首页 5230屏幕坏了没关系_看低成本更换诺基亚5230屏幕教程.wps

5230屏幕坏了没关系_看低成本更换诺基亚5230屏幕教程.wps

举报
开通vip

5230屏幕坏了没关系_看低成本更换诺基亚5230屏幕教程.wps5230屏幕坏了没关系_看低成本更换诺基亚5230屏幕教程.wps 屏幕坏了没关系 看低成本更换诺基亚5230屏幕教程 2010年10月14日15:09 来源:诺基亚手机论坛 我有话说(1) 相信大家在使用手机的时候难免会磕磕碰碰,严重时,会将手机屏幕摔坏。而去维修,在价格上有点偏高。我就试着自己更换摔坏的屏幕。下面和大家分享一下诺基亚5230手机屏幕更换过程。 本想找个尸体或者是拆机屏幕的,但是没找到。问了一个朋友的做手机的朋友,说是160能拿到,保证原装。我想,120跟160之间相差不了太多,真的原...

5230屏幕坏了没关系_看低成本更换诺基亚5230屏幕教程.wps
5230屏幕坏了没关系_看低成本更换诺基亚5230屏幕教程.wps 屏幕坏了没关系 看低成本更换诺基亚5230屏幕教程 2010年10月14日15:09 来源:诺基亚手机论坛 我有话说(1) 相信大家在使用手机的时候难免会磕磕碰碰,严重时,会将手机屏幕摔坏。而去维修,在价格上有点偏高。我就试着自己更换摔坏的屏幕。下面和大家分享一下诺基亚5230手机屏幕更换过程。 本想找个尸体或者是拆机屏幕的,但是没找到。问了一个朋友的做手机的朋友,说是160能拿到,保证原装。我想,120跟160之间相差不了太多,真的原装,应该也不止这个价格了。如果实在是不满意效果,就卖掉换新机了。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 遂干脆淘宝买了。屏幕的价格是118,也号称原装。我只是拆开了自己的屏幕,对照着淘宝上的图片,看上去更接近我的,就买下。前框的2个凹陷点,也很难看,买了一个, 号称也是原装,23元。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 屏幕一起附赠的工具,基本用不上,只要一把T6螺丝刀足矣~其它工具用指甲完全能代替。 因为网络上已经能找到很多拆机教程,因此拆机过程就此略过,再说我一个人也不方便拍照。下面,是已经拆下的触摸屏。【有的机友是触摸屏损坏的,也可以自己去淘一块, 价格好像100左右】。注意拆触摸屏的时候,不能直接拔出,一定要拆开屏幕下方两颗螺丝,掀开主板以后,均匀垂直向上用力拔出排线。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 显示屏的排线则是水平插入的,拔出时可以直接拔出,但是装进去时,必须掀起下方图里棕色的那个卡子,屏线才能插到位。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 两块屏幕的对比。左边是淘宝新买的,右边写了数字3的,是原装屏幕。我是根据屏幕下方打印的这些数字,觉得外观上更接近原装的样子,才购买的。都是1.3的版本。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 赶紧按照卖家要求,不去包装、保护膜,先上机试一下,成功点亮了。开机第一眼的感觉,效果还行呀~ that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 顺便也是试一下触摸屏有没有坏掉,还好,没坏~手指上戴的是工具包里的2个指套,感觉很怪,不方便。开始把新屏幕正式装上去。记住这里最好是先装触摸屏,再装显示 屏,否则会不那么顺手。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 此时屏幕保护贴还不要撕,以免弄脏了。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 准备把触摸屏装入前框了,先仔细对比一下做工上有无区别。我两只眼睛都看成了斗鸡眼,也感觉不出啥区别来。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 注意上下有别,一端的中间有密密一排小齿的,就是下面,靠近按键的一头。 注意合上前盖之前,记得撕下屏幕上的保护贴,否则,呵呵……屏幕顺利卡入前框。NOKIA的每一个配件,都是刚好能卡入的,大多地方甚至无需螺丝,只要卡到位,就 OK了,前框就是如此。注意上下有别,一端的中间有密密一排小齿的,就是下面,靠近按键的一头。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 废话完了,把螺丝全部拧紧到位。我的诺基亚5230重生了~ 因为新机购买时根本未在螺丝上贴易碎贴,所以,几乎看不出这台机器是修过的。 屏幕的显示效果非常令我满意,也看不出与原装的任何差别,真是大大的惊喜了~赶紧拨了个电话回去,排除一下是否存在其他故障。 that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and 在淘宝的购买 评价 LEC评价法下载LEC评价法下载评价量规免费下载学院评价表文档下载学院评价表文档下载 那里,有的人说偏暗,有的人说偏冷,有的说偏暖,有的也和我的感受一样,说与原装毫无二致。因此我觉得应该是各个生产批次版本的差异,我的刚好前后都是1.3版的,因此没有习惯上的落差,觉得特别满意。 在淘选屏幕的过程中,发现诺基亚5230/5233/5800/N97这几款手机的屏幕规格实际上是一模一样的,完全能够通用,但是版本上却存在什么1.5、2.1、2.2、3.1等很多,或许是商家为了满足消费者的心理,不同档次手机的备件,定义了不同的价格,相信学过市场营销的朋友都理解这个概念。因此淘宝上诺基亚5800、诺基亚N97的屏幕价格也是梯次上升。 我个人也用过诺基亚5800,放一起比较过,甚至特意显示同一张图片做过比较,除了色调的少许差异,不存在号或者坏的差别,非要说出好坏的,完全是个人喜欢以及心理因素作怪。 话已至此,相信需要维修自己的诺基亚5800或者诺基亚N97的朋友,自己心里有数了吧~姑且不妄加定论这个屏幕是否原装,能带给我这样子100%的满意度,相信这样子现身说法能够打消大家在更换屏幕过程中的顾虑。 你说换屏后能不能解决花屏问 快递公司问题件快递公司问题件货款处理关于圆的周长面积重点题型关于解方程组的题及答案关于南海问题 ,这个难说,既然我看到你 这个帖了,就说下换屏时的注意吧,你说想在网上买屏,原装的那是不可能,那的是号称原装的,我的52也是被我换了次,那是没办法了,早上去上班骑车,速度又快,从口袋毫不留情的掉了出来,当时一下没刹住车子,上班时间车又比较多,结果就这样眼睁睁的看着那个车啊~从上面压过~心里那个痛啊~后来捡起来是没的用了~不过打电话什么的的可以,就是不能显示了,显示屏裂了,一片漆黑什么的没有,下午就打电话到NOKIA店去,说要350,看网上是才100多,就自己动手了~换的时先把螺丝4个松下,之后拆中框,把它橇起来,拆出来后要注意不要让屏占到灰尘了,要不然很难清掉的,如果你是在网上买屏的话会送你的工具的,那些工具够你拆机了,到后面拆把屏拿起来的时间,要注意它中间是还有2个螺丝的,不松掉, 要不然屏是拿不下来。硬拿的话就会损坏屏了,那2个螺丝好像要把那后盖橇开才能看的到,其它细节方面你自己多注意点就是了,还有什么不懂的可在问 ~ QQ:714056922~ that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and that the wiring is correct, the operation is flexible, auxiliary contact is accurate. 11 current and voltage circuits check: current transformer wiring is correct, correct polarity, the secondary side are not allowed to open. 5.3.2.2 debugging 12 wiring insulation resistance test methods: secondary circuit insulation resistance must be greater than 1M (use 500V megohmmeter to check). 2 control loop simulation action test: disconnect electrical line of main loop switch outlet at, motor, electrical equipment not by electric, connected control power, check the Department of voltage whether meet provides, lights following electrical, work whether normal; operation the button or switch, corresponding of the following electrical, and contact device of sucking collection and release are should quickly, the related lights indicates to meet drawings requirements; with artificial simulation of method try moving the protection components, should can achieved quickly, and accurate, and reliable of protection function; manual the trip switch, Check its limited bit role of directional and the reliability; on has electrical joint lock link of equipment, should according to principle figure check chain function anti-mine grounding system debugging 5.3.3.1 grounding resistance of test method following figure by shows, along was measuring grounding very E' makes potential detection needle P' and current detection needle C' according to line each other apart 20m, insert to in the, and
本文档为【5230屏幕坏了没关系_看低成本更换诺基亚5230屏幕教程.wps】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_321575
暂无简介~
格式:doc
大小:1016KB
软件:Word
页数:0
分类:生活休闲
上传时间:2018-09-04
浏览量:25