首页 珠海旅游人数统计分析报告

珠海旅游人数统计分析报告

举报
开通vip

珠海旅游人数统计分析报告珠海旅游人数统计分析报告 2012年珠海游客人数统计分析报告 学 院: 商学院 年 级: 2011 专 业: 工程管理 小组成员: 梁振霖 郑蒙译 王素灿 王旭 2013-07-7 Stems, root cause mechanical damage, looping root amputation at the wound to prevent infection. (3) category tree seedlings: a spindle should have a uniform dis...

珠海旅游人数统计分析报告
珠海旅游人数统计分析 报告 软件系统测试报告下载sgs报告如何下载关于路面塌陷情况报告535n,sgs报告怎么下载竣工报告下载 2012年珠海游客人数统计分析报告 学 院: 商学院 年 级: 2011 专 业: 工程 路基工程安全技术交底工程项目施工成本控制工程量增项单年度零星工程技术标正投影法基本原理 管理 小组成员: 梁振霖 郑蒙译 王素灿 王旭 2013-07-7 Stems, root cause mechanical damage, looping root amputation at the wound to prevent infection. (3) category tree seedlings: a spindle should have a uniform distribution of main branches, branches, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should be relatively consistent, with 3-5 main branch, trunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, there are primary. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and main collateral distribution uniform, and main branch number not less than 5 branch, at least has 3 branch above irrigation high reached provides standard; creeping type shrubs requirements at least has 3 branch above main branch reached provides standard length; vine health seedlings, and should points branch uniform, and main article number 5 branch above, and main article diameter 1.0CM above; going it alone type shrubs requirements with trunk, and points branch uniform, base diameter in 2.0CM above; hedge with shrubs requirements irrigation bundle full, and points branch uniform, and dry lower leaves no bare, More than 2 years old. All plants are shrubs should meet the specifications. (5) the solitary trees should be selected single planting ornamental tree is beautiful, high ornamental value of individual plants. (6) design should be selected when the bushes planted plant specifications, flowering shrubs such as rhododendron plants should select color uniform varieties, planting interval and density. 4, seedling planting project plants should be located according to the drawings, and with reference to the national standard and suitable to avoid lines, planting pits should be greater than the minimum thickness requirements, planting soil backfill compaction in layers to ensure that plants are firmly rooted in the ground, supported by large-size seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in advance. Garden plant growth by required of minimum planting soil thickness should meet Xia table (construction figure Shang indicate of except) vegetation type herb flower lawn to was small shrubs big shrubs shallow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) 120 (CM) planting soil should selection for plant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soil, and pH 5.5~7.0, humidity 30~70%, completely loose, Lawn planting soil roughness (soil surface should be lower than teeth pond 2~5cm). 2, planting garden of foundation engineering projects from planning to the construction stage, focus on after completion of landscaping, the overall goal is to create a good living environment for plants, create a garden and green space. Plant engineering of the project was to create the basis for plant growth, soil, it can be said is the garden project, is one of the most important works. Also planted phase of this project must be carried out by the local soil improvement project. 3, seedling selection requirements: (1) engineering seedling selection of cooked goods, provisions relating to plant size. Plant procurement specifications can be large, so as to achieve ecological effect in a short time. Seedlings should have ... Strong, lush, Crown-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-shaped full, normal color, root system, pest and disease-free. 北京理工大学珠海学院《统计分析方法应用与实践》报告 目 录 1(调研背景.......................................................................................................... 2 2( 调研过程 ....................................................................................................... 2 3( 分析过程 ....................................................................................................... 4 4( 结论及建议 ................................................................................................... 7 附录........................................................................................................................ 8 附录1:数据来源 ........................................................................................ 8 附录2:小组成员及分工情况 .................................................................. 12 1free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-diseaseshaped full, normal color, root system, pest and ododendron plants should select color uniform varieties, planting interval and density. 4, seedling planting project plants s-ecological effect in a short time. Seedlings should have ... Strong, lush, Crown selection of cooked goods, provisions relating to plant size. Plant procurement specifications can be large, so as to achievedling is project must be carried out by the local soil improvement project. 3, seedling selection requirements: (1) engineering seeis for plant growth, soil, it can be said is the garden project, is one of the most important works. Also planted phase of thhe basreate a good living environment for plants, create a garden and green space. Plant engineering of the project was to create tf individual plants. (6) design should be selected when the bushes planted plant specifications, flowering shrubs such as rhineering projects from planning to the construction stage, focus on after completion of landscaping, the overall goal is to con engtely loose, Lawn planting soil roughness (soil surface should be lower than teeth pond 2~5cm). 2, planting garden of foundatiant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soil, and pH 5.5~7.0, humidity 30~70%, complefor plow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) 120 (CM) planting soil should selection ia table (construction figure Shang indicate of except) vegetation type herb flower lawn to was small shrubs big shrubs shallnce. Garden plant growth by required of minimum planting soil thickness should meet Xsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-alue ormly rooted in the ground, supported by largeare fishould be greater than the minimum thickness requirements, planting soil backfill compaction in layers to ensure that plants be located according to the drawings, and with reference to the national standard and suitable to avoid lines, planting pits hould the specifications. (5) the solitary trees should be selected single planting ornamental tree is beautiful, high ornamental vndle full, and points branch uniform, and dry lower leaves no bare, More than 2 years old. All plants are shrubs should meet on buubs requirements with trunk, and points branch uniform, base diameter in 2.0CM above; hedge with shrubs requirements irrigatipoints branch uniform, and main article number 5 branch above, and main article diameter 1.0CM above; going it alone type shr houldpe shrubs requirements at least has 3 branch above main branch reached provides standard length; vine health seedlings, and smain branch number not less than 5 branch, at least has 3 branch above irrigation high reached provides standard; creeping ty m, and. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and main collateral distribution unifortrunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, there are primary5 main branch, -, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should be relatively consistent, with 3nd to prevent infection. (3) category tree seedlings: a spindle should have a uniform distribution of main branches, branchesStems, root cause mechanical damage, looping root amputation at the wou 2 1(调研背景 建立特区30年来,珠海旅游业伴随着珠海市经济的增长和社会的进步取得了长足的发展。通过大力推进旅游项目投资,珠海旅游产品不断丰富,配套设施日益完善,产业规模持续扩大,产业特征更为明显,已初步形成“东部海岛环游热、中部商务与休闲度假俊、西部温泉与生态游俏”的开发格局,旅游经济蓬勃兴旺。 随着珠三角改革发展规划纲要的实施,珠海横琴新区、港珠澳大桥、高栏港经济开发区等多个引擎的启动,长隆国际海洋度假区、海泉湾二期、东澳岛玲玎海岸、南方影视文化产业基地等文化旅游项目的推进建设,珠海旅游业迎来了难得的发展机遇。未来珠海旅游将形成西部以海泉湾、御温泉和沙田水乡民俗生态游为代 关于同志近三年现实表现材料材料类招标技术评分表图表与交易pdf视力表打印pdf用图表说话 pdf ;中部以长隆海洋度假区、一批国际连锁酒店、高尔夫球场、淇澳红树林湿地公园、情侣路滨海休闲旅游带、城市观光和商业品牌购物店为主线的旅游产品;东部海岛以东澳岛4A景区和外伶仃岛为拳头产品的海洋海岛旅游圈。 2(调研过程 2012年珠海市国内游客直方图 2012年珠海市入境游客直方图 tree is beautiful, high ornamental value of individual plants. (6) design should be selected when the bushes planted plant sental rs old. All plants are shrubs should meet the specifications. (5) the solitary trees should be selected single planting ornamdge with shrubs requirements irrigation bundle full, and points branch uniform, and dry lower leaves no bare, More than 2 yeae; hemeter 1.0CM above; going it alone type shrubs requirements with trunk, and points branch uniform, base diameter in 2.0CM abovlength; vine health seedlings, and should points branch uniform, and main article number 5 branch above, and main article dia ndardigh reached provides standard; creeping type shrubs requirements at least has 3 branch above main branch reached provides stamain collateral distribution uniform, and main branch number not less than 5 branch, at least has 3 branch above irrigation h ere are primary. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and5 main branch, trunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, th-atively consistent, with 3be relrm distribution of main branches, branches, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should damage, looping root amputation at the wound to prevent infection. (3) category tree seedlings: a spindle should have a unifoStems, root cause mechanical 2free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-full, normal color, root system, pest and diseaseshaped -cifications can be large, so as to achieve ecological effect in a short time. Seedlings should have ... Strong, lush, Crownon requirements: (1) engineering seedling selection of cooked goods, provisions relating to plant size. Plant procurement spelectiimportant works. Also planted phase of this project must be carried out by the local soil improvement project. 3, seedling se ering of the project was to create the basis for plant growth, soil, it can be said is the garden project, is one of the mostenginen of landscaping, the overall goal is to create a good living environment for plants, create a garden and green space. Plant 5cm). 2, planting garden of foundation engineering projects from planning to the construction stage, focus on after completioond 2~l, and pH 5.5~7.0, humidity 30~70%, completely loose, Lawn planting soil roughness (soil surface should be lower than teeth p(CM) planting soil should selection for plant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soi120 lawn to was small shrubs big shrubs shallow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) imum planting soil thickness should meet Xia table (construction figure Shang indicate of except) vegetation type herb flowernce. Garden plant growth by required of minsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-ion in layers to ensure that plants are firmly rooted in the ground, supported by largeompactnd suitable to avoid lines, planting pits should be greater than the minimum thickness requirements, planting soil backfill c, seedling planting project plants should be located according to the drawings, and with reference to the national standard aity. 4pecifications, flowering shrubs such as rhododendron plants should select color uniform varieties, planting interval and dens 北京理工大学珠海学院《统计分析方法应用与实践》报告 一,小组成员对2012年珠海旅游的情况进行分析,确定调研的目标和任务分配。 二,小组成员开始通过各种途径收集数据,整理分析数据。 三,小组成员对2012年珠海旅游的情况提出问题 1,2012年珠海每个月的旅游总人数的分布情况。 2,2012年国内游客与入境游客的人数变化情况。 3,在入境游客中,外国人,香港同胞,澳门同胞,台湾同胞的 比较情况 4,如果是一位游客,如何根据旅游的情况避开高峰期。 5.如果是一位商人,如何根据旅游的情况赞取更多的利润。 3free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-diseaseshaped full, normal color, root system, pest and f individual plants. (6) design should be selected when the bushes planted plant specifications, flowering shrubs such as rh-ecological effect in a short time. Seedlings should have ... Strong, lush, Crown selection of cooked goods, provisions relating to plant size. Plant procurement specifications can be large, so as to achievedling is project must be carried out by the local soil improvement project. 3, seedling selection requirements: (1) engineering seeis for plant growth, soil, it can be said is the garden project, is one of the most important works. Also planted phase of thhe basreate a good living environment for plants, create a garden and green space. Plant engineering of the project was to create talue oineering projects from planning to the construction stage, focus on after completion of landscaping, the overall goal is to con engtely loose, Lawn planting soil roughness (soil surface should be lower than teeth pond 2~5cm). 2, planting garden of foundatiant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soil, and pH 5.5~7.0, humidity 30~70%, complefor plow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) 120 (CM) planting soil should selection ia table (construction figure Shang indicate of except) vegetation type herb flower lawn to was small shrubs big shrubs shallnce. Garden plant growth by required of minimum planting soil thickness should meet Xsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-the specifications. (5) the solitary trees should be selected single planting ornamental tree is beautiful, high ornamental vrmly rooted in the ground, supported by largeare fishould be greater than the minimum thickness requirements, planting soil backfill compaction in layers to ensure that plants be located according to the drawings, and with reference to the national standard and suitable to avoid lines, planting pits hould ododendron plants should select color uniform varieties, planting interval and density. 4, seedling planting project plants sndle full, and points branch uniform, and dry lower leaves no bare, More than 2 years old. All plants are shrubs should meet on buubs requirements with trunk, and points branch uniform, base diameter in 2.0CM above; hedge with shrubs requirements irrigatipoints branch uniform, and main article number 5 branch above, and main article diameter 1.0CM above; going it alone type shr houldpe shrubs requirements at least has 3 branch above main branch reached provides standard length; vine health seedlings, and smain branch number not less than 5 branch, at least has 3 branch above irrigation high reached provides standard; creeping ty m, and. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and main collateral distribution unifortrunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, there are primary5 main branch, -, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should be relatively consistent, with 3nd to prevent infection. (3) category tree seedlings: a spindle should have a uniform distribution of main branches, branchesStems, root cause mechanical damage, looping root amputation at the wou 4 3(分析过程 总人数 >= 160 (FILTER) 频率 百分比 有效百分比 累积百分比 有效 Not Selected 9 75.0 75.0 75.0 Selected 3 25.0 25.0 100.0 合计 12 100.0 100.0 根据上图我们可以得到珠海市总人数的在2012年的分布情况,3月是个小峰期,6月,7月是个中峰期,11月左右是个高峰期。总人数超过160万人口的有3个月份,分别是10月,11月,12月。 meter 1.0CM above; going it alone type shrubs requirements with trunk, and points branch uniform, base diameter in 2.0CM abovlength; vine health seedlings, and should points branch uniform, and main article number 5 branch above, and main article dia ndardigh reached provides standard; creeping type shrubs requirements at least has 3 branch above main branch reached provides stamain collateral distribution uniform, and main branch number not less than 5 branch, at least has 3 branch above irrigation h ere are primary. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and5 main branch, trunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, th-atively consistent, with 3be relrm distribution of main branches, branches, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should damage, looping root amputation at the wound to prevent infection. (3) category tree seedlings: a spindle should have a unifoStems, root cause mechanical 4free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-full, normal color, root system, pest and diseaseshaped -cifications can be large, so as to achieve ecological effect in a short time. Seedlings should have ... Strong, lush, Crownon requirements: (1) engineering seedling selection of cooked goods, provisions relating to plant size. Plant procurement spelectiimportant works. Also planted phase of this project must be carried out by the local soil improvement project. 3, seedling se ering of the project was to create the basis for plant growth, soil, it can be said is the garden project, is one of the mostenginen of landscaping, the overall goal is to create a good living environment for plants, create a garden and green space. Plant 5cm). 2, planting garden of foundation engineering projects from planning to the construction stage, focus on after completioond 2~l, and pH 5.5~7.0, humidity 30~70%, completely loose, Lawn planting soil roughness (soil surface should be lower than teeth p(CM) planting soil should selection for plant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soi120 lawn to was small shrubs big shrubs shallow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) imum planting soil thickness should meet Xia table (construction figure Shang indicate of except) vegetation type herb flowernce. Garden plant growth by required of minsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-ion in layers to ensure that plants are firmly rooted in the ground, supported by largeompactnd suitable to avoid lines, planting pits should be greater than the minimum thickness requirements, planting soil backfill c, seedling planting project plants should be located according to the drawings, and with reference to the national standard aity. 4pecifications, flowering shrubs such as rhododendron plants should select color uniform varieties, planting interval and denstree is beautiful, high ornamental value of individual plants. (6) design should be selected when the bushes planted plant sental rs old. All plants are shrubs should meet the specifications. (5) the solitary trees should be selected single planting ornamdge with shrubs requirements irrigation bundle full, and points branch uniform, and dry lower leaves no bare, More than 2 yeae; he 北京理工大学珠海学院《统计分析方法应用与实践》报告 入境游客的直方图及变化情况 入境游客中的外国人,香港同胞,澳门同胞,台湾同胞的直方图) 根据上图分析,珠海市的入境游客中,从一月开始,逐渐平缓上升在6月,7月份有个小高峰,之后发展变化平缓,到10月,11月,12月达到一个高峰期。 5free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-diseaseshaped full, normal color, root system, pest and on bu-ecological effect in a short time. Seedlings should have ... Strong, lush, Crown selection of cooked goods, provisions relating to plant size. Plant procurement specifications can be large, so as to achievedling is project must be carried out by the local soil improvement project. 3, seedling selection requirements: (1) engineering seeis for plant growth, soil, it can be said is the garden project, is one of the most important works. Also planted phase of thhe basreate a good living environment for plants, create a garden and green space. Plant engineering of the project was to create tubs requirements with trunk, and points branch uniform, base diameter in 2.0CM above; hedge with shrubs requirements irrigatiineering projects from planning to the construction stage, focus on after completion of landscaping, the overall goal is to con engtely loose, Lawn planting soil roughness (soil surface should be lower than teeth pond 2~5cm). 2, planting garden of foundatiant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soil, and pH 5.5~7.0, humidity 30~70%, complefor plow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) 120 (CM) planting soil should selection ia table (construction figure Shang indicate of except) vegetation type herb flower lawn to was small shrubs big shrubs shallnce. Garden plant growth by required of minimum planting soil thickness should meet Xsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-points branch uniform, and main article number 5 branch above, and main article diameter 1.0CM above; going it alone type shrrmly rooted in the ground, supported by largeare fishould be greater than the minimum thickness requirements, planting soil backfill compaction in layers to ensure that plants be located according to the drawings, and with reference to the national standard and suitable to avoid lines, planting pits hould ododendron plants should select color uniform varieties, planting interval and density. 4, seedling planting project plants sf individual plants. (6) design should be selected when the bushes planted plant specifications, flowering shrubs such as rhalue othe specifications. (5) the solitary trees should be selected single planting ornamental tree is beautiful, high ornamental vndle full, and points branch uniform, and dry lower leaves no bare, More than 2 years old. All plants are shrubs should meet houldpe shrubs requirements at least has 3 branch above main branch reached provides standard length; vine health seedlings, and smain branch number not less than 5 branch, at least has 3 branch above irrigation high reached provides standard; creeping ty m, and. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and main collateral distribution unifortrunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, there are primary5 main branch, -, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should be relatively consistent, with 3nd to prevent infection. (3) category tree seedlings: a spindle should have a uniform distribution of main branches, branchesStems, root cause mechanical damage, looping root amputation at the wou 6 根据游客总人数和入境游客的所占比例图,在6月,7月是,我们有个小高峰期,在11月,12月有个人流量高峰期。 meter 1.0CM above; going it alone type shrubs requirements with trunk, and points branch uniform, base diameter in 2.0CM abovlength; vine health seedlings, and should points branch uniform, and main article number 5 branch above, and main article dia ndardigh reached provides standard; creeping type shrubs requirements at least has 3 branch above main branch reached provides stamain collateral distribution uniform, and main branch number not less than 5 branch, at least has 3 branch above irrigation h ere are primary. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and5 main branch, trunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, th-atively consistent, with 3be relrm distribution of main branches, branches, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should damage, looping root amputation at the wound to prevent infection. (3) category tree seedlings: a spindle should have a unifoStems, root cause mechanical 6free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-full, normal color, root system, pest and diseaseshaped -cifications can be large, so as to achieve ecological effect in a short time. Seedlings should have ... Strong, lush, Crownon requirements: (1) engineering seedling selection of cooked goods, provisions relating to plant size. Plant procurement spelectiimportant works. Also planted phase of this project must be carried out by the local soil improvement project. 3, seedling se ering of the project was to create the basis for plant growth, soil, it can be said is the garden project, is one of the mostenginen of landscaping, the overall goal is to create a good living environment for plants, create a garden and green space. Plant 5cm). 2, planting garden of foundation engineering projects from planning to the construction stage, focus on after completioond 2~l, and pH 5.5~7.0, humidity 30~70%, completely loose, Lawn planting soil roughness (soil surface should be lower than teeth p(CM) planting soil should selection for plant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soi120 lawn to was small shrubs big shrubs shallow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) imum planting soil thickness should meet Xia table (construction figure Shang indicate of except) vegetation type herb flowernce. Garden plant growth by required of minsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-ion in layers to ensure that plants are firmly rooted in the ground, supported by largeompactnd suitable to avoid lines, planting pits should be greater than the minimum thickness requirements, planting soil backfill c, seedling planting project plants should be located according to the drawings, and with reference to the national standard aity. 4pecifications, flowering shrubs such as rhododendron plants should select color uniform varieties, planting interval and denstree is beautiful, high ornamental value of individual plants. (6) design should be selected when the bushes planted plant sental rs old. All plants are shrubs should meet the specifications. (5) the solitary trees should be selected single planting ornamdge with shrubs requirements irrigation bundle full, and points branch uniform, and dry lower leaves no bare, More than 2 yeae; he 北京理工大学珠海学院《统计分析方法应用与实践》报告 4(结论及建议 一,通过一系列的数据,直方图,直线图,饼形图分析,得出以下结论: 1,在2012年珠海总人数中一年变化中和在2012年珠海市入境游客一年变化中,从第1月开始,逐渐平缓上升,第三月是个旅游小峰期,第6月,7月是个旅游中峰期,11月左右是个旅游高峰期。总人数超过160万人口的有3个月份,分别是10月,11月,12月。 2,在外国人,香港同胞,澳门同胞和台湾同胞的入境游客中,香港同胞,澳门同胞人数上升的幅度较大,特别在第10月后,变化更加明显。 二,给旅游者和商家建议: 1对于一个游客而言,尽量不要选在人流量中和高峰期,即6月之后来珠海旅游,因为人数较多,价钱高,很容易出现拥挤,等待长等问题。 2对于一位商人来说,根据人流量来调整自己的业务结构,在小峰期时(1月到5月),减少企业的业务,在游客量多时(6月到12月),应当增加自己的业务结构,扩展自己的业务模式。 7free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-diseaseshaped full, normal color, root system, pest and hould-ecological effect in a short time. Seedlings should have ... Strong, lush, Crown selection of cooked goods, provisions relating to plant size. Plant procurement specifications can be large, so as to achievedling is project must be carried out by the local soil improvement project. 3, seedling selection requirements: (1) engineering seeis for plant growth, soil, it can be said is the garden project, is one of the most important works. Also planted phase of thhe basreate a good living environment for plants, create a garden and green space. Plant engineering of the project was to create tpe shrubs requirements at least has 3 branch above main branch reached provides standard length; vine health seedlings, and sineering projects from planning to the construction stage, focus on after completion of landscaping, the overall goal is to con engtely loose, Lawn planting soil roughness (soil surface should be lower than teeth pond 2~5cm). 2, planting garden of foundatiant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soil, and pH 5.5~7.0, humidity 30~70%, complefor plow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) 120 (CM) planting soil should selection ia table (construction figure Shang indicate of except) vegetation type herb flower lawn to was small shrubs big shrubs shallnce. Garden plant growth by required of minimum planting soil thickness should meet Xsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-main branch number not less than 5 branch, at least has 3 branch above irrigation high reached provides standard; creeping tyrmly rooted in the ground, supported by largeare fishould be greater than the minimum thickness requirements, planting soil backfill compaction in layers to ensure that plants be located according to the drawings, and with reference to the national standard and suitable to avoid lines, planting pits hould ododendron plants should select color uniform varieties, planting interval and density. 4, seedling planting project plants sf individual plants. (6) design should be selected when the bushes planted plant specifications, flowering shrubs such as rhalue othe specifications. (5) the solitary trees should be selected single planting ornamental tree is beautiful, high ornamental vndle full, and points branch uniform, and dry lower leaves no bare, More than 2 years old. All plants are shrubs should meet on bu ubs requirements with trunk, and points branch uniform, base diameter in 2.0CM above; hedge with shrubs requirements irrigatipoints branch uniform, and main article number 5 branch above, and main article diameter 1.0CM above; going it alone type shr m, and. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and main collateral distribution unifortrunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, there are primary5 main branch, -, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should be relatively consistent, with 3nd to prevent infection. (3) category tree seedlings: a spindle should have a uniform distribution of main branches, branchesStems, root cause mechanical damage, looping root amputation at the wou 8 附录 附录1:数据来源 数据主要来自于网上统计局数据库 国内游香港同澳门同台湾同入境游月份 外国人 总人数 客 胞 胞 胞 客 1 62.63 2.39 5.53 1.69 1.75 73.99 11.36 2 69.08 2.4 2.65 2.11 1.75 77.99 8.91 3 96.69 2.57 5.32 2.07 2.34 108.99 12.3 4 67.2 3.41 5.68 2.62 2.5 81.41 14.21 5 89.04 2.36 7.14 3.5 2.56 104.6 15.56 6 129.48 5.91 7.74 3.94 8.84 155.91 26.43 7 125.55 6.79 7.31 4.31 11.28 155.24 29.69 8 109.89 3.47 7.39 3.84 6.92 131.51 21.62 9 96.64 3.26 5.84 2.67 5.54 113.95 17.31 10 142.42 5.39 11.93 4.9 5.1 169.74 27.32 11 198.22 8.62 12.05 8.86 6.41 234.16 35.94 12 111.95 7.26 34.49 30.7 4.48 188.88 76.93 指标名称 1-1月 同比增长(,) 旅游过夜总人数(万人次) 74.00 2.3 其中:国内游客 62.63 2.8 入境游客 11.37 -0.3 其中:外国人 2.39 -19.9 香港同胞 5.53 23.0 澳门同胞 1.69 -8.8 台湾同胞 1.75 -15.2 指标名称 1-2月 同比增长(,) nd suitable to avoid lines, planting pits should be greater than the minimum thickness requirements, planting soil backfill c, seedling planting project plants should be located according to the drawings, and with reference to the national standard aity. 4pecifications, flowering shrubs such as rhododendron plants should select color uniform varieties, planting interval and denstree is beautiful, high ornamental value of individual plants. (6) design should be selected when the bushes planted plant sental rs old. All plants are shrubs should meet the specifications. (5) the solitary trees should be selected single planting ornamdge with shrubs requirements irrigation bundle full, and points branch uniform, and dry lower leaves no bare, More than 2 yeae; hemeter 1.0CM above; going it alone type shrubs requirements with trunk, and points branch uniform, base diameter in 2.0CM abovlength; vine health seedlings, and should points branch uniform, and main article number 5 branch above, and main article dia ndardigh reached provides standard; creeping type shrubs requirements at least has 3 branch above main branch reached provides stamain collateral distribution uniform, and main branch number not less than 5 branch, at least has 3 branch above irrigation h ere are primary. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and5 main branch, trunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, th-atively consistent, with 3be relrm distribution of main branches, branches, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should damage, looping root amputation at the wound to prevent infection. (3) category tree seedlings: a spindle should have a unifoStems, root cause mechanical 8free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-full, normal color, root system, pest and diseaseshaped -cifications can be large, so as to achieve ecological effect in a short time. Seedlings should have ... Strong, lush, Crownon requirements: (1) engineering seedling selection of cooked goods, provisions relating to plant size. Plant procurement spelectiimportant works. Also planted phase of this project must be carried out by the local soil improvement project. 3, seedling se ering of the project was to create the basis for plant growth, soil, it can be said is the garden project, is one of the mostenginen of landscaping, the overall goal is to create a good living environment for plants, create a garden and green space. Plant 5cm). 2, planting garden of foundation engineering projects from planning to the construction stage, focus on after completioond 2~l, and pH 5.5~7.0, humidity 30~70%, completely loose, Lawn planting soil roughness (soil surface should be lower than teeth p(CM) planting soil should selection for plant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soi120 lawn to was small shrubs big shrubs shallow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) imum planting soil thickness should meet Xia table (construction figure Shang indicate of except) vegetation type herb flowernce. Garden plant growth by required of minsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-ion in layers to ensure that plants are firmly rooted in the ground, supported by largeompact 北京理工大学珠海学院《统计分析方法应用与实践》报告 旅游过夜总人数(万人次) 151.98 1.1 其中:国内游客 131.71 2.1 入境游客 20.28 -4.6 其中:外国人 4.79 -5.2 香港同胞 8.18 0.8 澳门同胞 3.80 1.9 台湾同胞 3.50 -19.4 指标名称 1-3月 同比增长(,) 旅游过夜总人数(万人次) 260.97 2.5 其中:国内游客 228.40 4.0 入境游客 32.57 -6.6 其中:外国人 7.36 -7.0 香港同胞 13.50 -4.2 澳门同胞 5.87 4.5 台湾同胞 5.84 -19.5 指标名称 1-4月 同比增长(,) 旅游过夜总人数(万人次) 342.38 1.1 其中:国内游客 295.60 2.7 入境游客 46.78 -8.0 其中:外国人 10.77 -10.2 香港同胞 19.18 -6.1 澳门同胞 8.49 5.9 台湾同胞 8.34 -20.0 指标名称 1-5月 同比增长(,) 旅游过夜总人数(万人次) 446.97 2.5 其中:国内游客 384.64 4.2 入境游客 62.33 -6.9 其中:外国人 13.13 -7.6 香港同胞 26.32 -3.2 澳门同胞 11.99 1.2 台湾同胞 10.90 -20.4 9free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-diseaseshaped full, normal color, root system, pest and ubs requirements with trunk, and points branch uniform, base diameter in 2.0CM above; hedge with shrubs requirements irrigati-ecological effect in a short time. Seedlings should have ... Strong, lush, Crown selection of cooked goods, provisions relating to plant size. Plant procurement specifications can be large, so as to achievedling is project must be carried out by the local soil improvement project. 3, seedling selection requirements: (1) engineering seeis for plant growth, soil, it can be said is the garden project, is one of the most important works. Also planted phase of thhe basreate a good living environment for plants, create a garden and green space. Plant engineering of the project was to create tpoints branch uniform, and main article number 5 branch above, and main article diameter 1.0CM above; going it alone type shrineering projects from planning to the construction stage, focus on after completion of landscaping, the overall goal is to con engtely loose, Lawn planting soil roughness (soil surface should be lower than teeth pond 2~5cm). 2, planting garden of foundatiant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soil, and pH 5.5~7.0, humidity 30~70%, complefor plow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) 120 (CM) planting soil should selection ia table (construction figure Shang indicate of except) vegetation type herb flower lawn to was small shrubs big shrubs shallnce. Garden plant growth by required of minimum planting soil thickness should meet Xsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva- rmly rooted in the ground, supported by largeare fishould be greater than the minimum thickness requirements, planting soil backfill compaction in layers to ensure that plants be located according to the drawings, and with reference to the national standard and suitable to avoid lines, planting pits hould ododendron plants should select color uniform varieties, planting interval and density. 4, seedling planting project plants sf individual plants. (6) design should be selected when the bushes planted plant specifications, flowering shrubs such as rhalue othe specifications. (5) the solitary trees should be selected single planting ornamental tree is beautiful, high ornamental vndle full, and points branch uniform, and dry lower leaves no bare, More than 2 years old. All plants are shrubs should meet on buhouldpe shrubs requirements at least has 3 branch above main branch reached provides standard length; vine health seedlings, and smain branch number not less than 5 branch, at least has 3 branch above irrigation high reached provides standard; creeping ty m, and. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and main collateral distribution unifortrunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, there are primary5 main branch, -, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should be relatively consistent, with 3nd to prevent infection. (3) category tree seedlings: a spindle should have a uniform distribution of main branches, branchesStems, root cause mechanical damage, looping root amputation at the wou 10 指标名称 1-6月 同比增长(,) 旅游过夜总人数(万人次) 602.88 2.3 其中:国内游客 514.12 4.3 入境游客 88.76 -7.7 其中:外国人 19.04 -8.5 香港同胞 34.06 -4.0 澳门同胞 15.93 2.6 台湾同胞 19.74 -19.0 指标名称 1-7月 同比增长(,) 旅游过夜总人数(万人次) 758.12 2.9 其中:国内游客 639.67 5.4 入境游客 118.45 -8.8 其中:外国人 25.83 -8.3 香港同胞 41.37 -4.5 澳门同胞 20.24 3.0 台湾同胞 31.02 -20.0 指标名称 1-8月 同比增长(,) 旅游过夜总人数(万人次) 889.62 2.7 其中:国内游客 749.56 5.1 入境游客 140.06 -8.3 其中:外国人 29.30 -8.4 香港同胞 48.76 -4.4 澳门同胞 24.08 3.1 台湾同胞 37.94 -18.4 指标名称 1-9月 同比增长(,) 旅游过夜总人数(万人次) 1003.59 1.7 其中:国内游客 846.20 4.1 入境游客 157.39 -9.5 其中:外国人 32.56 -8.4 length; vine health seedlings, and should points branch uniform, and main article number 5 branch above, and main article dia ndardigh reached provides standard; creeping type shrubs requirements at least has 3 branch above main branch reached provides stamain collateral distribution uniform, and main branch number not less than 5 branch, at least has 3 branch above irrigation h ere are primary. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and5 main branch, trunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, th-atively consistent, with 3be relrm distribution of main branches, branches, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should damage, looping root amputation at the wound to prevent infection. (3) category tree seedlings: a spindle should have a unifoStems, root cause mechanical 10free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-full, normal color, root system, pest and diseaseshaped -cifications can be large, so as to achieve ecological effect in a short time. Seedlings should have ... Strong, lush, Crownon requirements: (1) engineering seedling selection of cooked goods, provisions relating to plant size. Plant procurement spelectiimportant works. Also planted phase of this project must be carried out by the local soil improvement project. 3, seedling se ering of the project was to create the basis for plant growth, soil, it can be said is the garden project, is one of the mostenginen of landscaping, the overall goal is to create a good living environment for plants, create a garden and green space. Plant 5cm). 2, planting garden of foundation engineering projects from planning to the construction stage, focus on after completioond 2~l, and pH 5.5~7.0, humidity 30~70%, completely loose, Lawn planting soil roughness (soil surface should be lower than teeth p(CM) planting soil should selection for plant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soi120 lawn to was small shrubs big shrubs shallow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) imum planting soil thickness should meet Xia table (construction figure Shang indicate of except) vegetation type herb flowernce. Garden plant growth by required of minsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-ion in layers to ensure that plants are firmly rooted in the ground, supported by largeompactnd suitable to avoid lines, planting pits should be greater than the minimum thickness requirements, planting soil backfill c, seedling planting project plants should be located according to the drawings, and with reference to the national standard aity. 4pecifications, flowering shrubs such as rhododendron plants should select color uniform varieties, planting interval and denstree is beautiful, high ornamental value of individual plants. (6) design should be selected when the bushes planted plant sental rs old. All plants are shrubs should meet the specifications. (5) the solitary trees should be selected single planting ornamdge with shrubs requirements irrigation bundle full, and points branch uniform, and dry lower leaves no bare, More than 2 yeae; hemeter 1.0CM above; going it alone type shrubs requirements with trunk, and points branch uniform, base diameter in 2.0CM abov 北京理工大学珠海学院《统计分析方法应用与实践》报告 香港同胞 54.60 -6.3 澳门同胞 26.75 -0.1 台湾同胞 4348 -18.4 指标名称 1-10月 同比增长(,) 旅游过夜总人数(万人次) 1173.33 2.5 其中:国内游客 988.62 5.1 入境游客 184.71 -9.4 其中:外国人 37.95 -8.3 香港同胞 66.53 -7.6 澳门同胞 31.65 1.1 台湾同胞 48.58 -18.0 指标名称 1-11月 同比增长(,) 旅游过夜总人数(万人次) 1407.49 3.1 其中:国内游客 1186.84 5.5 入境游客 220.65 -8.3 其中:外国人 46.57 -8.6 香港同胞 78.58 -6.3 澳门同胞 40.51 1.1 台湾同胞 54.99 -16.3 指标名称 1-12月 同比增长(,) 旅游过夜总人数(万人次) 1596.37 4.0 其中:国内游客 1298.79 6.9 入境游客 297.58 -7.3 其中:外国人 53.83 -7.5 香港同胞 113.07 -7.0 澳门同胞 71.21 -0.8 台湾同胞 59.47 -14.2 11free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-diseaseshaped full, normal color, root system, pest and points branch uniform, and main article number 5 branch above, and main article diameter 1.0CM above; going it alone type shr-ecological effect in a short time. Seedlings should have ... Strong, lush, Crown selection of cooked goods, provisions relating to plant size. Plant procurement specifications can be large, so as to achievedling is project must be carried out by the local soil improvement project. 3, seedling selection requirements: (1) engineering seeis for plant growth, soil, it can be said is the garden project, is one of the most important works. Also planted phase of thhe basreate a good living environment for plants, create a garden and green space. Plant engineering of the project was to create t ineering projects from planning to the construction stage, focus on after completion of landscaping, the overall goal is to con engtely loose, Lawn planting soil roughness (soil surface should be lower than teeth pond 2~5cm). 2, planting garden of foundatiant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soil, and pH 5.5~7.0, humidity 30~70%, complefor plow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) 120 (CM) planting soil should selection ia table (construction figure Shang indicate of except) vegetation type herb flower lawn to was small shrubs big shrubs shallnce. Garden plant growth by required of minimum planting soil thickness should meet Xsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-houldrmly rooted in the ground, supported by largeare fishould be greater than the minimum thickness requirements, planting soil backfill compaction in layers to ensure that plants be located according to the drawings, and with reference to the national standard and suitable to avoid lines, planting pits hould ododendron plants should select color uniform varieties, planting interval and density. 4, seedling planting project plants sf individual plants. (6) design should be selected when the bushes planted plant specifications, flowering shrubs such as rhalue othe specifications. (5) the solitary trees should be selected single planting ornamental tree is beautiful, high ornamental vndle full, and points branch uniform, and dry lower leaves no bare, More than 2 years old. All plants are shrubs should meet on bupe shrubs requirements at least has 3 branch above main branch reached provides standard length; vine health seedlings, and subs requirements with trunk, and points branch uniform, base diameter in 2.0CM above; hedge with shrubs requirements irrigatimain branch number not less than 5 branch, at least has 3 branch above irrigation high reached provides standard; creeping ty m, and. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and main collateral distribution unifortrunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, there are primary5 main branch, -, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should be relatively consistent, with 3nd to prevent infection. (3) category tree seedlings: a spindle should have a uniform distribution of main branches, branchesStems, root cause mechanical damage, looping root amputation at the wou 12 附录2:小组成员及分工情况 梁振霖:输入数据,写调研报告 郑蒙译:收集资料,做 ppt 关于艾滋病ppt课件精益管理ppt下载地图下载ppt可编辑假如ppt教学课件下载triz基础知识ppt 王素灿:收集资料,ppt演讲 王旭:收集资料,ppt演讲 e; hemeter 1.0CM above; going it alone type shrubs requirements with trunk, and points branch uniform, base diameter in 2.0CM abovlength; vine health seedlings, and should points branch uniform, and main article number 5 branch above, and main article dia ndardigh reached provides standard; creeping type shrubs requirements at least has 3 branch above main branch reached provides stamain collateral distribution uniform, and main branch number not less than 5 branch, at least has 3 branch above irrigation h ere are primary. (4) shrubs class seedlings: tufted type shrubs requirements irrigation bundle full, and5 main branch, trunk diameter of not less than 4cm, branch point is not less than 2.5M; coniferous trees with the spindle, th-atively consistent, with 3be relrm distribution of main branches, branches, trunk diameter above 3.0CM; make trees of broadleaved trees branch height should damage, looping root amputation at the wound to prevent infection. (3) category tree seedlings: a spindle should have a unifoStems, root cause mechanical 12free.-shaped full, normal color, root system, pest and disease-free. (2) the project should have growth robust, lush, Crown-full, normal color, root system, pest and diseaseshaped -cifications can be large, so as to achieve ecological effect in a short time. Seedlings should have ... Strong, lush, Crownon requirements: (1) engineering seedling selection of cooked goods, provisions relating to plant size. Plant procurement spelectiimportant works. Also planted phase of this project must be carried out by the local soil improvement project. 3, seedling se ering of the project was to create the basis for plant growth, soil, it can be said is the garden project, is one of the mostenginen of landscaping, the overall goal is to create a good living environment for plants, create a garden and green space. Plant 5cm). 2, planting garden of foundation engineering projects from planning to the construction stage, focus on after completioond 2~l, and pH 5.5~7.0, humidity 30~70%, completely loose, Lawn planting soil roughness (soil surface should be lower than teeth p(CM) planting soil should selection for plant growth of selective soil, as humic acid soil, and lawn fertilizer, and peat soi120 lawn to was small shrubs big shrubs shallow root trees deep root trees soil thickness 30 (CM) 30 (CM) 45 (CM) 60 (CM) 90 (CM) imum planting soil thickness should meet Xia table (construction figure Shang indicate of except) vegetation type herb flowernce. Garden plant growth by required of minsize seedlingshe primary analysis of soil physical and chemical properties, such as pests, disinfection, pest control in adva-ion in layers to ensure that plants are firmly rooted in the ground, supported by largeompactnd suitable to avoid lines, planting pits should be greater than the minimum thickness requirements, planting soil backfill c, seedling planting project plants should be located according to the drawings, and with reference to the national standard aity. 4pecifications, flowering shrubs such as rhododendron plants should select color uniform varieties, planting interval and denstree is beautiful, high ornamental value of individual plants. (6) design should be selected when the bushes planted plant sental rs old. All plants are shrubs should meet the specifications. (5) the solitary trees should be selected single planting ornamdge with shrubs requirements irrigation bundle full, and points branch uniform, and dry lower leaves no bare, More than 2 yea
本文档为【珠海旅游人数统计分析报告】,请使用软件OFFICE或WPS软件打开。作品中的文字与图均可以修改和编辑, 图片更改请在作品中右键图片并更换,文字修改请直接点击文字进行修改,也可以新增和删除文档中的内容。
该文档来自用户分享,如有侵权行为请发邮件ishare@vip.sina.com联系网站客服,我们会及时删除。
[版权声明] 本站所有资料为用户分享产生,若发现您的权利被侵害,请联系客服邮件isharekefu@iask.cn,我们尽快处理。
本作品所展示的图片、画像、字体、音乐的版权可能需版权方额外授权,请谨慎使用。
网站提供的党政主题相关内容(国旗、国徽、党徽..)目的在于配合国家政策宣传,仅限个人学习分享使用,禁止用于任何广告和商用目的。
下载需要: 免费 已有0 人下载
最新资料
资料动态
专题动态
is_769254
暂无简介~
格式:doc
大小:219KB
软件:Word
页数:40
分类:
上传时间:2018-11-21
浏览量:69