. 端口板卡热插拔测试 ............................................................................ 6 3.1.6. 端口光发射接收功率测试 ..................................................................... 6 3.1.7. 端口测试.............................................................................................. 7 3.1.8. UTP连通测试 ...................................................................................... 7 3.1.9. 软硬件配置测试 ................................................................................... 8 3.2. 网内连通性测试 .......................................................................................... 9 3.2.1. 链路测试.............................................................................................. 9 3.2.2. 路由连通性测试 ................................................................................... 9 3.2.3. 路由协议与策略测试 .......................................................................... 10 3.2.4. SR连接CR,SR连接SR的备份路由测试...........................................11 3.2.5. SR之间的流量负载分担测试 .............................................................. 12 3.2.6. MPLS测试......................................................................................... 12 3.2.7. 网管测试............................................................................................ 15 3.2.8. QOS测试........................................................................................... 18 3.2.9. 时延测试............................................................................................ 19 3.2.10. 抖动测试............................................................................................ 20 3.2.11. 丢包................................................................................................... 21 3.3. 接入CMNet后联网测试.............................................................................. 22 3.3.1. 与CMNET互联端口状态测试 ............................................................ 22 3.3.2. 链路测试............................................................................................ 22 3.3.3. 到CMNET骨干连通性测试................................................................ 23 3.3.4. 域间路由连通性测试 .......................................................................... 23 3.3.5. 到Internet的路由连通性测试 ............................................................. 24 3.3.6. 到CMNET路由备份测试 ................................................................... 25 3.3.7. 到CMNET路由负载分担测试 ............................................................ 25 3.3.8. 跨域VPN业务测试 ............................................................................ 26 3.3.9. 跨域 HUB-SPOKEN VPN业务测试 ................................................. 27 3.3.10. 跨域VPN路由备份测试 ..................................................................... 27 3.4. 连接宽带认证系统测试.................................................. 错误~未定义书签。 3.4.1. PPPoE认证测试 ..................................................... 错误~未定义书签。 3.4.2. Wlan业务认证测试 ................................................ 错误~未定义书签。 3.4.3. 专线业务测试......................................................... 错误~未定义书签。 4. 结论........................................................................................................................ 32 4.1. 遗留问题....................................................................... 错误~未定义书签。 the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe 2 中国移动广东公司IP城域网工程测试验收规范 4.2. 测试结论................................................................................................... 32 5. 签字........................................................................................................................ 33 6. 附录及附件 ............................................................................................................. 34 the same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half coupling constant, should also be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the two radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of the rotor, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring process in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance between the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not allowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed coupling. Coupling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator, the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to the original position, circumference of dial gauge reading should be able to go back to the original value. When measuring the clearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gasket with the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mounting support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface height difference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key insertion installation complex measuring cylinder in axial position. Bottom 中国移动广东公司IP城域网工程测试验收规范 1. 测试验收要求 系统的测试和验收是对工程项目进行全面监控、保证工程质量的关键。系统的测试是整个工程实施计划中的一个重要组成部分,工程实施中每个阶段的测试工作则是对该阶段工作的总结,反映了阶段工作的工作成绩和工程质量,是下一个阶段工程实施的基础,上一阶段工程质量的好坏会直接影响下一个阶段的工程质量和工程进度,影响到整个工程的进度以及整个网将来的运行状况。因此,作为工程质量的反映,测试工作是整个工程实施中的一个最重要的环节。 整个工程的全部测试工作,应该由建设单位、厂家和系统集成商共同承担,系统集成商为主,厂家、建设单位配合。项目实施的每一个阶段,由系统集成商、厂家制定测试方案,经过建设单位认可,提供测试必需的测试工具,并在系统集成商和厂家的监督指导下,由技术人员实施测试方案并提交相应的测试报告,所有的测试结果和测试报告都将作为重要的技术资料存档保存。 要作好测试工作,需要有一个详细而切实可行的测试方案。整个工程的测试方案是整个工程实施计划的一部分。本文件共分为单点测试、网内连通性测试以及接入CMNet后联网测试三部分内容,分别针对工程实施的三个不同阶段进行测试验收的方案。 本文件提供工程测试方案概要,并提供每一步测试工作的内容和手段。具体的测试方案由系统集成商和厂家在正式测试前提供给建设单位。 2. 测试验收方案概述 系统验收测试的常用内容以及方法,如下面所示: (1)连通性测试 从网络中某一节点可达到网络中其它任何网段。此测试可通过Ping命令来实现。正常情况下,应能收到相应(echo reply). 若出现超时 (time out)或网络不可达(no route to destination), 则 说明 关于失联党员情况说明岗位说明总经理岗位说明书会计岗位说明书行政主管岗位说明书 网络的连通 性出现了问题。 随机选取网络中两个节点,从一点向另外一点执行ping操作,记录数据包返回时间。 (2)性能测试 在网络中随机选取边缘层服务节点,与网络核心层预设的服务系统建立服务连接,测试在服务速率所能达到的极限,以及在服务速率极限状态时时,网络服务的稳定性,网络数据流的丢包 1 率。 (3)稳定性测试 在网络的边缘选取具有典型代表的边缘服务节点,在几个边缘节点间施加模拟流量,观察网络的稳定性。 (4)容错测试 在施加流量的基础上,进行完稳定性测试之后,可以对测试的路由器设备,包括边缘节点和流量经过的核心路由器节点,进行以下容错测试:拔插路由引擎;拔插交换引擎;拔插电源;冗余链路拔插光纤等测试内容,计算链路的丢包率和时延抖动。 (5)安全性测试 对路由器进行相关的安全配置,包括:管理用户权限配置;管理地址配置;同时并发的访问数量控制;非法用户登陆跟踪;路由引擎抗攻击测试;正确配置后,相关的对路由器设备的非法攻击都将被拒绝和日志记录。 验收测试,主要包括了单点测试和全网测试两部分。以下分为两节来重点阐述本验收测试规范的内容。 sertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cou2 中国移动广东公司IP城域网工程测试验收规范 3. 测试验收方案内容 3.1.单点测试 3.1.1. 设备加电测试 测试对象:路由器、交换机 测试目的:测试设备电源端接是否正确,电源线标签是否符合规范,设备启动过程是否正常 测试平台:从CONSOLE口登录至设备 测试流程: 1. 检查设备电源线端接是否符合规范; 2. 如果设备装配有多个电源模块,需检查它们是否分别接入到列柜的不同输出电源; 3. 检查电源线标签是否符合规范; 4. 设备加电,检查设备自检过程的终端输出; 5. 观察电源、风扇框、机框、板卡等指示灯; 预期结果: 1. 电源线端接符合规范; 2. 如果设备装配有多个电源模块,它们与列柜A/B 路入电之间的对应关系符合要求; 3. 设备加电自检过程正常; 4. 各指示灯应正常显示; 测试工具:PC终端(命令行输出),目测 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工 文明施工目标施工进度表下载283施工进度表下载施工现场晴雨表下载施工日志模板免费下载 单位: 3 3.1.2. 电源风扇冗余测试 测试对象:路由器,交换机 测试时间:加电测试后 测试目的:验证电源模块、风扇模块具备冗余能力 测试平台:从CONSOLE口登录至设备 测试流程: 1. 当多个电源、风扇同时运行情况下将任意一个具备冗余保护的电源关闭,检查设备的运行状态是否发生变化。 2. 当风扇有单独外引电源时,将任意一个风扇的电源关闭,检查设备的运行状态是否发生变化。 预期结果: 将任意1个具备冗余保护的电源或者风扇关闭,设备的运行状态不会发生变化,各接口板卡状态不会发生变化 测试工具:PC终端(命令行输出),目测 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.1.3. 引擎板冗余性测试 测试对象:路由器、交换机 测试目的:验证设备引擎板具备冗余能力 测试平台:从CONSOLE口登录至设备 测试流程: 1、手工将master状态的引擎板等从机箱中拔出来模拟master板卡失效; 2、观察另外一块引擎网板的LED状态 3、用TELNET或CONSOLE登录,查看系统和板块状态 4、将拔出的引擎/交换网板复原 5、观察引擎/交换网板的LED状态。 6、登录设备,使用命令软切换主备引擎,再次观察引擎/交换板和接口板的LED状态。 learance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet wit4 中国移动广东公司IP城域网工程测试验收规范 预期结果: 当master的引擎失效后,或者使用命令切换主备引擎,standby的引擎会自动接管,板上的mst LED会变成绿色,设备工作不间断,各接口板卡状态不会发生变化。 测试工具: PC终端(命令行输出),目测 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.1.4. 交换板冗余性测试 测试对象:路由器(CR、SR、BRAS) 测试目的:验证设备交换板具备冗余能力 测试平台:从CONSOLE口登录至设备 测试流程: 1、将一块交换板从运行的系统中拔出; 2、另外其他交换板的LED状态; 3、用TELNET或CONSOLE登录,查看系统和板块状态; 4、插回拔出的交换板 5、对所有交换板逐一执行相同操作 预期结果: 设备交换路由板具备冗余能力,任一块交换板失效不会影响设备的运行 测试工具:PC终端(命令行输出),目测 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 5 3.1.5. 端口板卡热插拔测试 测试对象:路由器、交换机 测试目的:验证设备端口板卡具备热插拔能力 测试平台:从CONSOLE口登录至设备 测试流程: 1. 逐一拔出运行中的设备端口板块,再插回设备 2. 用TELNET或CONSOLE登录,查看系统和板块状态 3(对设备所有端口板块进行相同的操作 预期结果: 1. 端口板块热插拔不影响设备正常工作,板块插回后系统工作正常,端口指示灯正常 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.1.6. 端口光发射接收功率测试 测试对象:路由器、交换机 测试目的:测试设备端口的光发射接收功率 测试平台:光功率计 测试流程: 用光功率计测量GE 端口和POS端口的光发射和接收功率(接收功率仅在端口开通了链路的情 况下测量),并记录在备注中(见附件); 预期结果: 设备GE端口和POS端口的发射和接收功率应符合厂家规范 (具体厂家光模块的收发光功率见 附录) 测试工具:光功率计 测试时间: 测试人员: 测试结果: learance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet wit6 中国移动广东公司IP城域网工程测试验收规范 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 工程100%,抽测20% 3.1.7. 端口测试 测试对象:路由器、交换机 测试目的:检查设备所有的光口是否正常工作(包括10GPOS、2.5GPOS、GE、10GE等端口) 测试平台: 测试流程: 1、用一根光纤连接GE端口或POS端口的RX和TX, 打硬件环,观察是否所有GE状态指示灯呈现绿色。(注意如果光模块发射距离超过10公里,需要增加光衰后打环) 预期结果: 1、端口指示灯状态正常 测试工具:目测 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 工程100%,抽测20% 3.1.8. UTP连通测试 测试对象:交换机 测试目的:检查UTP线路以及交换机以太网端口是否正常工作 测试平台:线路测试仪 测试流程: 1、在UTP配线架用线路测试仪对交换机的端口进行测试 预期结果: 1、交换机以太网端口工作正常,UTP线路正常 测试工具:线路测试仪 测试时间: 测试人员: 测试结果: 7 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 工程100%,抽测20% 3.1.9. 软硬件配置测试 测试对象:路由器、交换机 测试目的:查看设备硬件和软件配置情况 测试平台:从console口接入或远程登录到设备 测试流程: 1、从外观上,观看设备硬件装备; 2、查看设备硬件配置; 3、查看系统端口状态 4、查看系统环境状态; 5、检测系统日志信息; 6、检查软件版本 预期结果: 1、装备外观完好。 2、显示设备机箱配置情况;接口卡配置情况;子接口卡配置情况;端口配置情况。最终得出: 接口板信息应与配置清单相符。 3、显示路由器所有配置。包括主机名,各端口地址、描述、状态,口令加密等。 4、显示路由器存在port及状态。 5、显示的环境信息。 6、显示的LOG信息。 7 设备软件版本满足设计要求,同种设备的软件版本应统一 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: original position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gask8 中国移动广东公司IP城域网工程测试验收规范 3.2. 网内连通性测试 3.2.1. 链路测试 测试对象:路由器(CR、SR) 测试目的:检查路由器链路连通情况。 测试平台:从console口接入或远程登录到设备 测试流程: 1、Ping的路由器的对端设备端口地址,检查链路状态 2、Ping选取大包4470,数量1000 3、逐一检查与路由器相邻的交换机/路由器链路情况 预期结果: 1、路由器的链路正常,Ping回包正常 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.2. 路由连通性测试 测试对象:路由器(CR、SR) 测试目的:检查路由器和网内其他设备的路由连通情况。 测试平台:从console口接入或远程登录到设备 测试流程: 1、用Ping命令ping 其他路由器的Loopback地址 2、对所有其他路由器至少Ping一次 2、用traceroute命令trace其他路由器Loopback地址,检查路由情况 。 预期结果: 1、到其他路由器正常联通 2、所经的路径与设计相符。 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 9 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.3. 路由协议与策略测试 3.2.3.1 IS-IS协议 测试对象:路由器(CR、SR) 测试目的:检查路由器的IS-IS路由协议。 测试平台:从console口接入或远程登录到设备 测试流程: 1、检查该路由器的IS-IS信息 2、检查该路由器的IS-IS邻居信息 3、检查该路由器使能了IS-IS的端口信息 4、检查IS-IS链路状态数据库的信息 预期结果: 1、正确显示出该路由器的IS-IS信息:System ID、IS Levels。 2、正确显示出该路由器的IS-IS邻居。 3、正确显示出该路由器使能了IS-IS端口的信息。 4、正确显示IS-IS链路状态数据库的信息。 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.3.2 BGP协议 测试对象:出口路由器(CR) 测试目的:检查出口路由器CR的BGP路由协议。 测试平台:从console口接入或远程登录到设备 测试流程: 1、检查相邻BGP Neighbor的状态信息。 2、显示BGP路由表信息 3、观察列表中BGP Path项 4、观察BGP协议工作情况 5、分别检查两个CR的IPv4和Vpn V4地址簇BGP协议情况 sertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cou10 中国移动广东公司IP城域网工程测试验收规范 预期结果: 1、正确显示 BGP neighbor及有关信息。 2、正确显示BGP路由表,包括直接和间接相连的AS的列表。 3、显示从本路由器到对方网络所经的网络,以AS number表示。 4、显示BGP协议工作情况。 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.4. SR连接CR,SR连接SR的备份路由测试 测试对象:路由器(SR) 测试目的:检查路由器SR上连CR,SR之间的路由备份,保证核心网络的可靠性。 测试平台:从console口接入或远程登录到设备。 测试流程: 1、 选取一个SR,配置业务网段,用一台PC(PC1)下挂SR,在另外一个SR配置业务网段, 用另外一台PC(PC2)下挂该SR 2、 在PC1上连续Ping 两个CR(Loopback地址)和PC2,并用Trace命令检查到CR和PC2 所经路由 3、 分别关闭SR与CR的直连端口(每次关闭一条) ,模拟SR与CR中断情况 4、 再用trace命令观察PC1到两个CR,PC1到PC2所经路由, 5、 放开步骤3关闭的端口,关闭两个CR的直连端口 ,模拟CR之间链路中断情况 6、 再用trace命令观察PC1到两个CR,PC1到PC2所经路由。 7、 观察PC1连续Ping 两个CR和PC2情况 预期结果: 1、SR到CR的路由为设计最佳路由 2、SR与CR链路中断后,显示的路由为备份路由。 3、SR和CR之间任一条链路中断,不影响SR到CR以及SR之间的连通性 测试工具:PC终端 测试时间: 测试人员: 测试结果: 11 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.5. SR之间的流量负载分担测试 测试对象:路由器(SR) 测试目的:检查路由器SR上连CR的路由备份,保证核心网络的可靠性。 测试平台:从console口接入或远程登录到设备。 测试流程: 1、 选取一个SR(SR1),配置业务网段,用一台PC(PC1)下挂SR,在另外一个SR(SR2)配 置业务网段,用另外一台PC(PC2)下挂SR2 2、 在PC1上Trace PC2,检查PC1到PC2的IP路由 3、 改变SR2和PC2的设置,配置不同的IP段(PC2用不同的IP地址) 4、 再次用Trace命令检查PC1到PC2的IP路由 5、 重复步骤4和步骤5至少8次,对比PC1到PC2路径的变化 预期结果: 1、PC1到PC2之间有两条不同路径,SR之间的业务路由实现负载均衡。 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.6. MPLS测试 3.2.6.1 LDP测试 测试对象:路由器(SR,CR) 测试目的:检查LDP协议。 测试平台:从console口接入或远程登录到设备 sertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cou12 中国移动广东公司IP城域网工程测试验收规范 测试流程: 1、检查该路由器的LDP Peer关系 2、检查该路由器运行LDP的端口信息 3、检查LIB数据库信息 4、检查LDP Session状态消息 预期结果: 1、 正确显示出该路由器的LDP Peer。 2、 正确显示出该路由器运行LDP端口的信息。 3、 显示LIB数据库信息。 4、 显示LDP状态信息。 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.6.2 VPLS测试 测试对象:路由器(SR) 测试目的:验证路由器否能正常建立VPLS业务。 测试原则:每个地市选取两个SR开通一个VPLS业务进行测试 测试平台:路由器,交换机及PC 测试流程: 1、在域内两个SR配置VPLS 业务, 2、两台PC模拟VPLS VPN用户,分别连接两个SR 3、两台PC相互之间ping 预期结果: 1、两台测试PC正常连通。 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.6.3域内VPN业务测试 13 测试对象:路由器(SR) 测试目的:检查域内VPN用户之间的网络连通性。 测试原则:每个地市选取两个SR开通一个VPN业务进行测试 测试平台:路由器,交换机及PC 测试流程: 1、 在域内两个SR各配置MPLS VPN-A和VPN-B 两个VPN站点 2、 VPN-A 和VPN-B配置相同的RD和RT 3、 用一台PC作为VPN-A的用户主机,PC的默认路由指向VPN-A的VRF地址 4、 在VPN-A用户主机上ping VPN-B的VRF地址,检查包是否能通过 预期结果: 1、Ping成功,VPN-A主机可以连通VPN-B 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.6.4域内相同AS的 VPN业务测试 测试对象:路由器(SR) 测试目的:检查域内相同AS号的VPN用户之间的网络连通性。 测试原则:每个地市选择两个SR开通一个VPN业务进行测试 测试平台:路由器,交换机 测试流程: 1、 在域内两个SR各配置MPLS VPN-A和VPN-B 两个VPN站点 2、 VPN-A 和VPN-B配置相同的RD和RT 3、 用两台路由器(也可用汇聚交换机3层接口模拟)分别模拟CE1和CE2作为VPN-A和VPN-B 的用户路由器,并和PE之间走BGP协议 4、 VPN-A和VPN-B的AS号配置成一样 5、 在PE上配置AS-Overide 6、 在用户路由器CE上查看BGP路由条目 7、 在用户路由器CE1上Ping另一个用户路由器CE2的地址 预期结果: 1、 用户路由器CE上能学到另一端CE的BGP路由 2、 用户路由器CE地址能相互Ping通 测试工具:PC终端(命令行输出) 测试时间: 测试人员: learance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet wit14 中国移动广东公司IP城域网工程测试验收规范 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.6.5 宽带接入服务认证功能测试 测试对象:路由器(BRAS) 测试目的:检查宽带接入服务器的认证功能 测试平台:宽带接入服务器,交换机,PC 测试流程: 1、 如果Radius未连接,需在宽带接入服务器BRAS配置本地账户 2、 PC机通过汇聚交换机连接BRAS 3、 PC机用BRAS的账户使用PPPOE方式进行登录认证 4、 每个地市每个BRAS选下挂的一个SW进行测试 预期结果: 1、 PC认证登录成功 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.7. 网管测试 3.2.7.1 设备登陆管理测试 测试对象:交换机、路由器 测试目的:用Telnet进行网管。 测试平台: PC 15 测试流程: 1、 PC和交换机之间使用IP连接; 2、 用PC机上的telnet终端进行登录; 3、 尝试使用设备默认的用户名密码进行登陆 4、 对设备配置,只允许特定的源地址段进行登录 5、 再次尝试进行登陆 预期结果: 1、设备的默认用户名和密码关闭,不能进行登录 2、设备的登录访问控制有效,只允许特定网段进行登录。 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.7.2 设备SNMP管理测试 测试对象:交换机、路由器 测试目的:用SNMP协议对设备进行网管。 测试平台: PC 测试流程: 1、 PC和交换机之间使用IP连接; 2、 PC使用SNMP管理软件,尝试用Public密码对设备进行SNMP读和写 3、 配置正确的SNMP读写密码,查看设备的SMNP管理信息库(MIB) 4、 对设备进行配置,只允许特定的地址段对设备进行SNMP管理 预期结果: 1、使用SNMP管理设备必须配置正确的密码,Public默认密码关闭 2 使用SNMP管理软件可以查看设备的MIB 3 设备的SNMP访问列表有效,只允许特定网段对设备进行SNMP管理 测试工具:PC终端 测试时间: 测试人员: 测试结果: ht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key in16 中国移动广东公司IP城域网工程测试验收规范 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.7.3 带外网管测试 测试对象:交换机、路由器 测试目的:测试用带外网管方式对设备进行网管连通测试。 测试平台: PC 测试流程: 1、配置设备带外网管端口 2、通过PC和设备的带外网管端口进行连接,进行Ping和登录。 预期结果: 1、PC可以通过设备的带外网管端口对设备进行管理 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.7.4 各厂家网管软件测试 测试对象:交换机、路由器 测试目的:各厂家网管软件系统调测。 测试平台: 各厂家网管系统 测试流程: 见各厂家测试内容 预期结果: 1、测试结果符合厂家测试手册 附:各厂家网管验收手册 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 17 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.8. QOS测试 3.2.8.1 单机QOS测试 测试范围:IP城域网示范点(肇庆、惠州)选择一个汇聚交换机和SR路由器 测试对象:路由器、交换机 测试目的:测试交换机和路由器的QoS指标、标记和保障是否达到要求 测试前提: 1. 设备已正常上电,并通过单点测试。 2. 启动计算机的超级终端功能,能够通过Console 口登录到路由器或交换机上 3. 网络结构已经搭建完成,已能实现基本的功能 4. 设备启用QoS 功能 5. 测试仪器与现网待测设备正确连接 6. 待测网络需启用QoS 功能 测试流程: 1. 根据所选用的QoS 保证措施,检查网络设备中有关的QoS 配置内容。 2. QOS 标记路由测试:用测试仪构造报文,配置重新标记规则,将指定流的DSCP或COS域标记为所需数值,然后发送报文;在路由器的流量入接口使能重新标记,在流量出接口捕获报文。 3. 基于DSCP或COS域的QOS保证测试:测试仪配置6 个测试流进行发送,包头DSCP域或COS域分别是EF、AF1、AF2、AF3、AF4 和BE,在待测设备的与测试仪相连的流量出接口上进行队列带宽保证。各流发送15M 流量,增大普通BE 流的流量使待测设备流量出接口的链路过载,记录各种流的吞吐量。 预期结果: 1. QoS 配置正确,能确保重要业务量不受延迟或丢弃。 2. 启动重新标记,捕获到报文均为EF流;关闭重新标记,捕获到报文的DSCP或COS值为原来的值。 3. EF,AF 流量能保证流量,无丢包。BE 流量有丢包,无法保证带宽。 测试工具:PC终端(命令行输出),网络测试仪 测试时间: 测试人员: 测试结果: ference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottom18 中国移动广东公司IP城域网工程测试验收规范 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.8.2 系统QOS测试 测试范围:IP城域网示范点(肇庆、惠州)选择一个汇聚交换机连接网络测试仪 测试对象:路由器、交换机 测试目的:测试系统的QoS指标、标记和保障是否达到要求 测试前提: 1. 设备已正常上电,并通过单点测试。 2. 启动计算机的超级终端功能,能够通过Console 口登录到路由器或交换机上 3. 网络结构已经搭建完成,已能实现基本的功能 4. 设备启用QoS 功能 5. 测试仪器与现网待测设备正确连接 6. 待测网络需启用QoS 功能 测试流程: 1. 搭建测试环境,使网络流量从网络测试仪出发,经过汇聚交换机,SR,CR,再从SR,到达汇聚交换机,从汇聚交换机的另一个端口返回网络测试 2. 根据所选用的QoS 保证措施,检查网络设备中有关的QoS 配置内容。 3. QOS 标记路由测试:用测试仪构造报文,配置重新标记规则,将指定流的DSCP域标记为所需数值,然后发送报文;在路由器的流量入接口使能重新标记,在流量出接口捕获报文。 4. 基于DSCP的QOS保证测试:测试仪配置6 个测试流进行发送,包头DSCP域分别是EF、AF1、AF2、AF3、AF4 和BE,在网络设备的流量出接口上进行队列带宽保证。各流发送15M 流量,增大普通BE 流的流量使待测设备流量出接口的链路过载,记录各种流的吞吐量。 预期结果: 1. QoS 配置正确,能确保重要业务量不受延迟或丢弃。 2. 启动重新标记,捕获到报文均为EF流;关闭重新标记,捕获到报文的DSCP或COS值为原来的值。 3. EF,AF 流量能保证流量,无丢包。BE 流量有丢包,无法保证带宽。 测试工具:PC终端(命令行输出),网络测试仪 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.9. 时延测试 测试范围:IP城域网示范点(肇庆、惠州)选择一个汇聚交换机连接网络测试仪 19 测试对象:路由器,交换机 测试目的:测试路由器,交换机在一定负荷状态下的时延 测试平台:网络测试仪 测试流程: 1、 搭建测试环境,使网络流量从网络测试仪出发,经过汇聚交换机,SR,CR,再从SR,到 达汇聚交换机,从汇聚交换机的另一个端口返回网络测试仪 2、 配置相应的业务路由 3、 测试包负荷为端口带宽80% 4、 分别测试3个典型长度包的时延(64,512,1518) 5、 每次测试时间大于120秒 预期结果: 1、 因目前尚未有统一的测试 标准 excel标准偏差excel标准偏差函数exl标准差函数国标检验抽样标准表免费下载红头文件格式标准下载 值,根据IP承载网测试参考指标以及省内实际情况,建议 标准为数据包系统时延小于10ms 测试工具:PC终端(命令行输出),网络测试仪 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.10. 抖动测试 测试范围:IP城域网示范点(肇庆、惠州)选择一个汇聚交换机连接网络测试仪 测试对象:路由器,交换机 测试目的:测试路由器,交换机在一定负荷状态下的时延抖动 测试平台:网络测试仪 测试流程: 1、 搭建测试环境,使网络流量从网络测试仪出发,经过汇聚交换机,SR,CR,再从SR,到 达汇聚交换机,从汇聚交换机的另一个端口返回网络测试仪 2、 配置相应的业务路由 3、 测试包负荷为端口带宽80% 4、 分别测试3个典型长度包的时延抖动(64,512,1518) 5、 每组包测试时间大于120秒 预期结果: 1、 因目前尚未有统一的测试标准值,根据IP承载网测试参考指标以及省内实际情况,建议 标准为包系统抖动平均小于5ms sertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cou20 中国移动广东公司IP城域网工程测试验收规范 测试工具:PC终端(命令行输出),网络测试仪 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.2.11. 丢包 测试范围:IP城域网示范点(肇庆、惠州)选择一个汇聚交换机连接网络测试仪 测试对象:路由器,交换机 测试目的:测试路由器,交换机在一定负荷状态下的24小时丢包率 测试平台:网络测试仪 测试流程: 1、 搭建测试环境,使网络流量从网络测试仪一个网口出发,经过汇聚交换机,SR,CR,再从 SR,到达汇聚交换机,从汇聚交换机的另一个端口返回网络测试仪另一个网口 2、 配置相应的业务路由 3、 测试包负荷为端口带宽80% 4、 测试长度为1518的丢包率 5、 测试时间为24小时 预期结果: 1、 因目前尚未有统一的测试标准值,根据IP承载网测试参考指标以及省内实际情况,建议 标准为数据包丢包率低于0.0001% 测试工具:PC终端(命令行输出),网络测试仪 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 21 3.3. 接入CMNet后联网测试 3.3.1. 与CMNET互联端口状态测试 测试对象:路由器(CR,SR) 测试目的:查看与CNMET连接端口状态 测试平台:从console口接入或远程登录到设备 测试流程: 1、 登录CR,检查路由器到CMNET T640 的端口状态 2、 登录SR, 检查路由器到CMNET NE80 的端口状态 预期结果: 1、显示路由器存在port及状态。端口协议UP。 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.3.2. 链路测试 测试对象:路由器(CR,SR) 测试目的:检查并确认到CMNET链路能正常工作。 测试平台:从console口接入或远程登录到设备 测试流程: 1、登录CR,ping对端CMNET T640的接口地址。Ping取Size 1500bytes,Count 1000 2、登录SR,ping对端CMNET NE80的接口地址。Ping取Size 1500bytes,Count 1000 预期结果: 1、丢包率为0,到CMNET的链路正常 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: ference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottom22 中国移动广东公司IP城域网工程测试验收规范 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.3.3. 到CMNET骨干连通性测试 测试对象:路由器(SR),每个地市选取两台SR 测试目的:检查到其他地市IP城域网的路由连通性。 测试平台:从console口接入或远程登录到设备 测试流程: 1、用PC下挂SR(配置业务网段),分别Ping CMNET 广州或深圳一台网络设备的IP地址 2、在PC上用trace route检查路由情况,Trace CMNET 广州或深圳一台网络设备的地址 预期结果: 1、PC到CMNET骨干连通。 2、显示所经的路径。 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.3.4. 域间路由连通性测试 测试对象:路由器(SR),每个地市选取两台SR 测试目的:检查到其他地市IP城域网的路由连通性。 测试平台:从console口接入或远程登录到设备 23 测试流程: 1、用PC下挂SR(配置业务网段),选取其他的地市的其中一个SR的接口地址,用PING命 令检查到其他地市城域网内地址的连通性 2、用traceroute命令观察到达该SR路由器的所经路由 预期结果: 1、到其他地市IP城域网的路由连通 2、显示所经的路径 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.3.5. 到Internet的路由连通性测试 测试对象:路由器(SR),每个地市选取两台SR 测试目的:检查到Internet的路由连通性。 测试平台:从console口接入或远程登录到设备 测试流程: 1、用PC下挂SR(配置业务网段),选取百度,新浪,网易的服务器地址,用PING命令检查 到Internet地址的连通性 2、用traceroute命令观察到Internet的所经路由 。 预期结果: 1、到Internet的路由连通 2、显示所经的路径 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: ht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key in24 中国移动广东公司IP城域网工程测试验收规范 3.3.6. 到CMNET路由备份测试 测试对象:路由器(SR),每个地市选取两台SR 测试目的:测试路由器上的路由备份,保证核心网络的可靠性。 测试平台:从console口接入或远程登录到设备 测试流程: 1、 用PC下挂SR(配置业务网段),用trace命令检查到达CMNET骨干网所经路由 2、 关闭核心路由器CR上trace命令所显示经过的一个出口端口(到CMNET的出口),模拟 该核心路由器到CMNET的链路中断 3、 用trace命令再观察到达CMNET骨干网所经路由,比较上一次的结果 4、 关闭两个核心路由器CR直接的连接端口,模拟CR直接的链路,一个CR到CMNET链路同 时中断的情况 5、 用trace命令再观察到达骨干网所经路由,比较上两次的结果 6、 开启步骤2关闭的端口,模拟CR之间直连链路中断的情况 7、 用trace命令再观察到达骨干网所经路由,比较结果 8、 开启步骤4关闭的端口,关闭另一个CR到CMNET的出口端口,模拟另一个CR到CMNET链 路中断的情况 9、 用trace命令再观察到达骨干网所经路由,比较结果 预期结果: 1、 到CMNET路由备份正常,任一个CR到CMNET出口中断或CR之间链路中断不影响业务 2、 路由按设计的最优路径选择 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.3.7. 到CMNET路由负载分担测试 测试对象:路由器(SR) 测试目的:测试路由器上的流量负载分担功能。 测试平台:从console口接入或远程登录到设备。 测试流程: 1、 用PC下挂SR(配置业务网段),用trace命令检查到达域外地址所经路由 2、 改变Trace的目的地址(trace至少10个地址),检查所经路由,并对比经过的路由 3、 检查路由表,查看到域外的路由。 25 预期结果: 1、 到CMNET的流量负载分担。 2、 在SR有两条等价路由指向CMNET 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.3.8. 跨域VPN业务测试 测试范围:IP城域网示范点(肇庆、惠州) 测试对象:路由器 测试目的:检查跨域VPN用户之间的网络连通性。 测试平台:路由器,交换机,PC 测试流程: 1、 需要省网维做相关配合 2、 在本地域内SR配置VPN-A. 3、 本地域的ASBR采用Option A(vrf-vrf)的方式进行跨域连接 4、 用一台PC作为VPN-A的用户主机,PC的默认路由指向VPN-A的VRF地址 5、 在另外的域以同样方式配置VPN-B 6、 在VPN-A用户主机上ping VPN-B的VRF地址,检查Ping包是否能通过 预期结果: 1、Ping成功,VPN-A主机与VPN-B连通 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: sertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cou26 中国移动广东公司IP城域网工程测试验收规范 3.3.9. 跨域 HUB-SPOKEN VPN业务测试 测试范围:IP城域网示范点(肇庆、惠州) 测试对象:路由器(CR、SR) 测试目的:检查跨域Hub-Spoken VPN用户之间的网络连通性。 测试平台:路由器,交换机,PC 测试流程: 1、 需要省网维做相关配合 2、 分别在本地域内SR配置VPN-A.VPN-B作为分支VPN (Spoken) Option A(vrf-vrf)的方式进行跨域连接 3、 本地域的ASBR采用 4、 用一台PC作为VPN-A的用户主机,接入VPN-A 5、 在另外的域配置VPN-C ,作为中心VPN (HUB,通过配置RT值实现) 6、 在VPN-A用户主机上Trace VPN-B的VRF地址,检查IP包路径 预期结果: 1、VPN-A到VPN-B包的流量需要经过中心VPN-C转发 测试工具:PC终端 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.3.10. 跨域VPN路由备份测试 测试范围:IP城域网示范点(肇庆、惠州) 测试对象:路由器(CR、SR) 测试目的:检查跨域VPN路由分担备份,保证业务稳定性 测试平台:路由器,交换机 27 测试流程: 1、 需要省网维做相关配合 2、 在SR(非与CMNET对接的SR)上新建VPN业务 VPN-A 3、 在于CNMET对接的两个SR上配置,以OptionA的方式跨域对接 4、 在其他域(已连通CMNET)开通VPN业务VPN-B,并以Option A方式和VPN-A进行跨域对 接 5、 在VPN-A的VRF ping VPN-B VRF的地址,并用Trace命令检查路径 6、 关闭Trace路径中的SR与CMNET的对接端口,模拟SR到CMNET链路中断 7、 再次在VPN-A的VRF ping VPN-B VRF的地址,并用Trace命令检查路径 8、 关闭两个与CNMET对接SR之间的接口,模拟两个SR之间的链路,SR到CMNET链路同时 中断的情况 9、 再次在VPN-A的VRF ping VPN-B VRF的地址,并用Trace命令检查路径 10、 开启步骤5关闭的端口,模拟两个SR之间链路中断的情况 11、 再次在VPN-A的VRF ping VPN-B VRF的地址,并用Trace命令检查路径 预期结果: 1、 测试过程VPN-A和VPN-B始终连通 2、 跨域VPN路由备份正常 测试工具:PC终端(命令行输出) 测试时间: 测试人员: 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 3.4. BAS对接后台RADIUS测试方案 3.4.1. 测试范围 本规范用于验证城域网BAS业务开通情况,用于指导后期实施。测试地点涉及IP城域网示范点(肇庆、惠州)。 3.4.2. 测试环境 测试涉及设备 本测试规范中的被测设备包含如下部分: PPPOE用户终端:PPPOE用户终端 the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe 28 中国移动广东公司IP城域网工程测试验收规范 Lanswitch:二层交换机(上行报文带vlan ID) BRAS:宽带接入服务器 Radius Server:Radius用户认证服务器 DHCP Server:分配用户IP 测试工具 本测试规范中需要如下的测试工具: 普通PC设备1台。 测试组网 基于PPPOE的认证方式,是以BRAS作为PPPOE用户接入认证点。测试环境如图1所示。 图1 PPPOE接入流程测试组网图 29 3.4.3. PPPOE接入流程测试项目列表 测试项项目编测试子项目 实测结果 备注 目 号 用户认用户认证成功、从内 证、IP地3.4.5 置在BRAS的DHCP ?通过 ?部分通过?不通过?免测试 址分配 Server分配IP地址 用户下PPPOE用户主动下3.4.6 ?通过 ?部分通过?不通过?免测试 线 线 3.4.4. 测试项目 IP地址分配 项 目:IP地址分配 分 项 目:用户从内置DHCP Server分配IP地址 测试目的: 、测试BRAS的内置DHCP Server1 预置条件: 1、正确配置BRAS内置的DHCP服务器上的地址池和网关等数据 2、 BRAS上配置PPPOE用户使用内置DHCP服务器进行地址分配 测试流程: 1、 PC根据RADIUS上的提供的账号进行拨号 2、 拨号成功后PC获取到IP地址 预期结果: 1、 在步骤1中,用户拨号成功。 2、 在步骤2中,拨号成功后,获取到相应的IP地址。 测试说明: 、、下可用命令获取到的地址1win2kwinXpipconfigIP 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: sertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cou30 中国移动广东公司IP城域网工程测试验收规范 3.4.5. 测试项目 用户下线 项 目:用户下线 分 项 目:PPPOE用户主动下线 测试目的: 、检验用户终端发起的下线功能1PPPOE 预置条件: 、用户已获取了密码,并开通了业务1 、认证点、用户认证服务器正确配置完毕2RADIUS 、正确配置,并分配指定的地址段3DHCP SERVER 测试流程: 、用户申请IP地址,启动认证流程1 、认证成功后,用户终端启动业务2PPPOEWWW 、点击用户终端下线按钮3PPPOE 、再次启动业务4WWW 预期结果: 、用户终端下线后再次启动业务时,不能正常进行。1PPPOEWWW 测试说明: 用户下线后,不能访问公网,无法通网关。 PING 测试结果: 签名: 网维部门: 工程部门: 监理单位: 厂家: 施工单位: 31 4. 结论 4.1. 测试结论 the the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the c32 中国移动广东公司IP城域网工程测试验收规范 5. 签字 工 作 单 位 及 部 门 姓 名 电话 日 期 33 6. 附录及附件 the table should be put in prison and avoid touching, to ensure correct measurement. Coupling disc after a week to return to upling tool should have adequate stiffness, installation must be secure and reliable. Coupling Center using a dial indicator,ng. Coallowed between two rotors, each in a free State. Not allowed in case of assembled sleeve, Center work on the toothed couplien the rotor and, in rotors make sure rotor is not on the block or seal oil. At the time of measurement, connections are not betwe s in the center of the bearing oil retaining the nest does not change. Steam oil block, there should be sufficient clearance, WA couplings, such as the use of temporary leave the Center, should pay attention to keep the rotor in the measuring procesrotor wo radii are equal to each other in order to eliminate errors caused by movement of the rotor. Only a support bearing of thelso be in terms of accuracy and consistency. Surface deviation measurement, must in every 180 degrees corresponding to the tpling constant, should athe same direction of rotation 90 ? or 180 ? for; after each disc rotor when measuring position alignment of the two half cousertion installation complex measuring cylinder in axial position. Bottomference, compared with the original values confirm the location. Internal vertical and horizontal cylinder under state key inht difg support pads, and retest the thickness. Once the lifting cylinder measurement of surface and internal cylinder surface heigh the feeler gauge measurement of gauge blocks or finishing. bearing surface, markup should be in accordance with the mountinet witlearance of end, into the feeler of the gap should not exceed four at a time, when the gap is too large, you can use the gaskoriginal position, circumference of dial gauge reading should be able to go back to the original value. When measuring the cthe 34
本文档为【《中国移动通信集团广东有限公司IP城域网工程》验收测试规范】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_769254
暂无简介~
格式:doc
大小:180KB
软件:Word
页数:68
分类:生活休闲
上传时间:2018-04-26
浏览量:69